EarthLinked HWM-1836, HWM-5472, HWM-4248 Installation, Operation & Maintenance Manual

Page 1
EarthLinked®
Hydronic Water Module
Installation, Operation & Maintenance Manual
for
Radiant Panel Hydronic Heat Only Systems
HWM-H-IOM (10/14) Copyright 2014 Earthlinked Technologies, Inc
Page 2
IMPORTANT! FAILURE OF THE INSTALLER TO PROVIDE ADEQUATE ANTIFREEZE SOLUTION PROTECTION IN EARTHLINKED® RADIANT PANEL HYDRONIC HEATING AND/OR CHILLED WATER COOLING SYSTEMS AT THE TIME OF SYSTEM START-UP WILL VOID THE EARTHLINKED® LIMITED WARRANTY FOR HEATING AND COOLING SYSTEMS.
Disclaimer
This manual contains instructions for the EarthLinked® Hydronic Water Module which is combined with other EarthLinked® system components, field specified hydronic heating components, thermostats, storage water heaters, storage water tanks and associated fittings, controls and piping.
EarthLinked® Technologies manufactures and sells only the EarthLinked® system components and the performance information contained herein is based on performance of EarthLinked® Technologies’ supplied Products.
Therefore, EarthLinked® Technologies shall not be liable for any defect, unsatisfactory performance, damage or loss, whether direct or consequential, relative to the design, manufacture, construction, application or installation of the above mentioned field
specified items.
Proper installation and servicing of the EarthLinked® Heating and Cooling System is essential to its reliable performance. All EarthLinked® systems must be installed and serviced by an ETI authorized installer. Installation and service must be made in accordance with the instructions set forth in this manual. Failure to provide installation and service by an ETI authorized installer in a manner consistent with the subject manual will nullify the limited warranty coverage for the system.
tel. 863-701-0096 ● fax 863-701-7796
info@earthlinked.com ● www.earthlinked.com
HWM-H-IOM (10/14) Page 2
Earthlinked Technologies, Inc.
4151 South Pipkin Road Lakeland, Florida 33811
CSI # 23 80 00
Page 3
Table of Contents
1. Inspection/Pre-Installation ........................................................................................................ 5
A. Inspection ............................................................................................................................. 5
B. Pre-Installation ...................................................................................................................... 6
2. General System Layout ............................................................................................................ 7
3. Application ............................................................................................................................... 8
4. The Primary Circuit ................................................................ .................................................. 9
A. Plumbing ............................................................................................................................... 9
B. Antifreeze Protection ........................................................................................................... 11
C. Water Quality ................................ ...................................................................................... 13
D. Storage Water Heater Sizing and Connections .................................................................. 14
E. HWM Dimensions and Component Information .................................................................. 14
F. Refrigerant Piping ............................................................................................................... 16
5. Controls and Electrical ........................................................................................................... 17
A. Hydronic Heating Only ................................................................ ........................................ 17
B. HWM Freeze Protection Thermostat ................................................................ ................... 19
6. Start-Up ................................................................................................................................. 20
7. Heat Exchanger Maintenance ................................................................................................ 22
8. Tools and Equipment ............................................................................................................. 26
9. Index ...................................................................................................................................... 27
HWM-H-IOM (10/14) Page 3
Page 4
List of Figures
Figure 1. Matching Component Model Numbers ................................................................................ 5
Figure 2. General Layout of System Components .............................................................................. 7
Figure 3. Typical Radiant Panel Hydronic Heating System ................................................................ 8
