DÜRR XR24 Installation manual

Page 1
Installation and Operating Instructions
2006/01
DÜRR Regeneration Unit for X-ray developers
XR 24, XR24 II, XR 24 Nova,
XR 24 Pro
Page 2
Content
1. Notes ........................................................3
1.1 CE - Labeling .................................... 3
1.2 Electromagnetic Compatibility ........... 3
1.3 General Notes................................... 3
1.4 General Safety Information ............... 3
1.5 Combining Appliances ..................... 4
1.6 Electrical Safety Notes .....................4
1.7 Warnings and Symbols.................... 4
2. Product information ..............................4
2.1 Correct Usage ..................................4
2.2 Incorrect usage ................................4
3. Contents ..................................................5
3.1 Accessories ......................................5
3.2 Special Accessories ......................... 5
4. Technical Data ........................................ 5
5.5.
5. Functional Diagram ............................... 6
5.5.
5.1 Regeneration Unit connected to
XR 24, XR 24 II, XR 24 NOVA........... 6
5.2 Regeneration Unit connected to
XR 24 PRO ........................................6
6.6.
6. Functional Description .........................7
6.6.
6.1 Regeneration Unit RU 24 connected to XR 24, XR 24 II,
XR 24 NOVA..................................... 7
6.2 Regeneration Unit RU 24
connected to XR 24 PRO ................. 7
Installation
7. Set-up alternatives for
Regeneration Unit ..................................8
8. Preliminary measures ............................ 9
8.1 Remove front cover .......................... 9
8.2 Remove rear cover ...........................9
8.3 Remove side covers ........................9
9. Hose connections ................................ 10
10. Electrical connections......................... 11
10.1 XR 24, XR 24 II, XR 24 NOVA ......... 11
10.2 XR 24 PRO ...................................... 11
11. Setting the Regeneration Electronics12
11.1 XR 24 ............................................... 12
11.2 XR 24 II and XR 24 NOVA .............. 13
11.3 XR 24 PRO ...................................... 14
12. Check Settings ..................................... 15
12.1 XR 24, XR 24 II, XR 24 NOVA ........15
12.2 XR 24 PRO ...................................... 15
13. Setting Regeneration Pump
Piston Stroke ........................................16
14. Commissioning .................................... 16
Operation
15. Cleaning the Regeneration Unit ........ 17
15.1 XR 24, XR 24 II, XR 24 NOVA ......... 17
15.2 XR 24 PRO ...................................... 17
16. Cleaning the X-ray Developer ............17
17. Disposal of Chemicals ........................ 17
Troubleshooting
18. Troubleshooting Tips for XR 24
XR 24 II, XR 24 NOVA ............................ 18
19. Troubleshooting Tips
XR 24 PRO ............................................19
2
,,
,
,,
Page 3

IMPORTANT INFORMATION

1. Notes

1.1 CE - Labeling

This product bears the CE- Labeling in accordance with the guidelines of the Medical Products Committee 93/42/EWG and satisfies all criteria of the Appendix I to said guidelines.
Operating Instructions.
• The developer unit herein described conforms to the relevant safety standards valid at this time. All switches, processes, trade marks, software programs and appliances named in this document are registered names.
• Any reprinting of the technical documentation, in whole or in part, is subject to prior written approval of Dürr Dental.

1.2 Electromagnetic Compatibility

• This product conforms to all requirements laid down for Electromagnetic Compatibility of Medical Appliances.

1.3 General Notes

• These Installation and Operating Instructions form an integral part of the unit. They must be kept close to the unit and in readiness whenever required. Precise observance of these instructions is a pre­condition for use of the unit for the intended purpose and for its correct installation and operation. These Installation and Operating Instructions should be passed on to any future purchaser or explained to any new operator.
• Safety for the operator as well as trouble­free operation of the unit are only ensured if use is made of original equipment parts. Moreover, use may only be made of those accessories that are specified in the technical documentation or that have been expressly approved and released by Dürr Dental for the intended purpose.
Any warranty or guarantee becomes invalid in the case where parts or accessories are used which are not supplied by Dürr Dental.
• Dürr Dental only regard themselves as being responsible for the equipment with regard to safety, reliability and proper functioning if assembly, resettings, changes or modifications, extensions and repairs have been carried out by Dürr Dental or an agency authorized by Dürr Dental and if the equipment is used in conformity with the Installation and

