Eagle DWN-2-240 Installation Manual

PART #339333
Heated Drawers
OPERATING MANUAL AND INSTRUCTIONS
CAUTION
INSPECT CONTENTS IMMEDIATELY AND FILE CLAIM WITH
DELIVERING CARRIER FOR ANY DAMAGE
SAVE YOUR BOX AND ALL PACKING MATERIALS.
YOU ARE RESPONSIBLE FOR DAMAGE TO YOUR UNIT
IF RETURNED IMPROPERLY PACKED.
Retain this manual for future reference.
Contact this factory, the factory representative or Eagle’s authorized service center in your area to
perform maintenance and repairs.
.
This unit has been manufactured in accordance with Underwriters Laboratories and National Sanitation
Foundation standards, consult local electrical and sanitation codes for compliance. Please reference the
electrical specifications in this manual to insure that proper amperage and voltage is used for your application.
Built-in units must be installed in compliance with the NEC.
UNPACKING INSTRUCTIONS
• To unpack the heated drawer, first remove the four 3⁄8˝ bolts, using a wrench, that secure the unit to the crate located on the underside of the crating (freestanding units only).
• Remove all plastic wrap from the exterior of the unit.
• Remove any tape or adhesive that may be holding the drawers closed.
• Please remove any warranty or instruction information from the drawers prior to use and store in safe location for future reference.
• Remember to properly sanitize and clean the unit before use.
Eagle F
vice Equipment, Eagle MHC
oodser
EG9986 Revised 03/05
• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com
• Phone: 302/653-3000 • (Foodser
• Fax: 302/653-2065 or 302/653-3036
AB, and Retail Display are divisions of Eagle Group. ©2005 by the Eagle Group
, SpecF
vice) 800/441-8440 • (MHC/Retail) 800/637-5100
Parts List
2
Loading...
+ 4 hidden pages