Figure 4. Typical HWM Primary Circuit Plumbing ............................................................................... 9
Figure 5a. Propylene Glycol Freeze Protection Table ..................................................................... 11
Figure 5b. Hydronic System Water Quality Parameters ................................................................... 13
Figure 6. Storage Tank Capacities and Pipe Sizes .......................................................................... 14
Figure 7. Hydronic Water Module (HWM) ........................................................................................ 15
Figure 8a. Minimum Water Pipe, Fitting and Strainer Sizes to Storage Water Heater ...................... 16
Figure 8b. Flowmeter Kit ................................ ................................................................ .................. 16
Figure 8c. (Part 1 of 2) Electrical Field Wiring – Hydronic Heating (HWM) ....................................... 17
Figure 8c. (Part 2 of 2) Electrical Field Wiring – Hydronic Heating (HWM) ....................................... 18
Figure 8d. Three-Step Electrical Installation for Freeze Protection Thermostat ................................ 19
Figure 9. Maximum Operating Conditions (R-410A) ......................................................................... 21
Figure 10. Maximum Operating Conditions (R-407C) ...................................................................... 21
Figure 11. Minimum Heat Exchanger Water Flow Rates .................................................................. 22
Figure 12. Minimum Heat Exchanger Propylene Glycol/Water Solution Flow Rates ........................ 23
Figure 13. HWM Heat Exchanger Cleaning Set-up .......................................................................... 24
HWM-H-IOM (10/14) Page 4
Page 5
1. Inspection/Pre-Installation
Compressor Unit
Hydronic Water Module
-018, -024, -030, -036
HWM-1836
-042, -048
HWM-4248
-054, -060, -068, -072
HWM-5472
IMPORTANT!
The hydronic water modules listed below can be used in HEAT ONLY applications
Warning!
WEAR ADEQUATE PROTECTIVE CLOTHING AND PRACTICE ALL APPLICABLE SAFETEY PRECAUTIONS WHILE INSTALLING THIS EQUIPMENT. FAILURE TO DO SO MAY RESULT IN EQUIPMENT AND/OR PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.
A. Inspection
Upon receipt of the equipment, carefully check the shipment against the bill of lading. Reference EarthLinked® matching system component model numbers in Figure 1. Make sure all units have been received and model numbers are the same as those ordered.
Figure 1. Matching Component Model Numbers
Inspect the carton or crating of each unit, and inspect each unit for damage. Assure the carrier makes proper notation of any shortages or damage on all copies of the freight bill and he completes a common carrier inspection report. Concealed damage not discovered during unloading must be reported to the carrier within 15 days of receipt of shipment. If not filed
within 15 days, the freight company can deny the claim without recourse. Note: it is the responsibility of the purchaser to file all necessary claims with the carrier.
Equipment should be stored in its packaging in a clean, dry area. Store equipment in an upright position at all times. Equipment is to be stacked in accordance with the notation on the packaging. DO NOT remove equipment from shipping cartons until equipment is required
for installation.
Cover equipment on the job site with either shipping cartons, vinyl film or an equivalent protective covering. In areas where painting, plastering and/or spraying has not been completed, all due precautions must be taken to avoid physical damage to the equipment and contamination by foreign material. Physical damage and contamination may prevent proper start-up and may result in costly equipment clean up. Examine all equipment before installing.
HWM-H-IOM (10/14) Page 5
Page 6
B. Pre-Installation
IMPORTANT! To avoid equipment damage, DO NOT use this equipment as a source of
heating or cooling during the construction process. The mechanical components may become clogged with construction dirt and debris which may cause system damage.
Prior to installing the Hydronic Water Module and other EarthLinked® space heating and cooling system above-ground components, you will need tools and equipment listed in Section 8 to properly install the system.
Installation of the Hydronic Water Module must be done in accordance with this manual. Prepare the Hydronic Water Module (HWM) for installation as follows:
1. Compare the data on the unit nameplate or packaging with ordering and shipping information to verify the correct unit has been shipped (See Figure 1.)
2. Keep the HWM covered with the packaging until installation is begun and all plastering, painting, etc. is finished.
3. Verify refrigerant tubing is free of kinks or dents.
4. Inspect all electrical connections. Connections must be clean and tight at the terminals.
HWM-H-IOM (10/14) Page 6
Page 7
2. General System Layout
Guidelines for the general layout of the Hydronic Water Module and other EarthLinked® system components are shown in Figure 2.