1.4 General Safety Information

This appliance has been so designed and constructed by Dürr Dental that any danger arising from the use of this product is virtually excluded provided it is fitted according to the instructions. However, in order to avoid any possible damage or injury we are obliged to point out the following safety measures.
• When operating this appliance all local rules and regulations must be observed! Any modification whatsoever is not permitted: any guarantees covered by Dürr Dental thus become invalid. In the interests of ensuring problem-free running the owner and operator are responsible for observing all rules and regulations.
• Retain all packing material for possible return of the product to the manufacturer. Take care that it does not fall into the hands of children. Only the original packing guarantees optimal safety of the appliance during transport.
Should return of the product to the manufacturers be necessary during the guarantee period, Dürr Dental accepts no responsibility for damage occurring during transport where the original packaging was not used!
• This product is a technical appliance and may only be installed and operated or used by someone who has been trained or who has experience of how to use the appliance correctly.
• Before every use the operator must check the functional safety and the condition of the appliance.
3
Page 4
• The operator must be knowledgeable in the operation of the appliance.
• The product is not designed to be used in medical treatment areas where there exists the danger of explosion. Areas where explosions could occur are those where flammable anesthetic material, skin cleansers, oxygen and skin disinfectants are present. This appliance is not to be used in any areas where the atmosphere could cause fire.

1.5 Combining Appliances

• Units may only be connected to the system or to other units when it has been established that there is no reduction of safety for the patient, the operator or the environment through such connection.
Where it is not absolutely clear from the
documentation whether the safety is reduced by such connection, then the operator must establish, e.g. by contacting either the manufacturer or an expert, that there is no danger to the patient, the operator or the environment through such connection.

1.7 Warnings and Symbols

In the Installation and Operating Instructions use is made of the following terms or symbols to denote information of special importance:
Information, requirements and prohibitions on preventing personal injury and extensive damage to propert.
Special information concerning the economical use of the appliance and other instructions.
Observe Installation and Operating Instructions
CE-Labeling
Power on/off
/ Select program

1.6 Electrical Safety Notes

• This regeneration unit may only be used with a correctly fitted standard earthed plug and socket.
• Before connecting the appliance to the power supply check that the current required and the frequency is the same as that provided at the power outlet.
• No extension cables should be used to connect the machine to the power outlet.
• Warning! Check the appliance and the power supply cables for correct installation and possible damage before switching on. Damaged cables, plugs and sockets must be replaced before use.
• The appliance should not be used in the patient’s vicinity. A minimum distance to patient of 1.5 meters is recommended.
4
Confirm selection

2. Product information

2.1 Correct Usage

The DÜRR Regeneration Unit is designed solely for use with DÜRR DENTAL X-ray developer units of the model series XR .. .
Precise observance of the installation and operating instructions is a pre-condition for use of the unit for the intended purpose and for its correct installation, operation and maintenance.

2.2 Incorrect usage

Any other use or use beyond what is specified is deemed to be not for the intended purpose. The manufacturer accepts no liability for damage resulting therefrom. All risk is borne solely by the user.
Page 5

3. Contents

4. Technical Data

Regeneration Unit RU 24 for X-ray developers XR 24 .. .
230V - 240V, 50Hz - 60Hz ........ 1700-820-00
100V - 110V, 50Hz - 60Hz ........ 1700-830-00
Before connecting the regeneration unit to the developer please make sure to check the following: Is the regeneration unit to be connected to a developer of the model XR 24, XR 24 II, XR 24 NOVA or to an XR 24 PRO?
For connection to an XR 24 PRO:
Use the assembly set 1700-284-00 (included)
For connection to an XR 24, XR 24 II, XR 24 NOVA:
Use the conversion set PCB 1700-212-00! This must be ordered separately. See section 3.2 and installation as described in section 11.2.
The assembly set 1700-284-00 is then no longer required.

