DX Engineering DXE-8040VA-1 Instructions manual

80 and 40 Meter
DX Engineering
Thunderbolt®
Vertical Antenna
DXE-8040VA-1
US Patent No. 8,130,168
DXE-8040VA-1-INS Revision 6c
© DX Engineering 2021 1200 Southeast Ave. - Tallmadge, OH 44278 USA Phone: (800) 777-0703 ∙ Tech Support and International: (330) 572-3200 Fax: (330) 572-3279 ∙ E-mail: DXEngineering@DXEngineering.com
- 1 -
Table of Contents
Introduction & Features
2
Warning
3
Tools Required
3
Manual Updates and Information
4
Installation Sequence
4
Site Selection
4
Mounting Pipe
4
Coaxial Cable to Mounting Pipe
5
Radial System
6
Assembly Notes
6
Radial Plate to Mounting Pipe
7
Attaching Ground Radial Wires to the Radial Plate
8
Overall Pivot and Antenna Base Assembly Drawing
9
Pivot Base and Lower Antenna Assembly
10
Mounting and using the Optional DXE-VRW-1 Manual Winch
18
General Information about Aluminum Tubing
21
Assembling the Vertical Sections
22
Mating the Vertical Elements to the Pivot Base Assembly
30
80/40 Trap Assembly and Installation
31
Base Matching Network Assembly and Installation
34
Optional DXE-7580-THK Capacity Hat Assembly and Installation
35
Tuning the Vertical
38
Factory Trap Setting
40
Operation of the DXE-8040VA-1 for CW portion of the 80M band
40
Locking the Pivot Base
41
DXE-8040VA-1 Part Lists
Pivot Base Assembly
41
Optional DXE-VRW-1 Manual Winch Assembly
42
Feedpoint Hardware
42
Vertical Elements Assembly
42
80/40 Trap Assembly
43
Base Matching Network Assembly
43
Optional DXE-7580-THK Capacity Hat Assembly
43
Additional Material Needed but not Supplied
44
Suggested Parts Not Included
44
Optional Accessory Items
45
Technical Support and Warranty
47
- 2 -
Introduction
Congratulations on obtaining your DX Engineering DXE-8040VA-1 Multiband Vertical Antenna. With this antenna you will have a high-performance vertical antenna specifically for the 75/80 meter and 40 meter bands. The DX Engineering 53 to 55-foot Dual Band Vertical Antenna supplies the highest possible performance this side of our mono-band vertical antennas. Perfect for areas where there is no room for individual verticals. Achieve the strongest possible presence at your power level and be competitive. The DXE-8040VA-1 antenna covers the whole 40 meter band.
The 80/75 meter band is tunable down to 3650 kHz center frequency with 300 kHz bandwidth. This means that operation on the CW DX frequencies and DX Phone frequencies is within range of most radio internal tuners - no antenna changes are necessary to switch frequencies!
The optional patented DXE-7580-THK CW Optimizer Capacity Hat Kit for 75/80 and 80/40 Antennas is specifically designed to allow the center of resonance to be moved down to the low band edge for dedicated CW ops. The DXE-7580-THK consists of hub and 48" adjustable rods. Easy to add to or remove from upper antenna mast with two studded element clamps after lowering antenna.
The DX Engineering DXE-8040VA-1 is a slow taper 53 to 55-foot high Dual Band Vertical Antenna system. The vertical antenna is specifically designed to operate on 80 meters and 40 meters. Included with this antenna system is a patented rugged stainless steel pivot fixture for ease of assembly and adjustments. Engineered with 6063 corrosion-resistant aluminum tubing, stainless steel mounting brackets and stainless steel hardware, this antenna is very durable and attractive.
Features
High Efficiency Design
Massive high efficiency trap assembly - strongest signal possible on both bands 5 kW SSB and CW rated - unparalleled reliability Instant automatic band switching DX Engineering Adjustable Matching Network configures the lowest SWR Broad 2:1 SWR bandwidth - 400 kHz on 40m, 300 kHz on 80m Lowest possible take-off angle reduces domestic QRM signals
High Strength Pivoting Fixture - US Patent No. 8,130,168
Ultra-rugged construction starts with 3 inch OD Aircraft Grade heavy wall tubing Self supporting - will withstand steady-state winds in excess of 50 mph without guying
(guying required under extreme wind speed or ice conditions)
Extremely high strength heavy wall tubing made to DX Engineering specifications Massive Extren® channel insulator
The optional DXE-VRW-1 Manual Winch for easy one-person raising and lowering of the antenna is available from DX Engineering. You can move the DXE-VRW-1 winch between similar antennas in a multi-antenna installation.
- 3 -
This antenna system requires the installation of a heavy duty mounting pipe set in concrete. Specifically, 3" OD (max) high strength galvanized steel tubing with 0.250” minimum wall
thickness and 7’ minimum length, which is available from DX Engineering; part number DXE- VGMT-3CG. A customer supplied 2-1/2" Schedule 80 pipe that has an outside diameter of 2.875" is also suitable. Thirty six inches of the mounting pipe should extend above ground level. Depth of the mounting hole and amount of concrete is dependent on local soil type, condition and antenna guying.