Figure 2. General Layout of System Components
HWM-H-IOM (10/14) Page 7
Page 8
3. Application
IMPORTANT! This HWM series hydronic water module may be utilized with R-104A and R-
407C systems when the only function is to heat hydronic water. See example above. It cannot be utilized with R-410A or R-407C systems when its
function is to chill water.
Typical application of the Hydronic Water Module to radiant panel hydronic heating is illustrated in Figure 3.
Figure 3. Typical Radiant Panel Hydronic Heating System
HWM-H-IOM (10/14) Page 8
Page 9
4. The Primary Circuit
IMPORTANT!
The hydronic water module (HWM) is to be mounted on a wall or fixed rigidly in place. The HWM is to be placed no more than 10 FEET AWAY
FROM THE STORAGE WATER HEATER. Orient the HWM with “pipes
up” only. All interconnecting water piping between the HWM and the
water tank are to be insulated with ½” wall thickness Armflex
®
, Insul-
Lock® or the equivalent insulation.
A. Plumbing
The primary circuit in a typical HWM installation is shown in Figure 4.
Figure 4. Typical HWM Primary Circuit Plumbing
HWM-H-IOM (10/14) Page 9
Page 10
The components are as follows:
WARNING!
The heat exchanger must be isolated from the water system when the
system undergoes a “superchlorination” or “shock chlorination”
flushing process. Closing the isolation valves as shown in Figure 4 prior to initiating the system flushing process isolates the heat exchanger. The water entering the heat exchanger after the system flushing must not exceed a chlorine level consistent with the local municipal water purification standards. Failure to isolate the heat exchanger will damage the heat exchanger causing system failure. Allowing highly chlorinated water to enter the heat exchanger will void the EarthLinked® Limited Warranty.
1. Flowmeter: Model ETI-A1-116000-1 hydronic water/antifreeze solution flowmeter is available from ETI and is field calibrated for the specific antifreeze mixture. The kit includes calibration equipment.
2. Strainer: Models ST-1836 (for 1.5 thru 3.0 ton systems) and ST-4272 (for 3.5 thru 6.0 ton systems) are 20 mesh, brass, inline strainers, available from ETI and necessary to trap particles and maintain proper flow through the brazed plate heat exchanger channels.
3. Temperature Controller: Model HHK-1872 is a hydronic heating controller. This controller can be mounted remotely and comes with a capillary tube 6 feet long, thermal bulb, thermal paste and the NPT thermal well insert and is available from ETI.
4. Storage Water Heater: The GSTE Series storage water heaters are available from ETI in 60, 80 and 119 US Gallon capacities, and are designed for use with the EarthLinked® geothermal systems. They are equipped with a 4.5 kW supplemental heater which satisfies the ETI requirement for a minimum of 20% supplemental heat.
5. Other Plumbing Components and Parts: Gate valves, unions, copper pipe, pipe insulation, etc. meeting USA industry and local code standards are commercially available through plumbing supply outlets.
All plumbing installations are to be in accordance with the applicable local and national codes. To protect the brazed plate heat exchanger from damage during cooling operation when the heat exchanger is producing chilled water, a factory installed thermal switch at the outlet of the heat exchanger will turn the compressor OFF when the chilled water temperature drops to 38°F.
HWM-H-IOM (10/14) Page 10
Page 11
B. Antifreeze Protection
TEMPERATURE, °F
PROPYLENE GLYCOL, %
WATER SOLUTION
MULTIPLIER FACTOR (WSMF)
18
20
x 1.03
8
30
x 1.07
-7
40
x 1.11
-29
50
x 1.16
WARNING!
ALWAYS REMOVE THE ANODE ROD(S) FROM THE STORAGE WATER TANK OR HEATER UTILIZED IN A RADIANT PANEL HYDRONIC HEATING AND/OR COOLING SYSTEM. IF THE ANODE ROD(S) ARE NOT REMOVED, THE PROPYLENE-GLYCOL SOLUTION WILL REACT WITH THE ANODE ROD(S) TO CREATE PARTICLES THAT BLOCK FLOW AND CAUSE SYSTEM FAILURE.
