EarthCore Isokern Standard Series, Isokern Magnum Series, Isokern Magnum 86072 Series Installation, Operation, Maintenance And Owner's Manual

Isokern® EPA Phase 2 Qualied Fireplaces
Installation, Operation, Maintenance and Owner’s Manual
Isokern Standard Series, Magnum Series & Magnum 86072 Series
A PRODUCT OF EARTHCORE INDUSTRIES, LLC.
Important: This manual contains assembly rules, installation steps, guidelines, use and maintenance
instructions for the EPA Phase 2 Qualied Standard Series Fireplace system. This manual must become
accordance with NFPA 58, NFPA 54/ANSI Z223.1 and the gas log manufacturer’s explicit installation, sizing
and operation instructions. It is the responsibility of the general contractor to provide adequate clearances
from all rebox surfaces as specied in this manual.
INSTALLER: Leave this manual with the appliance
CONSUMER: Retain this manual for future reference
Installation Date______________________________
NOTE: The Catalytic Combustor system should be replaced at a minimum in 3 years, maximum of 5 years.
Be Sure to Read Entire Manual Before Beginning Construction.
Contents of this manual may change without prior notication.
THIS FIREPLACE IS DESIGNED for USE with
SOLID WOOD LOGS, PLUMBED PROPANE
(LP) or NATURAL GAS (NG), ONLY
WARNING: If the information in this manual is not followed exactly, a re or explosion may result causing property damage, personal injury or loss of life.
SBCCI NO. 9626 NYC-MEA 241-90-E ICC Report NO. ESR-2316 LA RR NO. 25483 IBC 2006, IRC 2006, IMC 2006 Issued: February, 2010 Revision: 003
Intertek Testing Services Report No. 100244585PRT-006
Omni-Test Laboratories Report No. 257-F-06-3
© 2007 Earthcore Industries, L.L.C.
THIS MANUAL CAN ONLY BE REPRODUCED IN ITS ENTIRETY
TABLE OF CONTENTS
General Information .......................................................................................................................................
Intended Use Statement ......................................................................................................................................
Safety Instructions ..............................................................................................................................................
Warnock-Hersey Listing Label Isokern Standard and Magnum Series..............................................................
EPA Phase 2 Yellow Hangtag ............................................................................................................................
Assembled Firebox & Smoke Dome Dimensions Isokern Standard and Magnum Series .................................
Assembled Firebox & Smoke Dome Dimensions Magnum 86072 Series .......................................................
Component List and Dimensions Isokern Standard Series ................................................................................
Component List and DImensions Magnum Series ............................................................................................
Component List and Dimensions Magnum 86072 Series .................................................................................
Required Clearance to Combustibles .................................................................................................................
Assembly Instructions Isokern Standard and Magnum Series ............................................................................
Assembly of Catalytic Combustor Magnum 86072 Series..................................................................................
Access Modication ..........................................................................................................................................
Firebrick Installation Isokern Standard and Magnum Series .............................................................................
Firebrick Installation Magnum 86072 Series .....................................................................................................
Summary .............................................................................................................................................................
Catalytic Combustor Warranty............................................................................................................................
Fireplace Waranty.................................................................................................................................................
3 4 5 6
7
8 9 10 11 12 13 14-17 18 19
20
21 22-23 24 25
2
General Information
The EPA Phase 2 qualied Standard Series replace system is a prefabricated, refractory modular replace and chimney system designed for eld assembly. The system
consists of interlocking precast parts which are glued together with a masonry adhesive.
The parts of the EPA Phase 2 qualied Standard Series replace system and DM 54 chimney system are precast using
a proprietary mixture of volcanic pumice aggregate and cement. It includes all the parts necessary for assembly of a complete
rebox, smoke dome and chimney system. Each EPA Phase 2 qualied Standard Series replace component is designed for a specic part of the replace such
that only one means for assembly is possible.
The EPA qualied model requires an in-line or
chimney top damper.
The EPA Phase 2 qualied Standard Series replace system requires a EPA Phase 2 qualied Standard Series replace refractory re brick liner be applied to the interior of the rebox. Fire brick must be a minimum thickness of one and one-eighth inch (1-1/8”). The EPA Phase 2 qualied Standard Series replace system is available in one size: thirty-six inch (36”). This unit has a thirty inch (32”) rough opening height before re brick. The DM 54 chimney system is a dual module refractory
chimney system. The basic chimney consists of an outer casing
block and an inner liner with a fourteen inch (14”) diameter ue hole. The chimney components are eld assembled using Earthcore Mortar to glue the components together. The DM 54 chimney system also includes an offset
chimney block component, used to create offsets to the vertical run of the chimney. A brickledge component is available,
designed to support chimney top brick veneer nishes.
Prefabricated masonry chimney termination caps are also available.
The various EPA Phase 2 qualied Standard Series replace system components will be described and illustrated
in the following pages. Close attention should be paid to each
component group’s specications and installation requirements
as described in this manual.
Important: Due to heat and weight issues, the EPA Phase 2
qualied Standard Series replace installations require that the system be built upon a non-combustible concrete slab with no
wood underpinnings supported to footings with concrete or steel
and designed to carry the total weight of the Isokern replace
and chimney system.
The Fire-Lite application of the EPA Phase 2 qualied Standard Series replace replace is designed to be built upon a combustible oor system and will also require a design that will support the total weight of the Isokern replace and chimney system. The FTF-13 or equivalent chimney system only must be used with the Fire-Lite application. Chimney system installations over 57’ - 0” will require
additional support.
3
Intended Use Statement
Intended Product Use Statement: The EPA Phase 2 qualied Standard Series replace and DM 54 chimney systems are intended to burn solid wood
fuel, propane or natural gas. Note: Installation of a gas pipe must comply with the
Standard for Decorative Gas Appliances for Installation in Vented Fireplaces, ANSI Z21.60. This replace is not designed to sit directly on a combustible oor system. The Fire-Lite application is designed to sit on a combustible oor. This replace is intended
for use as a supplemental heat source only and is not intended for heavy use as a primary heating system.
Overring, abusive burning or mistreatment will void
any claims (eg. burning construction debris or other highly
ammable material; tossing, kicking or otherwise forcing logs into the rebox). EPA Phase 2 qualied Standard Series replace and DM 54 chimney systems are conventional indoor or outdoor replaces designed to appear like traditional masonry replaces. EPA Phase 2 qualied Standard Series replace and DM 54
chimney system units are intended for installation in residential homes and other buildings of conventional construction.
Note: The local authority having code jurisdiction should be consulted before installation to determine the need to obtain a permit. Important areas of concern with the installation of
these replaces are: construction of proper load bearing foundation and concrete support slab; code required hearth extension substrates and supports; proper assembly of components; clearance to combustible materials; height of chimney; and, techniques employed in applying nishing materials to the replace opening and hearth extension.