WARNING!
INSTALLATION OF ANY ANTENNA NEAR POWER LINES IS DANGEROUS
Warning: Do not locate the antenna near overhead power lines or other electric light or power
circuits, or where it can come into contact with such circuits. When installing the antenna, take extreme care not to come into contact with such circuits, because they may cause serious injury or death.
Overhead Power Line Safety
Before you begin working, check carefully for overhead power lines in the area you will be working. Don't assume that wires are telephone or cable lines: check with your electric utility for advice. Although overhead power lines may appear to be insulated, often these coverings are intended only to protect metal wires from weather conditions and may not protect you from electric shock
Keep your distance! Remember the 10-foot rule: When carrying and using ladders and other long tools, keep them at least 10 feet away from all overhead lines - including any lines from the power pole to your home.
Tools Required
Two 9/16" wrenches, (one of them should be open-end) One 7/16" open end wrench Two 3/4" wrenches Medium size flat blade screwdriver or 5/16" nut driver for the element clamps Tape measure Felt-tip marker Small Phillips Head Screwdriver
- 4 -
Manual Updates and Information
Every effort is made to supply the latest manual revision with each product. Occasionally a manual will be updated between the time your DX Engineering product is shipped and when you receive it. Please check the DX Engineering web site (www.dxengineering.com) for the latest revision manual.
Please - Take the time to read the entire manual before you start assembly. There are plenty of
pictures and drawings to see, and if you read the entire manual first, you'll get a better feel for the overall construction methods described. Assembly is not difficult, but there are a number of parts that must go together in a certain sequence to make assembly easier.
Installation Sequence
1. Site Selection
2. Mounting Pipe
3. Coaxial Cable to Mounting Pipe
4. Radial System
5. Pivot Base Assembly (US Patent No. 8,130,168)
6. Mounting Pivot Base to Mounting Pipe
7. Antenna Assembly
8. Tuning
Site Selection
Select a mounting location clear from power lines, structures and other antennas by a minimum of 65 feet (55 + 10 ft. safety rule). Consider overhead power lines, utility cables and wires. The further away the vertical is mounted from local noise sources or other metallic objects, which can re-radiate noise and affect the tuning, radiation pattern and SWR, the better. Determine the direction you want the antenna to pivot and make sure there is adequate clearance (at least 65 feet).
Mounting Pipe
DX Engineering has a Chromoly Steel mounting mast available - Part Number DXE-VGMT-3CG is 3 inches OD, Chrome-Moly 4130 Steel Tubing, 100K PSI Min. Yield, 3 in. OD, 0.250 in. Wall, 7 ft. Length,
- 5 -
This mounting pipe must be permanently mounted in the ground, preferably in a concrete base 2 feet by 2 feet by 4 feet deep (with gravel below for drainage). The antenna system requires this type of mounting to help withstand the lateral forces present on the antenna during wind conditions and when operating the pivot function. Make the hole deep enough to accommodate at least 4 feet of pipe and 4 to 6 inches of gravel at the bottom for drainage. Set the mounting pipe on the gravel, use the concrete to fill around the pipe per the concrete instructions. Fill the hole until the concrete is level with the ground around it. Use a level on the mounting pipe as you fill the hole to be sure the mounting pipe is vertically straight.
Your location, landscape and ground conditions may require different mounting solutions in order to have the steel mounting pipe and the vertical antenna in a secure position.
Note: Galvanized steel, rather than aluminum, is much
more suitable for mounting in concrete. Aluminum will quickly corrode due to incompatibility with the materials used to make concrete.
Coaxial Cable to Mounting Pipe
The coaxial cable should be routed to the base of the antenna system and be buried below the radial system. PVC Conduit pipe may be used to house the coaxial cable. Bury the cable 6" to 12" below ground level.
Radial System
The use of a radial system is a key requirement for a high performance quarter wave vertical antenna system. With a vertical antenna system, the radials are the second half of the antenna. The radials contribute to the radiation efficiency of the entire vertical antenna system.
At a minimum, 32 radials, each 65 feet long, should be used with this antenna. DXE-RADW Radial Wire, a 14 gauge stranded copper with a black, relaxed PVC insulation wire is suggested for the best results.
The wire radials should placed as symmetrically as possible straight from the feedpoint around the vertical antenna and spaced evenly,
- 6 -
regardless of how many radials are used. Do not cross or bunch any radial wires as this nullifies their effectiveness. If you have limited space, put in as many straight radials as you can. The radials must be connected to the shield of your feedline. The DXE-RADP-3 Stainless Steel Radial Plate is an ideal optional item which provides an excellent system for attaching radial wires to your vertical antenna system feedpoint.
Radial wires can be laid on the roots of the grass using DXE-STPL Radial Wire Anchor Pins to hold them down. Using enough staples will ensure the wires will not be snagged by mowers, people, or animals. Grass will quickly overgrow the radials and it will be virtually impossible to see them. An article describing this process is available on the DX Engineering website in the Tech Info section. Radials can also be buried just under the surface by using a power edger to make a slit in the soil.