IMPORTANT! Because addition of propylene-glycol to water changes the specific heat of water, the required flow rate of propylene-glycol solution (for the same heat transfer as water) must be increased by the water solution multiplier factor shown in the table above. See Section 7 for details.
IMPORTANT! FAILURE OF THE INSTALLER TO PROVIDE ADEQUATE ANTIFREEZE SOLUTION PROTECTION IN EARTHLINKED® RADIANT PANEL HYDRONIC HEATING SYSTEMS AT THE TIME OF SYSTEM START-UP WILL VOID THE EARTHLINKED® LIMITED WARRANTY FOR HEATING AND COOLING SYSTEMS.
When the HWM hydronic water module is applied to radiant panel hydronic heating, the water circulating system must be protected from potential damage due to freeze-up by utilizing an adequate antifreeze solution. The antifreeze protection is provided by the installer prior to the EarthLinked® system start-up.
Propylene-glycol antifreeze solution with an inhibitor is the type of antifreeze solution required for EarthLinked® products utilized in radiant panel hydronic heating systems. These systems shall be freeze protected consistent with the application-specific minimum temperature, as shown in the table below. Propylene-glycol antifreeze solutions should always be in the range of 20% to 50% by volume, as indicated in the Figure 5a.
Figure 5a. Propylene Glycol Freeze Protection Table
Propylene-glycol can be purchased in the straight form and mixed with an inhibitor prior to filling the system, or it can be purchased as inhibited propylene-glycol. The following are examples of manufacturers for the above:
HWM-H-IOM (10/14) Page 11
Page 12
Straight propylene-glycol: Chemical Specialties, Inc. (www.chemicalspec.com/spg.html) Inhibitor: Nu-Calgon Products, Ty-lon B20 (www.nucalgon.com/products) Inhibited propylene-glycol: Houghton Chemical Corp., SAFE-T-THERM®, www.houghton.com/fluids/safe-t-therm/index.html)
General guidelines for introducing propylene glycol into the water circulating system follow. The manufacturer’s specific instructions and industry standards always take precedence when introducing propylene-glycol to the system.
Calculate the quantity of inhibited propylene-glycol (fluid) required to achieve the
desired results.
Introduce a sufficient quantity of water to the system and pressure check to ensure a
sealed system.
Drain some water from the system to provide enough volume for the calculated
amount of fluid.
Add the correct amount of fluid and any water needed to completely refill the system,
allowing for liquid expansion due to operating temperature.
Circulate the inhibited propylene-glycol antifreeze solution for at least 24 hours to
ensure complete mixing. Check the liquid concentration to assure that the correct mixture is obtained.
HWM-H-IOM (10/14) Page 12
Page 13
C. Water Quality
Parameter
Optimal Conditions
Comments
Glycol Freeze
Protection
20% to 50%
Below 20% can promote the growth of bacteria. Concentrations higher than 50% will dramatically reduce the heat transfer ability. Glycol seepage can occur at o-rings and seals.
Corrosion inhibitor
Molybdate inhibitor
or
Nitrite inhibitor
100-150ppm
800-1200ppm
Without the addition of Nitrite or Molybdate inhibitors, corrosion of the metallic components will begin and eventually lead to leaks.
pH
9-10.5 pH units
A pH below 9.0 will allow the corrosion of steel and above
10.5 will allow the corrosion of brass and copper.
Conductivity
700-3200µS/cm
Conductivity above 3500µS/cm will cause the water to become physically abrasive and damage the o-rings. Addition of chemicals to the water will raise the conductivity.
Hardness
100-300ppm
Artificially soft water can be aggressive to the system. The use of unsoftened water is recommended. Do not use distilled or purified water.