Each of these important topics will be covered in detail throughout this manual. Installation personnel must give special attention to each topic as the installation progresses.
All work performed on, near and adjoining the replace and chimney installation must meet or exceed the specications
and requirements in this manual and the prevailing local building code.
Subsequent renovations, additions of cabinets and storage spaces in the enclosure surrounding the replace are also limited to the specications in this manual and to the prevailing
local building code. Isokern is not responsible for other construction work
around the replace unit.
Note: Do not scale drawings. Illustrations in this manual are
not to scale and are intended to show “typical” installations.
Nominal dimensions are given for design and framing reference only, since actual installations may vary
due to job specic design preferences. Always maintain the
stated minimum clearances to combustible materials. Do not
violate any specic installation requirements. The EPA Phase 2 qualied Standard Series replace and DM 54 chimney system is tested and listed by Warnock Hersey (Intertek Testing Service) - Report No. 315965MID­008 and Report No.315986MID-006 - to UL 127, and UL 103HT - 2006. The EPA qualifying emissions tests were conducted by OMNI-Test Laboratories Report No.: 257-F­06-3. EPA Phase 2 qualied Standard Series replace
systems are also designed for installation in accordance
with the National Fire Protection Association Standard for chimneys, replaces, vents and Solid Fuel-Burning Appliances (NFPA 211). EPA Phase 2 qualied Standard Series replaces are not
listed for use with replace inserts.
WARNING: This replace has not been tested for use with glass doors. To reduce the risk of re or injury, do not install glass
doors.
Some jursdictions require the use of glass doors. If glass doors are used, operate replace with doors in the fully
open position.
4
Safety Instructions
1. Before starting the EPA Phase 2 qualied Standard Series replace and DM 54 chimney installation, read these installation
instructions
carefully to be sure you understand them completely. Failure to follow them could cause replace malfunction resulting in serious
injury or property damage.
2. Always check local building codes governing replaces and replace installations. The EPA Phase 2 qualied Standard Series replace and DM chimney installation must comply with all local,
regional, state and national codes and regulations.
3. EPA Phase 2 qualied Standard Series replace and DM 54
chimney systems are intended for use in any application where
a traditional masonry type replace would apply. The chimney
system must always vent vertically to the outside of the building.
4. Creosote and soot formation and the need for removal: When
wood is burned slowly, it produces tar and other organic vapors which combine with expelled moisture to form creosote. The
creosote vapors condense in the relatively cool chimney ue of a slow burning re. As a result, creosote residue accumulates on the ue lining. When ignited this creosote makes an extremely hot re.
Because of creosote and soot buildup it is necessary
to inspect and clean the replace and chimney prior to use and periodically during the heating season. Cleaning of the replace
and the chimney system should be done annually at a minimum. In colder climates, chimney cleaning may need to be done periodically throughout the heating season.
5. Before servicing, allow the replace to cool. Always shut off any electricity or gas to the replace while working on it.
6. Use only solid fuel or natural or LP gas log sets in this unit. Do not use articial wax based logs, chemical chimney cleaners or ame colorants in this replace.
7. Never use gasoline, kerosene, gasoline-type lantern fuel, charcoal lighter uid, or similar liquids to start or “freshen up” a re in this replace. Keep all ammable liquids at a safe distance from the replace.
8. Always keep the ue damper open when heat is present in the replace.
9. Do not use a replace insert or any other product not specied for use with the EPA Phase 2 qualied Standard Series replace and DM 54 chimney systems unless written authorization is given by Isokern. Failure to heed this warning may cause a re hazard
and will void the Isokern warranty.
10. This replace is not intended to heat an entire home or to be
used as a primary heat source. It is designed to ensure homeowner comfort by providing supplemental heat to the room.
11. Always ensure that an adequate supply of replacement
combustion air from the outside of the house is accessible to
the re to support normal combustion. Fireplaces consume large volumes of air during the normal ring process.
In the event the home is tightly sealed and has modern
energy efcient features, the optional combustion air supply kits
may not provide all the air required to support combustion and the
proper ow of combustion gases up the chimney.
The manufacturer is not responsible for any smoking or related problems that may result from the lack of adequate
air supply owing into the house. It is the responsibility of the builder/contractor to ensure that adequate air supply has been provided for the replace.
12. “Smoke free” operation is not warranted nor is the
manufacturer responsible for inadequate system draft caused by mechanical systems, general construction conditions, inadequate chimney heights, adverse wind conditions or any unusual environmental conditions or factors beyond the
manufacturer’s control.
Caution: When used with the EPA Phase 2 qualied Standard Series replace system, all gas log sets must be operated with
the damper clamped in the fully open position. This includes
unlisted “vent free” log sets. Only listed “vent free” log sets
may be operated with the damper in the closed position.
13. When in doubt about a component’s usability - has visible or suspected physical damage - consult your Isokern distributor or authorized Isokern representative for advice.
14. Modication to STANDARD components not mentioned
in this manual may void claims, listings and approvals and could result in an unsafe and potentially dangerous installation.
Alterations to the STANDARD rebox are allowed
with prior written approval and instructions from Earthcore
Industries, LLC. The installer indemnies the manufacturer
of all claims and under no circumstances will manufacturer be liable for consequential, incidental, indirect, punitive or other damages of any kind or nature, whether foreseeable or
not, based on any claim by any party as to the modications of the Isokern replaces.
15. Wherever insulation is used, the EPA Phase 2 qualied Standard Series replace must not be placed directly against it. Keep all insulation or vapor barriers a minimum of three inches (3”) away from all replace and chimney components.
It is recommended that insulation and vapor barriers, if used,
rst be covered with gypsum board, plywood, particle board
or other material to assure that insulation and vapor barriers remain in place.
WARNING: Do not pack required air spaces with insulation
or other materials.
16. Never leave children unattended when there is a re burning in the replace.
17. Burning some fuels (such as charcoal) can be hazardous
due to the possibility of producing carbon monoxide, a colorless, odorless gas. Early signs of carbon monoxide
poisoning resemble u symptoms, including headaches, dizziness or nausea. Over exposure to carbon monoxide
can lead to illness and death. It is strongly recommended to
install smoke and carbon monoxide alarm / detector devices wherever replaces are in use.
5
Warnock Hersey Listing Label
- Facsimile -
6
EPA Yellow Phase 2 Qualifying Hangtag
PHASE 2 QUALIFIED
U.S. Environmental Protection Agency
Wood-burning Fireplace Program
Phase 2 Qualified models are cleaner and pollute less than those models that have not met this emissions level. Exposure to smoke has been associated with respiratory illness and other health problems. Models that have lower smoke emissions may reduce your risk.