3.1 Accessories

1 Assembly set
for XR 24 Pro only ................ 1700-284-00
Regeneration Unit RU 24 for X-ray developers XR 24 .. .
Model 1700-820-00 (230V) Model 1700-830-00 (110V)
Model 1700-820-00 Voltage
(V) 230 - 240 230
Frequency Power consumption Output
Model 1700-830-00 Voltage Frequency Power consumption Output
Model 1700-820-00 1700-830-00 Measurements
L x B x H 32 x 36 x 37
Weight (empty)
(Hz) 50 60
(A)0.65 / 0.9 0.5
(W) 50 - 80 50 - 80
(V) 100 - 110 100 - 110
(Hz) 50 60
(A) 0.8 / 1.0 0.6 / 0.75
(W) 40 - 80 40 - 80
(cm)
(kg) 4

3.2 Special Accessories

The following parts are not part of the standard contents. Order separately if required!
1 PCB conversion set,
only for XR 24 II and
XR 24 NOVA ........................... 1700-212-00
5
Page 6

5. FUNCTIONAL DIAGRAM

5.1 Regeneration Unit connected to XR 24, XR 24 II, XR 24 NOVA

H
30
20
D
10
0
G C

5.2 Regeneration Unit connected to XR 24 PRO

J
REG.
40
50% OFF
50
S1
60
100% ON
A1
A2
B
A
H
I
B
6
Page 7

6. FUNCTIONAL DESCRIPTION

6.1 Regeneration Unit RU 24 connected to XR 24, XR 24 II, XR 24 NOVA

The regeneration pumps of the X-ray developer are activated every time that the appliance is initially switched on and, furthermore, are reactivated after every length of 1.3m of developed film material when the regeneration switch is correctly set (switch (C) to ON). For the duration of time that the film intake is activated (via light barrier H) on a film being fed into the appliance, an impulse generator (A) produces rotational impulses which are counted, the number of impulses being proportional to the length of the film. The potentiometer (D) allows the running time of the regeneration pumps to be set at any interval between 0 s and 60 seconds. The running time of the regeneration pump is factory set at 30 s. In this time the pumps feed c. 190 ml fresh chemicals into the developer and fixer baths of the X-ray developer from the 5l regeneration canisters. Switching off the pumps, and / or switching off the X-ray developer transmits a delete impulse to the counter which then resets at zero.
A) Impulse generator
A1) XR24: Drive shaft light barrier A2) XR24 II: Drive motor impulse generator
A2) XR24 Nova: Drive motor impulse generator B) Regeneration Unit C) PCB regeneration switch On/Off D) Potentiometer for time setting G) Reduction of regeneration time to 50% / 30s H) Film intake light barrier

6.2 Regeneration Unit RU 24 connected to XR 24 PRO

The regeneration pumps of the XR 24 PRO are reactivated after every length of 1.3m of developed film material. For the duration of time that the film intake is activated (via light barrier H) on a film being fed into the appliance, a generator produces impulses which are counted, the number of impulses being proportional to the length of the film. The software in the service program of the XR 24 PRO allows the running time of the regeneration pumps to be set at any interval between 0 s and 60 seconds, see section 11.3. The running time of the regeneration pump is factory set at 30 s. In this time the pumps feed c. 190 ml fresh chemicals into the developer and fixer baths of the X-ray developer from the 5l regeneration canisters. The switching off of the pumps after a regeneration phase automatically transmits an impulse to the counter which then resets at zero. The current counter reading is stored whenever the X-ray developer is swiotched off or in case of a power down.
A) Drive motor impulse generator B) Regeneration Unit H) Film intake light barrier I) PCB J) Display
7
Page 8

INSTALLATION

7. Set-up alternatives for Regeneration Unit

Set-up of Regeneration Unit RU 24 next
to the X-ray developer:
Where sufficient space is available, this set-up is preferred.
Set-up of Regeneration Unit RU 24 in a
cupboard:
The operator must be instructed to check the state of the chemicals regularly.
Set-up of Regeneration Unit
1
RU 24 above the level of the X-ray developer is not permissible. This set-up position makes it possible that chemicals leak into the X-ray developer baths.
Please ensure that all connecting hoses from the Regeneration Unit RU 24 to the X-ray developers are laid without any twists or bends. The distance between Regeneration Unit and X-ray developer should not exceed 2m. When setting-up the X-ray developer, ensure good access to it and to the collecting tanks.
8
Page 9