Bacteria/Mold
No Bacteria or
Mold
The growth of bacteria will cause erosion of seals and the deposit of a bacterial slime will clog the system. Bacteria can attack the o-rings and cause premature failure. Glycol above 20% will kill any bacteria.
IMPORTANT
THE SERVICES OF A QUALIFIED WATER TREATMENT SPECIALIST ARE REQUIRED FOR THE APPROPRIATE WATER ANALYSIS AND TREATMENT.
IMPORTANT
THE SERVICES OF A QUALIFIED WATER TREATMENT SPECIALIST ARE REQUIRED FOR THE APPROPRIATE WATER ANALYSIS AND TREATMENT.
IMPORTANT!
Always follow the propylene-glycol manufacturer’s instructions concerning the water quality specifications before filling the water circulating system.
Water quality in hydronic systems is important to the life and efficiency of the system. Water of poor quality can cause a decrease in heat transfer ability and cause leaks.
Ensuring proper quality water is a key step in the installation of the hydronic water module (HWM) and circulating water system.
Water quality parameters and the recommended ranges are listed in Figure 5b. The antifreeze manufacturer’s water quality requirements take precedence over the ranges listed in Figure 5b.
Figure 5b. Hydronic System Water Quality Parameters
HWM-H-IOM (10/14) Page 13
Page 14
D. Storage Water Heater Sizing and Connections
Compressor Unit
Model/Capacity,
BTUH
HWM
Model
ETI Storage
Water Heater Size,
US Gallons
ETI Storage
Water Heater
Element Rating, kW
Minimum Nominal
Type L Hard Copper
Pipe & Fittings, inches
-018/18,000
-1836
60
4.5
3/4
-024/24,000
-1836
60
4.5
3/4
-030/30,000
-1836
60
4.5
1
-036/36,000
-1836
60
4.5
1
-042/42,000
-4248
80
4.5
1-1/2
-048/48,000
-4248
80
4.5
1-1/2
-054/54,000
-5472
80
4.5
1-1/2
-060/60,000
-5472
80
4.5
1-1/2
-072/72,000
-5472
80
4.5
1-1/2
IMPORTANT A STORAGE WATER HEATER USED FOR HYDRONIC HEATING MUST
BE EQUIPPED WITH SUPPLEMENTAL ELECTRIC HEATING WITH A RATING OF AT LEAST 20% OF THE DESIGN HEATING LOAD. FAILURE TO DO SO WILL VOID THE EARTHLINKED® HEATING AND COOLING SYSTEM LIMITED WARRANTY.
Storage water heaters are necessary with EarthLinked® radiant panel hydronic heating systems, as typically illustrated in Figures 3 and 4.
ETI Models 60, 80 or 119 GSTE storage water heaters are configured specifically for hydronic heating and meet all requirements for these applications.
Recommended water storage tank capacities are shown in Figure 6, based on the nominal tonnage of the compressor unit specified.
E. HWM Dimensions and Component Information
The Hydronic Water Module physical dimensions as well as water solution piping connections are illustrated in Figure 7.
HWM-H-IOM (10/14) Page 14
Figure 6. Storage Tank Capacities and Pipe Sizes
Page 15
Figure 7. Hydronic Water Module (HWM)
HWM-H-IOM (10/14) Page 15
Page 16
Figure 8a lists the minimum nominal Type L hard copper pipe and fitting sizes, and the strainer
Compressor Unit Size
& Capacity, BTUH
HWM/DWM
Models
Minimum Nominal Type L
Hard Copper Pipe and
Fittings, Inches
ETI Strainer
Model, Size
-018 (18,000)
-1836 3/4
ST-1836
1in. FPT
-024 (24,000)
3/4
-030 (30,000)
1
-036 (36,000)
1
-042 (42,000)
-4248
1-1/2
ST-4272
1-1/2in FPT
-048 (48,000)
1-1/2
-054 (54,000)
-5472
1-1/2
-060 (60,000)
1-1/2
-072 (72,000)
1-1/2
IMPORTANT!