For more information go to www.epa.gov/burnwise
FIREPLACE
SMOKE EMISSIONS RANGE
Lower Emissions
0
Better
2.93 5.1
THIS MODEL
Fireplaces with lower emissions produce less smoke when installed and operated properly.
MANUFACTURER: EARTHCORE INDUSTRIES, LLC
MODEL NO: Series 36 C
PARTICLE EMISSIONS: 2.93 GRAMS/KG OF WOOD BURNED
For proper operation, catalyst must be replaced every 3 to 5 years.
* EPA has determined, based on testing by an accredited independent laboratory and a certification of conformity by a nationally recognized certification body, that this model qualifies at the Phase 2 emissions level for U.S. EPA's Voluntary Fireplace Program.
EPA PHASE 2 EMISSIONS LEVEL
Higher Emissions
12.0
Worse
Isokern Fireplace and Chimney Systems are tested and listed to UL standards: UL 127, ULC S610, and UL 103HT.
The listing label shown above outlines the listed clearances to combustibles and indicates that the units are suitable for use with solid
fuel or listed gas appliances. Refer to the manufacturer’s installation manual for detailed description of clearances to combustibles and all other installation information. A metal listing label similar to that shown above is afxed to each EPA Phase 2 qualied Standard Series replace. Do not remove the listing label from the EPA Phase 2 qualied Standard Series replace replace. In addition, an EPA qualifying label will be afxed to the Catalytic Combustor system. Keep this label in a safe place if needed for permits or building inspection. Prior to beginning installation, contact your local building ofcial to determine the need to obtain a
permit.
7
56"W x 71"H x 29 1/2"D
MINIMUM FRAMING:
46"W x 71"H x 29 1/2"D 52"W x 71"H x 29 1/2"D
C
33”
43"
33”
48
36 42
ISOKERN STANDARD MODEL
28”
53"
43" 49"
A
28" 28”
B
48 1/2"
38 3/8" 44 1/2"
38”
38”
38”
D
E
E
F
28"
F
G
A
D
14"
27 1/4"
A
A
33 1/4”"
C
5"
2 3/4"
G
69 3/4"
69 3/4"
37 1/4"
69 3/4"
WEIGHT
1300 lbs 1420 lbs 1600 lbs
3"
10 3/4”
Catalyst
56"W x 71"H x 29 1/2"D
MINIMUM FRAMING:
46"W x 71"H x 29 1/2"D 52"W x 71"H x 29 1/2"D
"C"
33”
43"
33”
48
36 42
MAGNUM MODEL
28”
53"
43" 49"
"A"
28" 28”
"B"
48 1/2"
38 3/8" 44 1/2"
38”
38”
38”
"D"
"E"
E
F
28"
G
A
D
14"
27 1/4"
A
A
33 1/4”"
C
5"
2 3/4"
69 3/4"
69 3/4"
37 1/4"
69 3/4"
WEIGHT
1300 lbs 1420 lbs 1600 lbs
3"
10 3/4”
Catalyst
24 1/8”
11 3/4”
24 1/8”
7 3/4”
Side View
Front View
Top Plan View
Side View
Front View
Top Plan View
"F"
"G"
Assembled Firebox & Smoke Dome Dimensions -
Isokern Standard and Magnum Series
8
Assembled Firebox & Smoke Dome Dimensions -
Magnum 86072 Series
H
C
D
J
B
G
I
K
Dual Catalysts
Required
O
E
F
A
Right SectionFront Elevation Plan Section
Model
60”
72”
A
73 1/2”
85 1/2 ”
B
28”
28”
C
85 3/4”
85 3/4 ”
D
41”
41”
E
69”
81 1/4”
F
57 1/4”
69 3/4”
G
55 1/2“
65 1/2”
H
25 ¼”
25 ¼”
I
4 3/4”
4 3/4”
J
5”
5”
K
8”
8”
M
14 1/2”
14 1/2”
N
10 3/4”
10 3/4”
55 1/2”
65 1/2”
N
M
O
Minimum Framing
76 1/2” W x 87 1/2” H x 29½” 2650 lbs.
88 1/2” W x 87 1/2” H x 29½” 2950 lbs.
Weight
Catalytic Combustor system Operation
The proper use of a wood burning replace equipped with the Catalytic Combustor system will signicantly reduce the emissions that it produces. Simple fuel considerations with regard to moisture content, size, and quality of fuel will help control the production of wood smoke and ultimately improve the performance of the Catalytic Combustor system and replace efciency. With
proper care, the Catalytic Combustor system will provide years of fuel savings and lowered emissions. By following some simple guidelines, you will ensure maximum performance and longevity.
The smoke that is usually seen coming out of a chimney is essentially a combination of unburned fuel (carbon and hydrogen)
and moisture in the form of water vapor. The Catalytic Combustor system is a technology that provides secondary combustion for the wood burning process. Avoid the use of treated, painted and laminated wood. Never incinerate garbage or other foreign materials. Do not use
articial logs, colored newspaper or petroleum based re starters. Avoid wood with high salt content. All of these materials may
contain compounds which can shorten the life of the catalyst. Wet or unseasoned wood may lower catalytic temperatures and result
in inefcient operation. The Catalytic Combustor system is designed to function at optimum efciency when the replace is burning clean, dry cordwood as replace fuel. A simple visual inspection of the chimney during the wood burning process will determine catalytic
performance.
NOTE: Chimney smoke may be visible during the rst 8-10 minutes of replace operation when the re is rst started and also during the nal 8-10 minutes of operation when the re in the replace is going out. Otherwise, the catalytic system will eliminate approximately 90% of the visible chimney smoke typically produced by a wood burning replace.
9
Component List & Dimensions Isokern Standard Series
Base Plate Part No. Model Qty No. 21 36 1
Model A 36 43”
Smoke Dome - Small
Part No. Model Qty No. 12 36 2
Smoke Dome - Medium
Part No. Model Qty No. 11 46 2
25 1/2”
4”
4”
32 1/2”
Side Wall Part No. Model Qty No. 20 36 6
A
Back Walls
3”
16”
Part No. Model Qty No. 25 36 3
Model A 36 26 3/4”
7 3/4”
Catalytic Filter Part No. Model Qty No. CCB-S 36 1 CCB-S 42 1 CCB-S 46 1
10 5/8”
10 5/8”
25 1/4”
A
5”
24 1/8”
Smoke Dome - Sidewall
Part No. Model Qty No. 34 36 4
43”
25 1/4”
16”
3”
16”
Top Plate Small Part No. Model Qty No. 36 36” W 1
Catalytic Filter Brackets (2)
25 ¼”
22 ½”
10 ¾”
4”
Isokern reserves the right to make changes at any time, without notice in design, materials and specications and also to discontinue styles and products. Please call (800) 642-2920 for an Isokern dealer near you.