8. Preliminary measures

2
The following measures need only be taken when the Regeneration Unit is subsequently being connected to a X-ray developer.
1
• Remove mains plug (1) from socket
• Lift cover (2)
• Drain any chemicals from the X-ray developer
• Open the green catch (3) on the film intake roller set (6)
• Remove roller set (6)
2
• Open the green catch (3) and the clips (4) of the dryer roller set (5)
• Swing the dryer roller set (5) towards the rear and lift out
3
• Rinse the baths with warm water
• Close the water tap
4
• Remove the cover necessary for working
5

8.1 Remove front cover

• Unscrew the two quick-release screws (11) from the front cover panel (12)
• Unscrew the three Philip’s screws (7) and
6
remove the front cover panel (12)

8.2 Remove rear cover

• Unscrew the three Philip’s screws (7) and remove the rear cover panel (9)
3

8.3 Remove side covers

• Remove front (12) and rear panels (9), lift
7
the side panels (10) upwards to remove
8 7
9
10 11
12
4
9
Page 10

9. Hose connections

9.1 Hose connection to XR24, XR 24 II, XR 24 NOVA or to XR 24 PRO
with serial number up to T005999
The regeneration connection is
13
14
5
16E
16F
6
effected using the nozzles to the tank at 16E and 16F, see figs. 6 and 7.
• The connecting hose from the Regeneration
Unit for developer (black) (13) and fixer (red) (14) must be slipped through the prepared holes on the rear of the machine and fed to the grey connecting sleeves (16E) and (16F) on the baths.
• Uncsrew the locking nuts (18) on the
connectors (16E) and (16F).
• Remove the black plugs (20). Slide the
locking nuts (18) and the grey hose locking ring (19) onto the connecting hose (13), and (14). Slide the connecting hose for developer (black) (13) and fixer (red) (14) all the way onto the appropriate connector sleeve, (16E) and (16F), of the bath and secure in place with the locking nut (18).
E Developer bath F Fixer bath
9.2 Hose connection to XR 24 PRO
with serial number from T006000
The tank design has been optimised and the regeneration connection is effected at the inlet pipe, see fig. 7a.
Use the assembly set 1700-284-00 “inlet pipe for regeneration unit” with enclosed assembly instructions.
10
16E 16F
18
13 14
19 20
7
7a
F
E
1
2
5 6
Page 11

10. Electrical connections

10.1 XR 24, XR 24 II, XR 24 NOVA

• Place the appliance plug into the socket
(15a) to the rear of the X-ray developer and secure in place with the locking screw.
15a
8

10.2 XR 24 PRO

• Remove socket cap (15b) to the rear of the
X-ray developer.
• Use the connection port (15a) from the
assembly set provided – 1700-284-00.
15a
• Put connection port into the prepared
opening using the 4 screws.
• Connect the cable set as illustrated (Fig. 9).
• Place the Regeneration Unit plug in the
socket and secure in place with the locking screw.
8a
Circuit diagram XR 24 PRO
1700-216-50
9
15b
X1/X2 Plug X3 Regeneration Unit
11
Page 12
11. Setting the
Regeneration Electronics
Before setting, fill the X-ray devel­oper baths with water.
The pump running time should be set according to the individual require­ments of the surgery. We recommend, for example, that where a large number of films are de­veloped the regeneration time should be lowered in order to avoid unne­cessary consumption of chemicals.

11.1 XR 24

Switch „S1“ ON / OFF:
• If switch (22) is set to OFF, regeneration
will take place after 1.3m of developed film.
• If switch (22) is set to ON, then
additionally regeneration will take place every time the appliance is switched on.
Switch „S1“ 50% / 100%:
• If switch (21) is set to 100%, then the
maximum pump running time of the Regeneration Unit is 60s.
• By turning the switch (21) to 50% then the
maximum pump running time of the Regeneration Unit is halved to 30s.
12
10
11
Potentiometer „REG“ regeneration time
The amount of chemical transported to the X-ray developer depends on the pump running time of the Regeneration Unit. The potentiometer (23) can be used to set the pump time from >0s to <60s (<30s). The pump operating time is factory-set at
C20
C19
30s. In this time approx. 190ml fresh developer and fresh fixer are pumped to the baths of the X-ray developer. If further adjustment is necessary the potentiometer
R 59
R 67
V 74
C18
20
10
0
30
REG.
R60
40
Start­Reg.
R 61
C23
50% OFF
50
S1
60
100% ON
knob (23) can be used to change the pump operating time.
21
22
23
Page 13
12