Maximum hot water temperature, from the Hydronic Water Module is 110°F.
required for the primary circuit between the hot water module (HWM) and the storage water heater.
Figure 8a. Minimum Water Pipe, Fitting and Strainer Sizes to Storage Water Heater
The flow meter illustrated in Figure 4 is an important component of the system to (1) commission the performance of the system at startup and (2) determine when maintenance to the system strainer and/or HWM heat exchanger is required. (See Maintenance in Section 7.) ETI part number ETI-A1-116000-1 flowmeter kit has a range of 5-50 GPM and can be field calibrated for the appropriate antifreeze mixture for the specific application. The kit includes the flowmeter and the 5 gallon calibration container.
The flow meter kit (see Figure 8b) may be purchased at http://www.buygpi.com/eti-a1-116000-
1.aspx.
Figure 8b. Flowmeter Kit
F. Refrigerant Piping
Refrigerant piping connections and line set sizes are listed in Figure 7.
HWM-H-IOM (10/14) Page 16
Page 17
5. Controls and Electrical
IMPORTANT When the Hydronic Water Module (HWM) is being installed with an SC or SD Series Compressor Unit, the following Pump Wire Kit must be field installed:
PW1-1872 for 230/208-1-60 and 230/208-3-60 power supply
A. Hydronic Heating Only
The electrical field wiring for the HHK-1872 temperature controller and the electric heat element and thermostat are illustrated in Figure 8c (Part 1 of 2) and Figure 8c (Part 2 of 2).
Figure 8c. (Part 1 of 2) Electrical Field Wiring – Hydronic Heating (HWM)
HWM-H-IOM (10/14) Page 17
Page 18
Figure 8c. (Part 2 of 2) Electrical Field Wiring – Hydronic Heating (HWM)
HWM-H-IOM (10/14) Page 18
Page 19
B. HWM Freeze Protection Thermostat
1. The freeze protection thermostat is factory installed. The thermostat wiring must be connected when the HWM is installed. Run the wire through the electrical port in the top panel of the Hydronic Water Module cabinet. After attaching the wire to the switch terminals, run it into the Compressor Unit (using a control wiring port), in accordance with applicable electrical codes.
2. Once the freeze protection switch wire leads are inside the Compressor Unit, locate the lock­in relay in the Compressor Unit electric box.
3. Proceed to make the electrical connections as shown in the three steps illustrated in Figure 8d. Check all electrical connections to ensure a tight fit and good contact.
Figure 8d. Three-Step Electrical Installation for Freeze Protection Thermostat
4. Replace the cabinet cover to the HWM Hydronic Water Module.
5. If the water solution temperature drops to 38°F, the pre-set switch will trigger and cause the lock-in relay to terminate power to the compressor. The system requires a manual restart.
6. Follow the Start-Up Procedure in Section 6.
HWM-H-IOM (10/14) Page 19
Page 20
6. Start-Up
The following conditions must be met before starting the HWM:
The toggle switch on the HWM cabinet must be “OFF”. The system has been charged according to instructions. Heating elements in the hot water storage tank are “OFF”. Temperature of water in hot water storage tank is less than 100°F. HWM pump is primed and tank water pressure is normal. Gage manifold set is connected to high and low pressure connections on the compressor
unit.
The storage water heater temperature, controller is adjusted to the highest desired water
temperature, setting (110°F maximum).
 An accurate temperature, sensor is connected to the “Water Out” tube of the HWM and
insulated from ambient air temperature.
The HWM start-up steps are as follows:
1. Turn the HWM toggle switch to “ON”.
2. Start system running and monitor compressor discharge pressure and HWM “Water Out” temperature, as water temperature, rises.
3. If compressor discharge pressure reaches 475 psig (R-410A) or 350 psig (R-407C) before desired hot water temperature, is achieved, adjust the storage tank temperature, controller setting to turn the compressor off, or (next):
4. When “Water Out” temperature, is achieved (pressure < 475 psig for R-410A or < 350 psig for R-407C), adjust water storage tank temperature, controller to turn compressor unit “OFF”. Reference Figures 9 and 10.