10
Component List & Dimensions Magnum Series
28”
BASE PLATE
Part
Fireplace
No.:
Model:
91 28 1
91 92 93
4”
Cut to 35 1/2”
36 42 48
A
Size A:
43” 49” 53”
Qty:
4”
SMOKE DOME
Part
Fireplace
No.:
Model:
12 28 2 11 11 13
32 1/2” 36 42 48
Size A:
43” 43” 53”
Qty:
2 2 2
TOP - SLOPING
Part
Fireplace
No.:
Model:
34 28 2
34 34 34
36 42 46
Qty:
2 2 2
A
1 1 1
16”
53”
25 ¼”
* True Height When Installed
28”
2 3/4”
*16”
BACK WALLS
Part
Fireplace
No.:
Model:
65 28 3
65
36 66 67
42
48
5”
3”
DAMPER SUPPORT (LEFT)
Part
Fireplace
No.:
Model:
94L 28 1 94L 94L
16”
94L
Magnum Catalyst
Part
Fireplace
No.:
Model:
TBD
36
TBD
42
TBD
48 TBD TBD6072
DAMPER BEAMS
Part
Fireplace
No.:
Model: 68 28 2 68 69 70
G:
Cut to 20”
26 3/4” 32 1/4” 37”
G
36 42 48
Qty:
1 1 1
2 2
A:
Cut to 35 1/2”
43”
36
49”
42
53”
48
Qty:
4 4 4
* Model 28 Only
9 ½”
Qty:
1 1 1
11 3/4”
Qty:
2 2 2
5”
5”
8”
G
* Cut as shown; mortar pieces together and stagger joints when stacking for installation.
DAMPER SUPPORT (RIGHT)
Part
Fireplace
No.:
Model:
94R 28 1 94R
36
94R
42
94R
48
A
9 ½”
12”
Qty:
1 1 1
24 1/8”
9 ½”
SIDE WALL
Part
Fireplace
No.:
Model:
90 28 6
90 90 90
36 42 48
Qty:
8 8 8
2”
Isokern reserves the right to make changes at any time, without notice in design, materials and specications and also to discontinue styles and products. Please call (800) 642-2920 for an Isokern dealer near you.
9 ½”
Front of
Smokedome
(above)
11
REAR
8”
FRONT
Component List & Dimensions Magnum 86072 Series
Base Plate
Part FireplaceQuantity: No:Size:
M91 60 2 M91 72 2
Top Medium
Part FireplaceQuantity: No:Size:
11 60 2 11 72 2
Top Large
Part FireplaceQuantity: No:Size:
13 60 6 13 72 6
43"
42 3/4"
4"
Backwall
Part FireplaceQuantity:
28"
5"
No:Size:
M67 60 8 M67 72 8
40"
"2/1 9
Damper Support (Left and Right)
Part
Fireplace
Quantity:
No:Size:
M94L 60 M94L
4"
M94R 60 1
72
1 1
M94R 72 1
Magnum Catalyst
"61
Part
Fireplace
No.:
Model:
TBD TBD TBD
36 42 48
TBD TBD6072
Qty:
1 1 1
2 2
11 3/4”
24 1/8”
52 3/4"
Top Sloping
Part FireplaceQuantity: No:Size:
3"
34 60 4 34 72 4
25 1/4"
Magnum Catalyst Clips:
Part
Fireplace
No.:
Model:
TBD
"61
TBD
60 72
Qty:
3 3
Damper Front & Back
Part FireplaceQuantity: No:Size:
M69 60 4 M69 72 4
"61
12
Required Clearance to Combustibles
The EPA Phase 2 qualied Standard Series replace replace and DM 54 chimney system is tested and listed for installation with “clearance to combustibles” as follows: A: Four inch (4”) clearance to the combustible oor; B: One and one-half inches (1 1/2”) clearance at the Isokern rebox and smoke dome sides and front ; C: One and one half inches (1-1/2”) clearance at the Isokern rebox and smoke dome back wall ; D: Zero inch (0”) Clearance to the DM chimney system. Contact metal pipe manufacturer for specic clearance
information
NOTE: See Magnum Listing Label for Magnum model 86072 Clearances to Combustibles.
CAUTION: Maintain three inches (3”) clearance to insulation and vapor barriers from all rebox, smoke dome ue components.
Note: “Combustibles” are dened as “normal construction materials” and are considered to be: wood framing materials, particle board, mill board, plywood sub-ooring, plywood paneling and wood ooring. Sheathing materials, such as plywood, particle board and drywall may cover the smoke dome front at 0” clearance. All combustible sheathing materials that protrude beyond front of rebox must be held 8” away from the sides of the rebox opening and 8” above the top of the rebox opening. Drywall must be cut 2” back from the rebox opening sides and 8” above the
top of the opening.
Notes:
A. The EPA Phase 2 qualied Standard Series replace replace is rated for installation on a combustible oor system when using the Fire-Lite application only. The EPA Phase 2 qualied Standard Series replace must sit upon a concrete support slab designed to bear the total installed weight of the replace and DM 54 chimney system. These support slabs can have no wood underpinnings. B. Concrete support slabs for the EPA Phase 2 qualied Standard Series replace must provide the noncombustible hearth
extension
substrate needed to support the code required noncombustible hearth extension nish materials. C. All EPA Phase 2 qualied Standard Series replaces shall have hearth extensions of approved noncombustible material
such as brick, tile, or stone that is properly supported and with no combustible material against the underside thereof. Wooden forms used during the construction of hearths and hearth extensions shall be removed when the construction is complete.
D. If a raised replace oor and raised hearth extension are preferred, the raised underlying structure must be built of
noncombustible material and must sit on noncombustible substrate.
D
B
A
Non-Combustible
Floor System
(non-insulation)
D
B
Hearth Extension
(non-combustible)
D
B
C
13
Assembly Instructions - Isokern Standard & Magum Models
NOTE:
General Isokern Assembly Instructions Magnum 86072 Model:
Refer to Magnum Model 86072, 60 & 72 Installation, Operation & Owner’s Manual found with the palletized
components or online at: www.earthcore.co
General Isokern Assembly Instructions:
Earthcore Mortar (a thin-set type masonry adhesive) is used to glue all Isokern components together during eld assembly of the unit. The mortar is supplied dry, in either 15 pound or 50 pound pails.
Earthcore mortar is mixed with clean water to a smooth,
workable texture (without lumps or dry pockets) of a “toothpaste”
consistency. This mixture is suitable for application onto Isokern components by using a masonry grout bag supplied with the unit. Attention should be paid that the mortar mixture is not too thin or runny, as this will not allow the mortar to reach its maximum bonding strength.