11.2 XR 24 II and XR 24 NOVA

The controller for the Regeneration Unit of XR 24 II and XR 24 Nova is not integrated into the main board. For these models the
24
controller can be found on the PCB (24), Order No. 1700-212-00, which is slotted onto the main board. The slots for this printed circuit board can be found in the upper left corner of the main board, and are marked X13 and X14.
Before slottting PCB into position (24) remove power supply to the X-ray developer.
Setting for regeneration and pump operating time are carried out on the PCB (24).
Switch „X3“ Regeneration on appliance operation ON/
OFF
• If switch (27) is set to ON, regeneration on
appliance operation is additionally
25
activated and when the X-ray developer is switched on regeneration occurs.
• If switch (27) is set to OFF, regeneration
occurs only after 1.3m of film has been developed.
13
Switch „X4“ 50% / 100%
• If switch (26) is set to 60s then the
26
maximum pump running time of the
27
Regeneration Unit is 60s.
28
• If switch (26) is set to 30s then the
maximum pump running time of the Regeneration Unit is halved to 30s.
Potentiometer P1 Reg.-time
The amount of chemical transported to the X-ray developer depends on the pump running time of the Regeneration Unit. The potentiometer (28) can be used to set the pump time from >0s to <60s (<30s). The pump operating time is factory-set at 30s. In this time approx. 190ml fresh developer and fresh fixer are pumped to the X-ray developer baths. If further adjustment is necessary the potentiometer knob (28) can be used to change the pump operating time.
13
Page 14
14

11.3 XR 24 PRO

The regeneration function ON / OFF and the regeneration time can be read on the display of the X-ray developer (Fig. 14).
Please refer to the Installation and Operating Instructions of the X-ray developer XR 24 PRO (order no. 9000-600-74/30) See section 18.6 Service Routine.
••
Start Service Routine
••
Switch off appliance at main switch
(press min. 2 s)
Simultaneously press
(min. 4s) Appliance is in service set-up routine
••
Service function selection
••
Using keys and display select REGENERATE, then select REGEN.ON.
Alter setting
(Factory setting 30s)
or changes the parameter value
confirms new value
+ +
+
+ +
14
••
Finish service set-up routine
••
Switch off appliance at main switch
(press min. 2 s)
Page 15

12. Check Settings

12.1 XR 24, XR 24 II, XR 24 NOVA

Check regeneration at start of operation
• Main switch ON
• When the appliance is switched on the Regeneration Unit must be activated and developer and fixer will be pumped to the baths of the X-ray developer.
• Check the appliance for leaks.
Check regeneration impulse for film length
• Main switch ON
• Set fast forward to ON (film transport set to 3 min.). Lay a film in the film intake such that the film intake flap is activated but so that the film is not transported. After approx. 8 min. the regeneration pumps should switch on and developer and fixer should be pumped into the baths of the X-ray developer.
• Check the appliance for leaks.
Check regeneration pump performance
The developer and fixer pumps should transport the same amount of liquid into the baths of the X-ray developer.
• Fill two measuring beakers with the same amount of water (approx. 0.5 liter). Place these in the Regeneration Unit and place the two hoses from the regeneration containers into the measuring beakers. Check that the pumps feed the identical amount of water. If necessary alter the pump transport settings.
See section 13. Setting regeneration pump piston stroke.

