
TECHNICAL SPECIFICATION
SIDE ELEVATIONFRONT ELEVATION
Fixing
locations
(4)
Water
entry point
1115⁄16"
1
⁄2"
2
2"
"
4
⁄
1
6
3
⁄8"
1
Sink/worktop thickness
Max 21/4" Min 3/16"
1
⁄4"
11
Distance from
the aerator to the
21⁄16"
end of the tap
"
8
⁄
5
14
Fixing
locations
"
8
/
7
(4)
" / Min 24
8
/
7
Max 32
Fixing
locations
(4)
9
⁄16"
5
FLOOR
Tap dimensions
WD04 Height 61/4" Width 1115/16" Depth 111/4"
Motor bucket dimensions
WD04 Hei ght 107/16" Width 59/16" Depth 77/16"
For further information please contact Dyson.
1-888-397-6622 airbladeinfo@dyson.com
www.dyson.com
"
16
⁄
7
10
Rear cable
entry point
Fixing
locations
(4)
All dimensions shown
in inches (+/-
Minimum clearance
Z 4” clearance from floor. (ADA requires 9” toe clearance).
3
”
/
)
16
7
7
⁄16"

TECHNICAL SPECIFICATION
FRONT ELEVATION SIDE ELEVATION
21⁄2"
2"
15
⁄16"
11
"
16
⁄
3
12
3
1
⁄8"
Sink/worktop thickness
1
Max 2
Fixing
/4" Min 3/16"
locations
(4)
"
8
⁄
5
14
Fixing
locations
(4)
1
⁄4"
11
Distance from
the aerator to the
end of the tap
21⁄16"
"
8
/
7
" / Min 24
8
/
7
Max 32
Water
entry point
Fixing
locations
(4)
FLOOR
Tap dimensions
WD05 He igh t 123/
Motor bucket dimensions
WD05 Height 107/
"
W i d th 11
16
"
Width 5
16
15
/
9
/
16
"
Depth 11
16
”
Depth 7
"
16
⁄
7
10
Rear cable
entry point
Fixing
locations
(4)
All dimensions shown
9
5
⁄16"
in inches (+/-
3
"
/
)
16
7
⁄16"
7
Minimum clearance
1
"
/
4
7
"
/
16
Z 4” clearance from floor. (ADA requires 9” toe clearance).