5. The water storage tank temperature, controller setting should be verified by draining some hot water from the tank and cycling the system again.
HWM-H-IOM (10/14) Page 20
Page 21
Figure 9. Maximum Operating Conditions (R-410A)
Figure 10. Maximum Operating Conditions (R-407C)
HWM-H-IOM (10/14) Page 21
Page 22
7. Heat Exchanger Maintenance
COMPRESSOR UNIT SIZE
& CAPACITY, BTUH
HWM
MODELS
MIN. WATER
FLOW RATE,
GPM
-018 (18,000)
-1836
3.0
-024 (24,000)
-1836
4.0
-030 (30,000)
-1836
5.0
-036 (36,000)
-1836
6.0
-042 (42,000)
-4248
7.0
-048 (48,000)
-4248
8.0
-054 (54,000)
-5472
9.0
-060 (60,000)
-5472
10.0
-072 (72,000)
-5472
12.0
A compact brazed heat exchanger is utilized in the Hydronic Water Module.
The water flow rate designed into each of these heat exchangers is 2 or more gallons per minute per ton of nominal system capacity.
The acceptable water flow rate range for each system is shown in Figures 11 and 12. To ensure the proper performance of the heat exchanger, it is CRITICAL that the flow rate not
drop below the minimum.
Figure 11. Minimum Heat Exchanger Water Flow Rates
HWM-H-IOM (10/14) Page 22
Page 23
Figure 12 shows minimum antifreeze solution flow rates for various mixtures of propylene glycol
Compressor Unit
Size/Capacity
(BTUH)
HWM
Model
Minimum Propylene Glycol/Water Solution Flow
Rates, GPM
20% PG
30% PG
40% PG
50% PG
-018 (18,000)
-1836
3.1
3.2
3.3
3.5
-024 (24,000)
-1836
4.1
4.3
4.4
4.6
-030 (30,000)
-1836
5.2
5.4
5.6
5.8
-036 (36,000)
-1836
6.2
6.4
6.7
7.0
-042 (42,000)
-4248
7.2
7.5
7.8
8.1
-048 (48,000)
-4248
8.2
8.6
8.9
9.3
-054 (54,000)
-5472
9.3
9.7
10.0
10.5
-060 (60,000)
-5472
10.3
10.7
11.1
11.6
-072 (72,000)
-5472
12.4
12.8
13.3
13.9
IMPORTANT!
Be sure the isolation valves are tightly shut before cleaning the heat exchanger.
and water.
Figure 12. Minimum Heat Exchanger Propylene Glycol/Water Solution Flow Rates
To test the solution flow through the hydronic water module, average three solution flow rate readings when the HWM is in continuous operation as shown in Figure 4.
Check the flow rate against the appropriate rates in Figures 11 or 12. If flow rate is less than the appropriate minimum shown in Figures 11 or 12, and the strainer
mesh is clean, the heat exchanger is to be cleaned by setting the system up as noted in Figure 13.
HWM-H-IOM (10/14) Page 23
Page 24
Figure 13. HWM Heat Exchanger Cleaning Set-up
Disconnect power from HWM and be sure pump is off.
Mix heat exchanger cleaning solution in a 55 gallon drum can be sealed and disposed of in accordance with local and federal chemical waste regulations, when the cleaning process is completed.
The concentrated cleaning solution for the heat exchanger cleaning process is liquid ice machine cleaner which is available at any distributor who handles ice machine supplies (Johnstone Supply, W.W. Grainger, etc).
Two gallons of concentrated liquid ice machine cleaner are recommended for each heat exchanger cleaning. Recommended brands and manufacturer order numbers are: Virginia KMP (1 Gallon), Mfr. H419 Nu-Calgon (1 Gallon), Mfr. 4207-48
HWM-H-IOM (10/14) Page 24
Page 25
Mix 1 gallon of concentrated liquid ice machine cleaner per 15 gallons of water in a 55 gallon drum as shown in Figure 13.