12.2 XR 24 PRO

A processor in the electronics of the XR 24 PRO stores the complete developing time, therefore setting option selection is not required.
Check regeneration impulse for film length
• Switch on the X-ray developer and select program „Endo“ (film transport time 2:45 min.).
• Lay a film in the film intake such that the film intake flap is activated but so that the film is not transported. After approx. 7 1/2 min. the regeneration pumps should switch on and developer and fixer should be pumped into the baths of the X-ray developer.
• Check the appliance for leaks.
Check regeneration pump performance
The developer and fixer pumps should transport the same amount of liquid into the baths of the X-ray developer.
• Fill two measuring beakers with the same amount of water (approx. 0.5 liter). Place these in the Regeneration Unit and place the two hoses from the regeneration containers into the measuring beakers.
• The pumps can be activated via the Service Routine of the XR 24 PRO, in order to check the amount of liquids transported.
(Please refer to the Installation and Operating Instructions of the X-ray developer XR 24 PRO, Order No. 9000-600-74/30. Section 18.6
Service Routine)
15
Page 16
15
% OF STROKE
100 75 50
25
0

13. Setting Regeneration Pump Piston Stroke

29
The amount of chemicals actually transported by the Regeneration Unit can be adjusted by altering the setting of the piston stroke. If the amounts pumped by the developer pump and the fixer pump are not the same then this can be regulated by altering the piston stroke of each pump.
• Loosen the socket screw (30).
• Use a screwdriver or spanner to turn the
hexagonal screw (29) to change the piston stroke setting:
Turning in the direction 100% = the amount
30
pumped increases Turning in the direction 0% = the amount
pumped decreases.
The optimal pump volume is factory set (Fig. 15).
• Finally, tighten the hex. socket screw (30).

14. Commissioning

• After finishing all re-setting that may be
necessary drain all water from the baths in the regeneration unit of the X-ray developers and place the chemicals into position as appropriate for the model of X-ray developer and according to the Installation and Operating Instructions of that model.
The X-ray developer should never be operated without the roller set!
If a roller set is missing then it is possible for developer and/or fixer to be forced under pressure vertically and spray out of the X-ray developer.
Chemicals irritate eyes and skin and there is danger of severe damage to the eyes.
Without the developer and fixer roller sets transport of chemicals to the baths is no longer possible.
There is danger of chemicals getting in the eyes and of chemicals mixing together.
16
If chemicals get into eyes, wash thoroughly with water and consult doctor.
Page 17

OPERATION

15. Cleaning the Regeneration Unit

Every 3 months
• Check whether the collection container of
the X-ray developer is empty, if necessary empty into the main canisters.
It is important that these collection containers are empty, otherwise overflowing may result when the chemicals are drained from the baths.
• Drain the chemicals from the baths of the
X-ray developers and empty the Regene­ration Unit containers and rinse throroughly with warm water. Fill the appliance and the regeneration unit containers with warm water and close the top cover.
• Now refer to the operating instructions of
the appropriate model of X-ray developer for next steps: See section 15.1 or 15.2.

15.1 XR 24, XR 24 II, XR 24 NOVA

Regeneration on operation activated
• Switch the X-ray developer on and wait
until the pumps of the Regeneration Unit have begun operation. Finally switch off the X-ray developer.
Repeat this operation at least 4 times, so that the Regeneration Unit (pumps and hoses) are thoroughly rinsed through.
• Once the appliance is again in Stand-By
Phase (lifting bath in upper position) turn off at main switch.
Regeneration on operation deactivated
• Switch the X-ray developer on and select
fast forward operation.
• Lay a film in the film intake such that the film
intake flap is activated but so that the film is not transported.
• Wait approx. 30 min., until the Regeneration
Unit has operated 4 times. Remove the film from the film intake and let the cycle continue til the end (lifting bath in upper position).
• Switch off X-ray developer.

15.2 XR 24 PRO

• Switch on the X-ray developer and select program „Endo“ (film transport time 3 min.).
• Lay a film in the film intake such that the film intake flap is activated but so that the film is not transported.
• Wait approx. 30 min., until the Regeneration Unit has operated 4 times. Remove the film from the film intake and let the cycle continue til the end (lifting bath in upper position).
• Switch off X-ray developer.
16. Cleaning the X-ray
Developer
Every 3 months
Change chemicals (See Installation and Operating Instructions 9000-600-74/30)
Chemical cleaning of roller sets in cleaning bath, see enclosed notes, A3-
Poster 9000-600-14/01 or Instructions for Cleaning Roller Sets 9000-600-22 (included with XR Clean-Set).