Earthcore mortar is squeezed from a grout bag onto the contact surfaces of the Isokern components as they are tted together. It is important that a 1/2” bead of mortar on all the components’ contact surfaces is applied at about 1/2” in from all
edges of the contact surface of the component. When setting the next component onto the mortared contact
surface of the rst component, some mortar should squeeze out along
the face of the entire joint as a sign of complete and proper sealing of the joint. On broader contact surfaces it is advisable to apply several
additional 1/2” beads of the Earthcore Mortar to the area to assure
proper sealing of the joint.
Properly mortared rebox and smoke dome assembly requires approximately 25 pounds (dry measure) of Earthcore mortar.
Broken Components:
Components broken into 2 or 3 pieces can be repaired by
using Earthcore mortar along the break line as the component is set into place. Components broken into multiple small pieces should be discarded and replaced.
Leveling and Aligning Components:
Be sure to assemble all Isokern components level and ush
with adjoining components. Earthcore mortar is not intended to create a mortar joint of any thickness for leveling purposes. Therefore, leveling and alignment adjustments are made by the use of small plastic shims supplied with the unit. The shims can be inserted under a component to level and
align it with adjacent Isokern components. Be sure to re-grout any
and all gaps resulting from shim insertion to maintain components to full bearing.
Notes:
1. Do not mix Earthcore mortar with spirits or anti-freeze agents.
2. The maximum recommended mortar joint thickness at Isokern
components is 1/4”.
3. Earthcore mortar can be troweled over the face of a joint where it has squeezed out while setting components. It is not intended that
the exposed faces of the Isokern components be completely covered with the mortar.
14
Assembly Instructions - Isokern Standard & Magum Models
Installation:
Step 1: Set the EPA Phase 2 qualied Standard Series replace base plate in a full bed of Earthcore Mortar at on a proper
concrete support foundation. Do not set the base plate so that it is
in span. Level the base plate by oating it in a bed of Earthcore Mortar to full bearing against the underlying noncombustible
support surface.
Note: The bottom of the sidewall has a slightly smaller opening than does the top (meaning when the sidewalls are made – the
board side of the sidewall has about a 1/8” narrower opening than does the top. If the replace is stacked where the top sidewall is
placed upside down the clip will have a slight interference when attempting to install. If this occurs, scrape away an area about
1.5” wide by the 1/8”.
Note: If the design preference is for a “ush hearth” (replace oor ush with the room’s oor), the base plate can be omitted from the assembly and the rebox walls built directly on the concrete support slab. The re brick oor of the rebox is then set directly to the concrete support slab. This makes the replace nished re brick oor approximately one and one-half inches (1-1/2”) above the top of the concrete support slab. If the design preference is for a raised hearth (oor of the replace elevated above the room’s oor), then the base plate
can be set on a noncombustible platform that is built up to the desired raised hearth height on the concrete support slab. When calculating raised hearth height be sure to allow
for the three inch (3”) thick base plate plus the one and one half inch (1-1/2”) thick re brick oor in addition to the height of the platform. Whether a ush hearth is preferred or a raised hearth, the combustible oor on front of the replace must be
covered with a noncombustible hearth extension set tight against
the replace front and extending at least 20 inches out from the nished replace and at least 12 inches beyond the nished sides
of the replace opening. For all “raised hearth” construction where concrete
blocks are used to create the raised platform, it is necessary to use the base plate. Be sure to mortar the concrete block platform
together. CMU used for base plate support should be rated ASTM
90.
Note: At all component placement, be sure to mortar all compo- nent contact surfaces with Earthcore Mortar. Check for complete
sealing of each contact joint while assembly progresses.
15
Assembly Instructions - Isokern Standard & Magum Models
Step 2: Set the rst course of the rebox back wall and side walls
into place.
It may be convenient to dry set the rst course of side
wall and back wall into place on the Isokern base plate and then
Earthcore Mortar
First Course Back Wall
Earthcore Mortar
to trace their position on the base plate with a pencil. After outlining the dry set pieces, remove them and
apply Earthcore Mortar to the areas traced on the base plate
where the side walls and back wall are to sit. By doing this, the
rst layer of wall components can be set directly into mortar
already applied to the proper areas on the base plate.
Be sure to put Earthcore Mortar on the contact surfaces
of the vertical joints where the side wall and back wall components connect.
Step 3: Continue assembly of the second, third and fourth courses of the rebox side wall and back wall. Apply mortar to the top
of each layer of wall components, set the next course above into place. Be sure to mortar all vertical joints of the side wall to back wall connection when setting each component to its mate.
Look for some mortar to squeeze out along the joints of
all contact surfaces as a sign that the joint is thoroughly sealed with the approved mortar.
Step 4: When all of the rebox wall components are set, check the top surface of the rebox for level. If necessary, adjust the top
surface of the box assembly for level by inserting a shim between
the lowest wall component and the top surface of the base plate. Any gap created under the wall components during the
Shim leveling process must be lled with mortar to full bearing
against the base plate.
Top Course Back Wall
Step 5: Make sure that the rebox assembly has been set level
and square. Adjust as required while the mortar is still wet.
Make a nal inspection of all contact joints in the rebox assembly to be sure they are properly sealed. Fill any and
all gaps in the assembly, as necessary, with the approved mortar.
Step 6: Take the Catalytic assembly out of the box and verify all components are in tact and Yellow EPA hangtag is attached to the
combustor. The Catalytic kit should contain a Catalytic
Combustor, and two (2) metal angle support brackets.
Note: Remove hangtag from combustor and place in a secure, permanent location. Retention of this hangtag by the owner of the replace is mandatory. If ownership changes, hangtag should
be given to the new homeowner.
Earthcore Mortar
Step 7: Insert support brackets so that the largest angled portion
slides into the side wall cavity toard the front of the sidewall slots. The smaller angles should be facing upward toward the
inside of the rebox.
16
Assembly Instructions - Isokern Standard & Magum Models
Step 8: Center the Catalytic Combustor in the rebox and rest it on top of the support brackets making sure that the lter is equally settled on the brackets. The lter should be set toward the rear of the rebox.
Step 9: If grouting the inside of the sidewalls, leave the top 1 3/4” without grout or else measure and locate the mounting
clip to the exact dimension (based on the thickness of the brick
& mortar used to line the inside of the rebox backwall).
Step 10: Set the back smoke dome component across the rear side walls in a bed of mortar and ush with the back face of the
back wall.
Set the front smoke dome component in mortar across the front side walls ush with the front of the sidewalls.
Step 11: Position the smoke dome’s sloping sidewalls at each
end of the smoke dome components.
