Eaton Cooper Power Series, 600 A 15 kV, 600 A 25 kV class Installation Instructions Manual

COOPER POWER
SERIES
Loadbreak Apparatus Connectors
MN650021EN
600 A 15 and 25 kV class Cleer loadbreak standoff bushing installation instructions
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY
The information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation’s (“Eaton”) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser.
THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES.
In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other­wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recom­mendations and descriptions contained herein. The information contained in this manual is subject to change without notice.
ii CLEER LOADBREAK STANDOFF BUSHING INSTALLATION INSTRUCTIONS MN650021EN March 2016
Contents
SAFETY INFORMATION
Safety Information .............................................................................iv
PRODUCT INFORMATION
Introduction ...................................................................................1
Acceptance and Initial Inspection...................................................................1
Handling and Storage ............................................................................1
Standards .....................................................................................1
INSTALLATION PROCEDURE
Equipment required .............................................................................2
Direct wall mount ...............................................................................2
Parking stand mount ............................................................................2
iiiCLEER LOADBREAK STANDOFF BUSHING INSTALLATION INSTRUCTIONS MN650021EN March 2016