Connect the 3/4” ID x 15’ heavy duty hoses to the drain valves and run to the container holding the cleaning solution.
Start the closed circuit cleaning by ensuring that the isolation valves are tightly shut and then energize the HWM water circulating pump.
Circulate the cleaning solution through the HWM closed circuit for approximately an hour or until there is no further change in the color of the cleaning solution.
When cleaning process is completed, turn off the water circulating pump and drain cleaning solution into drum. Safely dispose of hose.
Flush the heat exchanger water system clear of cleaning solution. The flushed mixture is routed into the 55 gallon drum. Approximately 20 gallons of water flushed through the system will ensure cleaning solution has been thoroughly flushed out of the system and into the drum.
Safely dispose of hose. Close and seal drum and safely dispose of drum containing used cleaning solution.
After closing the drain valves, open the isolation valves and purge the system of air. Reconnect power to the HWM in the normal operational mode. Establish a schedule for regular maintenance of the HWM heat exchanger, based on the results
of the first heat exchanger cleaning.
HWM-H-IOM (10/14) Page 25
Page 26
8. Tools and Equipment
The purpose of the following list is to highlight key pieces of equipment, tools and materials necessary for the installation, maintenance and servicing of EarthLinked® Heating and Cooling System HVAC (above ground) equipment. The professional HVAC technician is expected to have a compliment of standard tools for the general servicing of refrigeration equipment.
Equipment, Tools and Materials ITEM DESCRIPTION
1. Vacuum Pump (6 CFM minimum capacity)
2. Evacuation Manifold (for vacuum pump)
3. Digital Vacuum (micron) Gauge
4. Charging/Evacuating Manifold for R-410A and R-407C (quantity of 2)
5. Charging/Hi-Vacuum Hoses (black, quantity of 6)
6. Digital Refrigerant Scale
7. Digital Thermometer
8. Digital Sling Psychrometer
9. Air Flow Meter (for air handlers)
10. Nitrogen Tank with 0 – 600 psig Regulator and Handtruck
11. Oxy-acetylene Welding Torch Set
12. 15% Silver Brazing Alloy
13. Refrigerant Recovery Unit (1/2 #/minute minimum vapor capacity)
14. Recovery Cylinder (50# capacity)
15. Halogen Leak Detector
16. Digital VOM
17. Digital Clamp-on Ammeter
18. Digital Water Flowmeter (3 to 30 gpm)
19. Tubing Cutters
20. Tubing Benders
21. Nut Driver
22. Cordless Drill (3/8”)
23. Swaging Kit
24. Deburring Tool
25. Drill Bit Set
26. Inspection Mirror
HWM-H-IOM (10/14) Page 26
Page 27
9. Index
Circulating ...................................................................................................................................... 28
Compressor ................................ ........................................................................ 5, 15, 17, 22, 25, 26
Connection ............................................................................................................... 6, 15, 18, 21, 22
Controls ......................................................................................................................................... 18
Flow Meter ............................................................................................................................... 17, 29
Flow Rate ................................................................................................................................ 24, 26
Manifold ................................................................................................................................... 22, 29
Model ........................................................................................................................ 5, 15, 17, 25, 26
Piping ...................................................................................................................................... 15, 18
Pump ............................................................................................................................ 22, 27, 28, 29
Refrigerant ........................................................................................................................... 6, 18, 29
Sizing ............................................................................................................................................. 15
Storage Tank ................................................................................................................ 15, 17, 22, 23
System ...................................................................... 5, 6, 7, 8, 13, 15, 17, 20, 22, 23, 24, 26, 28, 29
Temperature .......................................................................................................................11, 22, 23
Water ............................................................. 5, 6, 7, 8, 11, 13, 15, 16, 17, 22, 23, 24, 25, 26, 28, 29
HWM-H-IOM (10/14) Page 27