The sloping sidewalls t in between the front and rear smoke dome components and also t into the haunches at the ends of the front and rear smoke dome components. Mortar all
contact surfaces thoroughly.
Note: The smoke dome sloping sidewalls have a beveled
bottom edge so that they will sit tight onto the at top of the
side walls.
Step 12: Make sure that all component contact surfaces have
been properly sealed with approved mortar. Check smoke dome front and back walls to see that they are plumb, level and in alignment with mating components. Check alignment of the smoke dome sloping sidewall components to see that they are fully seated.
Step 13: Set the smoke dome top plate into position on top of
the smoke dome wall assembly. One side of the smoke dome top plate shows a thickened center. This side is the bottom face of the top plate.
The fourteen inch (14”) diameter ue hole in the top
plate is centered in the smoke dome from side to side but is offset from front to back.
Make sure that the top plate is set so that the ue hole
is closer to the back wall of the smoke dome assembly.
Be sure to set the smoke dome top plate ush with the
front, back and sides of the smoke dome assembly. All contact surfaces must be properly sealed with the approved mortar.
Note: The completed smoke dome assembly should present a
stable and level surface for setting the ue components.
17
Assembly Instructions - Isokern Magum 86072 Models
18
Assembly Instructions - Access Modication
Through-Wall Accesses:
1. Combustion Air Inlet: Combustion air inlet kits though not required by Isokern may help improve replace operation in homes tightly sealed
and with other ventilating appliances installed. Check local codes for combustion air inlet requirements. The following is a general representation of a generic combustion air kit and not a requirement of Earthcore Industries, LLC. Local building codes prevail and should be checked before installation.
Generic replace combustion air kits typically consist of a sliding stainless steel access door afxed to a three inch (3”) or four inch (4”) diameter stainless steel sleeve approximately twelve inches (12”) long.
An exterior vent with dress plate, weather hood and rodent prevention
screen of a maximum one-quarter inch (1/4”) wire mesh completes the kit. (Figure 20) The access door is tted into the nished re brick lining at the interior sidewall of the rebox. The twelve inch (12”) long sleeve can be introduced into the rebox side wall or back wall by core drilling an appropriately sized hole at the selected rebox location. Keep the top of the four inch (4”) diameter access hole no more than six inches (6”) above the nished rebrick oor. The hole size should allow for a one-quarter inch (1/4”) mortar joint around the air access sleeve for heat expansion. The sleeve passes through the rebox wall and must be connected to metal pipe (by other) - either exible or rigid - that leads
to the source for outside combustion air, as directly as possible from the
EPA Phase 2 qualied Standard Series replace (Few to no bends) with a maximum length of sixty feet (60’).
WARNING: Do not use combustible duct material. Avoid installing a combustion air inlet where the opening could be blocked by snow, bushes or other obstacles. Air inlet must terminate a minimum of three feet below the chimney cap level. Air inlet ducts shall not terminate in attic spaces.
2. Gas Line Feed: For a replace having the provision for installation of
a gas pipe, the provision is intended only for connection to a decorative gas appliance.
CAUTION: When using the decorative appliance, the replace damper
must be set in the fully open position.
Gas line for gas log sets used in the Isokern rebox can be routed through the side wall, back wall or oor of the rebox by drilling an appropriately sized hole using a masonry drill bit.
3. Electrical Line Feed can be routed through the rebox back wall, side walls or oor by drilling an appropriately sized hole using a masonry drill bit. Be sure to follow the gas log appliance manufacturer’s explicit electrical line connection instructions for vented replace installations.
Gas line and electric line must be fed through separate access holes.
CAUTION: All access holes must be grouted with mortar – after line or
conduit feed - to seal any gaps or cracks around line feed conduits.
19
Fire Brick Installation Isokern Standard & Magnum
Fire Brick Installation:
The manufacturer requires that the EPA Phase 2
qualied Standard Series replace rebox be lined with a minimum one and one-eighth (1-1/8”) thick rated re brick. The pattern for the re brick lining is an owner option. Standard N-Type brick mortar is a suitable re brick mortar for the EPA Phase 2 qualied Standard Series replace and good masonry
practices should be followed.
All required through-wall accesses (gas and electrical line feeds and combustion air supply access holes) should be drilled before the required re brick lining is installed. It takes a total of about ve gallons of N-Type brick mortar mix (dry measure) to re brick line a replace. Face joints of one quarter inch (1/4”) to three-eights inch (3/8”) give a good appearance to the nished brickwork
however, this is just a suggestion and other face joint dimensions are also acceptable.
FIREBRICK FLOOR AND BACKWALL (BUILT FIRST)
Step 1. Wet mop the inside of the EPA Phase 2 qualied Standard Series replace with a damp sponge to remove dust and loose particles from the interior before installing re brick.
Step 2. Start the re brick at the front edge of the oor of the Isokern rebox, proceeding inward toward the back.
HINT: Dip each rebrick into water before applying.
Step 3. Next, apply re brick to the back wall of the unit starting
at the bottom of the back wall and working upward to the top of the back wall.
Step 4. Finally, set the side wall re brick by starting at the front edge of the unit’s side wall and working inward toward the back wall re brick.
Isokern makes no claims as to the performance of re brick or re brick mortar(s). It is typical for heat stress cracks to appear in the re bricks in wood burning replaces.
1/2” EXPANSION GAP (BOTH SIDES)
FIREBRICK FLOOR AND BACKWALL (BUILT FIRST)
20
FIRE BRICK FLOOR AND BACK WALL (BUILT FIRST)
EXPANSION
1/2" GAP
FIRE BRICK FLOOR
(BUILT FIRST)
EXPANSION
1/2" GAP
(NO GAPS)
4” Firebrick Required on Side Walls
Fire Brick Installation, Magnum 86072
Fire Brick Installation:
The manufacturer requires that the Magnum 86072 reboxes be lined with a minimum one and one-eighth (1-1/8”) thick re brick on the back and oor of the rebox and four-inch (4”) on the side walls. Thicker re brick may be used as an option. The pattern for the re brick lining is an owner option. Standard N or S type brick mortar is suitable mortar for the replace. Fire brick mortar needs to be suitable to both adhere the re brick to the inside of the rebox and to create the nished face joints of the brick work. Based on a history of eld applications and
experience, a suitable mortar would be as follows:
Mix: * 1/2 bag EC mortar or Six parts masonry mortar (S or N type) * Six parts sand * One part Fire Clay (optional)
* Water to a sticky, toothpaste consistancy
Because of different climates, the use of good masonry practices for your area should also be considered.
It takes about 50 lbs. of mortar mix (dry measure) to re-brick line a Magnum 86072 replace.
