
PART #368507
Pass-Through Heated Drawers
OPERATING AND INSTALLATION INSTRUCTIONS
CAUTION
INSPECT CONTENTS IMMEDIATELY AND FILE CLAIM WITH DELIVERING CARRIER FOR ANY DAMAGE.
SAVE YOUR BOX AND ALL PACKING MATERIALS.
YOU ARE RESPONSIBLE FOR DAMAGE TO YOUR UNIT IF RETURNED IMPROPERLY PACKED.
Retain this manual for future reference.
Contact this factory, the factory representative or Eagle’s authorized service center in your area to
perform maintenance and repairs.
This unit has been manufactured in accordance with Underwriters Laboratories and NSF International
standards, consult local electrical and sanitation codes for compliance. Please reference the electrical
specifications in this manual to insure that proper amperage and voltage is used for your application. Built-in
units must be installed in compliance with the NEC.
UNPACKING INSTRUCTIONS
Thank you for purchasing our high quality Eagle heated drawer. Please inspect the unit for
any damage before and after unpacking. If any damage is found, please contact the delivering
carrier immediately.
• To unpack the heated drawer, first remove the four 3/8-16 bolts, using a wrench, that secure the unit
to the crate located on the underside of the crating (freestanding unit only).
• Carefully remove the crating from the unit so as to not damage the unit.
• Remove all clear plastic wrap from the exterior of the unit.
• Remove any tape or adhesive that may be holding the drawers closed.
• Please remove any warranty or instruction information from the drawers prior to use and store in
safe location for future reference.
• Remember to properly sanitize and clean the unit before use.
Read all instructions carefully before installing and operating the product.
EG10091 Revised 06/08
• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com
• Phone: 302/653-3000 • (Foodservice) 800/441-8440 • (MHC/Retail) 800/637-5100
• Fax: 302/653-2065
Eagle Foodservice Equipment, Eagle MHC, SpecFAB®, and Retail Display are divisions of Eagle Group. ©2008 by the Eagle Group

REPLACEMENT PARTS LISTING
Item # Part Description Part # Part #
1 THERMO CONTROL KNOB 301986 901986
2 4˝ PLASTIC LEG 303777 303777
3 THERMOSTAT 120-250V 331153 331153
4 PAN 331160 331160
5 THERMOMETER 331214 331214
6 KNOB (PLASTIC) 331218 331218
7 DRAWER PULL 12.812 331221 331221
8 INDICATOR LIGHT 338132-120 346293-240
9 ELEMENT 339167-120 339168-240
10 WIRE CLAMP 339311 339311
11 BULB CLAMP .3125 339314 339314
12 GASKET 368512 368512
13 GASKET 368513 368513
14 HOLD DOWN PLATE 368545 368545
15 GASKET RING 368546 368546
120V Model 240V Model
INSTALLATION INSTRUCTIONS
This unit has been manufactured in accordance with Underwriters Laboratories and NSF International standards, consult local
electrical and sanitation codes for compliance. Please reference the electrical specifications in this manual to insure that proper
amperage and voltage is used for your application. Built-in units must be installed in compliance with the NEC.
Freestanding Units
1. Install the legs into the bottom of the unit by threading them into the nut inserts and tightening securely.
2. Locate the unit in a desired area within reach of an appropriately sized electrical outlet.
3. Place unit on a flat, level surface and check that the unit is level both left-to-right and front-to-back. Adjust the feet as needed for a
level installation.
CAUTION!
LEGS MUST BE INSTALLED PRIOR TO THE OPERATION OF THE UNIT.
TO AVOID DAMAGE, DO NOT LAY UNIT ON ITS FRONT OR BACK SIDE.
2