17. Disposal of Chemicals

When disposing of developer and fixer observe all local and regional regulations! In Germany and many other countries X-ray chemicals must be disposed of as special waste.
17
Page 18

TROUBLESHOOTING

The following descriptions of troubleshooting procedures are designed for technical staff only. Repairs may only be carried out by Dürr Dental or by a person or agency authorised by Dürr Dental.
Before carrying out any repair or maintenance procedures remove power supply!

18. Troubleshooting Tips for XR 24, XR 24 II, XR 24 NOVA

Fault
1.Regeneration containers are empty after only a few hours
2.Films not fixed completely and veil on film
Possible causes
• Frequent use of the appliance main switch, surgery mains switch or constant interruption of power supply. (Only when Regeneration on Operation activated)
• Electronic relay K3 (of XR24) sticks or electronics defect.
• Regeneration containers empty.
• Pump operating time too short.
• Regeneration containers or their hoses are interchanged.
• Non-return valve of regeneration pump stuck or wrongly positioned.
• Regeneration hoses (from the Regeneration Unit to the X-ray developer) twisted.
• Film shelf-life exceeded.
• Chemicals shelf-life exceeded.
Remedy
• Switch off the machine only during the midday break and keep on Stand-By during working hours.
• Clean contacts or replace electronics. (Order No. 1700-210-52)
• Refill the regeneration containers and repeatedly restart at main appliance switch using the regeneration on operation function. If there is still no improvement replace all chemicals in the machine.
• Pump operating time needs adjusting via potentiometer.
• Drain chemicals from the machine and clean thoroughly. Connect the regeneration containers in the correct positions and refill with fresh chemicals.
• Clean non-return valve, replace if required. Check for correct positioning
• Lay the hoses with no twists or bends.
• Observe film shelf-life date.
• Observe chemicals shelf-life date. If shelf-life of chemicals is exceeded do not use and dispose of appropriately.
18
Page 19
3.Regeneration pump not working
• Light barrier on the drive shaft (XR24), tachometer generator (XR24-II) or electronics defect.
• Cable connections to Regenerati­on Unit loose or disconnected.
• Regeneration pump motor blocked.
• Regeneration time at potentiometer set at 0s.

19. Troubleshooting Tips XR 24 PRO

• The impulse of the light barrier can be checked via Service PCB XR24 (Order No. 1700-031-00); check impulse of the LED drive motor (XR24-II) or replace electronics.
• Check all cable connections.
• Check the motor for any mechanical faults (e.g. turn the fan wheel).
• Set potentiometer to ca. 30s and check amount of regeneration material pumped.
Fault
1.Regeneration containers are empty after only a few hours
2.Films not fixed completely and veil on film
Possible causes
• Regeneration time set too long.
• Electronics do not switch off.
• Regeneration containers empty.
• Pump operating time too short.
• Regeneration containers or their hoses are interchanged.
• Non-return valve of regeneration pump stuck or wrongly positioned.
• Regeneration hoses (from the Regeneration Unit to the X-ray developer) twisted.
• Film shelf-life exceeded.
• Chemicals shelf-life exceeded.
Remedy
• Check regeneration timer setting.
• Replace electronic parts.
• Refill the regeneration containers. If there is still no improvement replace all chemicals in the machine.
• Re-set pump operating time at higher value.
• Drain chemicals from the machine and clean thoroughly. Connect the regeneration containers in the correct positions and refill with fresh chemicals.
• Clean non-return valve, replace if required. Check for correct positioning
• Lay the hoses with no twists or bends.
• Observe film shelf-life date.
• Observe chemicals shelf-life date. If shelf-life of chemicals is exceeded do not use and dispose of appropriately.
3.Regeneration pump not working
• Motor tachometer generator or electronics defect.
• Cable connections to Regenerati­on Unit loose or disconnected.
• Regeneration pump motor blocked.
• Check the impulses of the light barrier and the impulses of the roller drive or replace electronics.
• Check all cable connections.
• Check the motor for any mechanical faults (e.g. turn the fan wheel).
19
Loading...