Installation Instructions:
1. Wet mop the inside of the replace with a damp sponge to remove dust and loose particles from the interior before re-
bricking.
HINT: Dip each rebrick into water before applying.
2. Face joint dimensions of 1/4” to 3/8” in the brick work is recommended and has the best appearance. Other face joint dimensions are acceptable however smaller joints may not leave
room for heat expansion of re brick.
3. Start the re brick at the front edge of the oor of the Isokern rebox, proceeding inward toward the back. Let the oor brick gap approximately 1/2” off the back wall and side walls. This air space allows heat expansion of the re brick and is to be left empty of mortar. (Figures 8 & 10)
4. Next, apply re brick to the back wall of the unit. The back wall re brick covers the 1/2” expansion gap left at the brick oor along the back wall of the rebox. (Figure 9)
5. Set the side wall re brick by starting at the front edge of the unit’s side wall and working inward toward the back wall re brick. The side wall re brick, when completed, covers the 1/2” expansion gaps where both the oor re brick and the back wall re brick were held off the units side walls. (Figure 10) All required through-wall accesses (gas and electrical line feeds and combustion air supply access holes) should be drilled before the required re brick lining is installed.
Isokern makes no claims as to the performance of re brick or re brick mortar(s). It is typical for heat stress cracks to appear in the re bricks in wood burning replaces.
21
Summary
1. WARNING:
Fireplace and chimney systems will only draught
properly when they are installed according to the instructions, in an appropriate location and with the proper chimney height.
Installing the replace according to the instructions, choosing an
appropriate location, and choosing an appropriate chimney height are the responsibility of the designer and the building contractor. Tightly insulated and sealed homes, two story interior spaces and high vaulted ceilings can cause negative air pressures
within the house which can impair drafting performance. HVAC return air ducts near the replace opening will adversely affect the replace drafting performance.
It is the responsibility of the designer, the building contractor and their mechanical contractor to determine that the
building’s internal air pressures are conducive to positive replace
drafting.
Avoid placing any replace in an area near tall trees,
tall buildings, or high land masses. These structures can reduce
ambient air ow pressure as well as produce down draughts, either of which can impair replace drafting performance.
Earthcore Industries L.L.C. does not warrant drafting and is not responsible for it.
2. EPA Phase 2 qualied Standard Series replace and Fire­Lite Fireplace Curing Instructions:
It is critical that the Isokern masonry elements in the
rebox and smoke dome assembly be dry before ring of the unit. Moisture left in the components from exposure during storage and
shipping, as well as moisture from the installation phase, must be eliminated before the unit is put to its intended use.
The rst step in reducing the ambient moisture is to be sure that the completed replace rest totally in a dried-in setting for a minimum of 28 days after construction of the unit is complete. The next step in curing the replace is to be sure that the rst ve or six res are of short duration. The rst re of the unit can take place once the minimum twenty-eight day drying period has passed. This re should be
especially short.
Start the rst re slowly with a small amount of paper and kindling (small dry wood splits or twigs) and a maximum load of four to six pounds of dry rewood, estimated to be no more than two or three logs each of about three inches (3”) to four inches (4”) diameter. The rst re should burn for no more than thirty to sixty minutes and then allowed to go out. Do not refuel the replace during the rst lighting. A cooling off period of twenty-four hours, at a minimum, should follow the rst re. The second re should be the same as the rst re. The second re should burn for no more than thirty to sixty minutes and allowed to go out. Do not refuel the replace
during the second lighting.
A twenty-four hour cooling off period must be
observed following second lighting.
After the rst and second re, continue use of the unit with three or four small res of short duration (sixty minutes or so) and small fuel load. After these rst ve or six small res of short duration normal use of the replace can proceed. For normal
use the maximum recommended fuel load is twelve to sixteen
pounds of dry rewood at a time. This fuel load is considered to be approximately three to ve cured hardwood logs of about three inches (3”) to six inches (6”) in diameter. As the re burns down, refueling should be only one or two logs
added at a time.
Important: Do not burn construction debris or trash of any
kind in the Fire-Lite replace.
Whereas it is not uncommon for construction debris
and refuse to be burned in a replace by site personnel on
a project that is under construction, this activity must be avoided. It is the responsibility of the building contractor
to insure that the required dry-in period is met and that the
required lighting sequence is performed by the owner or by
the owner’s agent.
3. Log grates are required for burning solid fuel in the Isokern replace. Grates allow for easy air ow up through
the burning logs thus creating a more complete and efcient
burning of the fuel.
4. How to Build a Fire:
First set the replace damper in the full open position. Begin laying the re by placing several pieces of wadded up
paper directly on the log grate. Place kindling (small splits of
dry pine or other dry softwood) on top of the paper, enough
to loosely cover the paper. Next arrange several small, dry hardwood or softwood logs or log splits on top of the kindling layer.
Finally, arrange two or three larger hardwood logs (oak, hickory, etc.) or log splits on top of the stack. Ignite the
paper at the bottom of the stack. The burning paper will ignite
the kindling which will, in turn, set the remaining fuel on re. Be sure to stack all rewood in such a way that it will
settle into the log grate as the paper and kindling layers are
burned away. Additional logs can be set onto the re as each
fueling burns down. Ideally, fuel logs should be of a hardwood species
that have been air dried for one year or longer. Use of cured or
uncured pine logs and uncured hardwood logs for fuel should be avoided. Pine logs and uncured hardwood logs will tend to smolder and burn at relatively low temperatures producing high levels of soot and creosote.
Important: Do not throw, toss, jam, kick or otherwise force
logs into the replace.
22
Summary
WARNING: Never use gasoline, gasoline type lantern fuel,
kerosene, charcoal lighter uid or other similar liquids to start or “freshen up” the re in this replace or in any replace.
WARNING:
If processed solid fuel relogs are used: Do not poke or stir the logs while they are burning. Use only relogs that have been evaluated for the application in replace and refer to relog warnings and caution markings on packaging prior to
use.
5. Avoid over-ring this replace. Some examples of over­ring are:
a. Burning of scrap lumber, construction debris, pine branches
and brush or cardboard boxes;
b. Burning small diameter twigs, branches or any other small
sized combustible materials in quantities which exceed the volume of the normal log re; c. Use of articial wax base logs, trash or other chemicals or
chemically treated combustibles.
WARNING: Over-ring can permanently damage this replace system.
6. Fireplace Doors and Screens:
This replace has not been tested for use with doors. To reduce the risk of re or injury, do not install doors. If doors
are required by the local authority having jurisdiction then
doors must be kept in the fully open position when the replace is in operation. Isokern does not limit the use of replace
screens.
7. Disposal of Ashes:
It is recommended that the rebox be cleaned of
excessive ashes before each use. It is necessary to remove
ashes from the open front of the replace. To do so, proceed in
the following manner:
Allow the re to go out and the ashes to cool for at
least six to eight hours. After the cooling period carefully pick up the ashes
from the rebox with a small, metal replace shovel or other
metal scoop and place them in a metal container with a tight
tting lid.
If possible do not sweep the ashes as this will stir them into the air and disperse them into the room. The closed container of ashes should be placed on
a noncombustible oor or on the ground, well away from all combustible materials, pending nal disposal. If the ashes are
disposed of by burial in soil or otherwise locally dispersed, they should be retained in the closed container until all cinders have thoroughly cooled.
8. Inspection and Cleaning:
At least twice a year in warm climates or monthly during the heating season in colder climates, thoroughly
inspect the Fire-Lite replace and chimney system.
Chimneys must be installed so that access is provided for inspection and cleaning. The chimney should be inspected monthly during the heating season.
Inspect the entire ue from the top down for obstructions such as birds’ nests, leaves, etc. Such obstructions
must be removed.
Check spark arrestor screens for clear ow of smoke
every two to four weeks during the heating season.
Inspect the ue periodically during the heating season
for the presence of soot and creosote build up. If creosote or soot has accumulated, it should be removed to reduce the risk
of chimney re. Have your chimney cleaned by a professional chimney
sweep if you have doubts about your ability to do it.
Use a plastic, wood or steel brush to clean the chimney. Scrub the spark arrestor/chimney cap with a wire
brush.
Remove any chimney cap for ue cleaning from the top. Open the damper in the rebox for cleaning access from
below.
Clean the inner portion of the ue by using a exible
handled chimney cleaning brush.
For straight run ue the proper size brush can be pulled up through the ue from the rebox with the damper open.
If the chimney has an offset chimney section, brush
cleaning from the chimney top down to the offset/return and then from the rebox up to the offset section is the proper
method.
In either case, cover the replace opening with a damp sheet (sealed to the opening with masking tape) before brush
cleaning. Do not remove sheet until the soot has settled. It is advised to vacuum loosened soot. Do not sweep loosened soot as sweeping will disperse soot into the air and about the room.
WARNING: Do not use chemical replace and chimney cleaners that are poured on a hot re. These can be dangerous and generally work only on the ue section nearest the re, leaving the rest of the ue unaffected.
9. Exterior Maintenance:
Annually, at a minimum, check all metal ashings and
weather seals around the exterior chimney where it penetrates
the roof surface; inspect any chimney top spark arrestors, metal
cowlings and weather hoods to make sure they are secure and weather tight.
Seal any cracks or gaps in chimney-to-roof ashings
to prevent possible roof and chimney chase leaks. Inspect any cement chimney cap or clay chimney pot terminations to make sure they are not diverting water into the
structure. Seal any suspected cracks or gaps in these masonry
components.
23
Catalytic Combustor Warranty
Clear Skies warranty obligations for the HearthCAT Emissions Control System are limited to the terms set forth below: Clear Skies Unlimited, Inc. (“Clear Skies”) warrants to the consumer who purchases a new solid fuel burning replace containing a HearthCAT Emission Control System as a new component,
to replace the catalyst at no charge should it cease to function within three years from the date of purchase.
The HearthCAT Catalytic Component is designed to perform efciently for three years of replace operation. ONLY recommended fuels should be burned. Follow the fueling directions in manufacturers operating manual. For warranty purposes, proof of replace or HearthCAT™ purchase is required. Labor for removal and/or re-installation of the catalytic component is not the responsibility of the manufacturer.
This warranty applies only to CS-100 Series HearthCAT™ catalytic components manufactured by Clear Skies Unlimited Inc. For replacement of a Clear Skies catalytic combustor under the conditions of this warranty,
please contact the manufacturer @ www.clearskiesunlimited.com
NEITHER CLEAR SKIES UNLIMITED INC. NOR THE DEALER WHO SELLS THE HEARTHCAT™ EMISSION CONTROL SYSTEM IS RESPONSIBLE FOR INDIRECT, INCIDENTAL, SPECIAL, PUNITIVE OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE IMPROPER USE OF THIS PRODUCT OR THE CONTINUED USE OF THIS PRODUCT BEYOUND THE REQUIRED REPLACEMENT PERIOD.
24
Warranty & Disclaimer
Isokern FIreplace
ISOKERN offers a lifetime warranty for all Isokern components, to be free from defects in materials that
negatively affect system performance from the date of purchase, subject to the terms and conditions of this limited warranty.
This warranty covers only the above stated components, and NO WARRANTY, EXPRESS OR IMPLIED, EXTENDS TO ANY OF THE HARDWARE, FOOTING, VENTS, DUCTING, METAL FLUES, FIRE BRICK OR ACCESSORIES. THIS WARRANTY DOES NOT COVER DRAFTING, SMOKING OR PUFFING OF THE FIREPLACE SYSTEM. Factors beyond the manufacturer's control affect replace drafting, smoking, and pufng, and ISOKERN cannot guarantee these aspects of performance.
If a component is found to be defective under the terms of this warranty the party to whom this warranty is
extended shall, notify ISOKERN, 6899 Philips Industrial Blvd, Jacksonville, Florida 32256, in writing, by registered mail, within thirty (30) days following the discovery of the defect within the lifetime warranty period. The notice shall contain (1) the date of purchase; (2) place of purchase; (3) address of installation; (4) name, address and phone number of the owner; and (5) a brief description of the defect.
ISOKERN, or any division thereof, is not responsible for any labor costs or indirect costs incurred for the
replacement of defective components.
ISOKERN is not responsible for misuse or mishandling of components. Nothing in this warranty makes ISOKERN, or any division thereof, liable in any respect for any injury or damage to the building or structure in which the replace or chimney system has been installed or to persons or property therein arising out of the use, misuse, or installation of properly manufactured ISOKERN product.
ISOKERN, OR ANY DIVISION THEREOF, SHALL NOT BE HELD LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES OR EXPENSES ARISING OUT OF THE USE OF THE FIREPLACES OR CHIMNEY SYSTEMS. ALL SUCH DAMAGES AND EXPENSES ARE HEREBY EXCLUDED.
This warranty is null and void when the replace or chimney systems are not installed pursuant to the installation instructions provided by ISOKERN or local building codes have not been followed completely.
This warranty applies only to those replace and chimney systems installed in the continental United States,
Alaska, and Canada. If any part of this warranty is found to be unenforceable, the remaining parts shall remain in force and effect.
ISOKERN HEREBY DISCLAIMS ALL GUARANTEES AND WARRANTIES, EXPRESS OR IMPLIED, EYOND THE WARRANTIES SET FORTH HEREIN.
Loading...