Assembly Notes
Note: JTL-12555 Jet-Lube™ SS-30 Anti-Oxidant should be used between all antenna element sections. Jet-Lube™ SS-30 is an electrical joint compound to affect a substantial electrical connection between metal parts such as telescoping aluminum tubing or other antenna pieces. It ensures high conductivity at all voltage levels by displacing moisture and preventing corrosion or oxidation.
Jet-Lube™ SS-30 must be used on all element clamps and stainless steel threaded hardware to provide good electrical contact, prevent galling, allowing easier disassembly and to ensure proper tightening.
- 7 -
Note: The following assembly instructions are based on using an optional DXE-
VGMT-3GC Mounting Pipe, with the optional DXE-VR-1 Manual Winch, optional DXE-RADP-3 Radial Plate with one optional DXE-SSVC-3P V Clamp, one optional DXE-UHF-FDFB-KIT - SecureMount™ dual SO-239 Bulkhead Connector and the optional DXE-7580-THK Capacity Hat Assembly.
Radial Plate to Mounting Pipe
Place the optional DXE-RADP-3 Radial Plate over the 2.895" OD (3” maximum OD) mounting pipe. Connections to the antenna will be made via the optional DXE-363-SST bulkhead fitting SO­239 socket connector. The DXE-RADP-3 Radial Plate comes with 20 sets of stainless steel hardware for mounting the radial wires. It is suggested that 32 radial each 65 feet long be used, therefore additional DXE-RADP-1HWK Radial Plate Wire Attachment Hardware Kits will be required.
Optional DXE-RADP-3 Radial Plate Mounted to a 3" OD Mounting Pipe
- 8 -
Attaching Ground Radial Wires to the Radial Plate
Using the 20 sets of supplied 1/4" stainless steel hardware (Bolt, Star Washer, Flat Washer, Split Washer, Nut) connect the optional ground radial wires to the DXE-RADP-3 Radial Plate as shown below. Additional hardware kits are available (DXE-RADP-1HWK) that contain 20 sets of Radial Plate Hardware.
There are optional DX Engineering Radial Wire Kits available. DXE-RADW-500K/BD contains a 500 foot spool of 14 gauge copper stranded wire with black PVC insulation, 20 Terminal Lugs and 100 Steel or Biodegradable Lawn Staples. The DXE-RADW-1000K/BD Radial Wire Kit contains a 1,000 foot spool of 14 gauge copper stranded wire with black PVC insulation, 40 Terminal Lugs and 200 Steel or Biodegradable Lawn Staples. RADW-20RT, -32RT or -65RT contain 20 each radial wires with 1/4" terminal attached. These kits come in 20 Ft, 32 Ft or 65 Ft lengths.
Depending on the number of radial wires used, space them out evenly around the Radial Plate. The Radial Plate will accommodate up to 60 radial wires (60 laser drilled holes), or up to 120 radials if doubled up.
Radial Wire Pattern
Radial Wire Hardware Installation
- 9 -
Overall Pivot Base
(US Patent No. 8,130,168)
Assembly Drawing
The exploded view drawing is for reference and shows the overall Pivot Base Assembly.
- 10 -
Pivot Base and Lower Antenna Assembly
1. Locate the heavy duty Extren® insulated channel. There are 12 holes drilled in the insulated channel. The top of the insulated channel is identified by two holes located very near the top end.
2. Locate the stainless steel bottom hinge plate, backing plate, four carriage bolts, four 3/8" flat washers, four 3/8" split lock washers and four 3/8" hex nuts. Assemble the bottom hinge to the bottom of the heavy duty insulated channel as shown below.
3. Locate the stainless steel pivot base locking plate, backing plate, four carriage bolts, four 3/8" flat washers, four 3/8" split lock washers and four 3/8" hex nuts. Assemble the pivot base locking plate to the top of the heavy duty insulated channel as shown below.
- 11 -
4. Locate the stainless steel base side bottom hinge, two 1/2-13 x 1-1/4" long stainless steel hex head bolts, two pivot bushings, four 1/2 x 1-1/4" stainless steel flat washers, two 1/2" stainless steel split lock washers, and two 1/2-13 stainless steel hex nuts. Assemble the base side hinge plate to the bottom hinge plate as shown below.
5. Locate two V-Saddle blocks, two stainless steel V-Bolts, four stainless steel 3/8" flat washers, four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts. Loosely assemble (one or two threads beyond the end of the hex nuts) the two V-Bolts to the stainless steel base side bottom hinge as shown below. The V-Bolts will be tightened in a later assembly step.
- 12 -
6. Locate the stainless steel Pivot Base Winch Mount, two stainless steel Pivot Base Plate Brackets, four 3/8-16 x 1-1/4" long stainless steel hex bolts, eight stainless steel 3/8" flat washers, four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex nuts. Assemble the Pivot Base Plate Brackets to the Pivot Base Winch Mount as shown below.
7. Locate four 3/8-16 x 1-1/4" long stainless steel hex bolts, eight stainless steel 3/8" flat washers, four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex nuts. Mount the Pivot Base Winch Mount assembly to the stainless steel Pivot Base Locking Plate.
Note: These four bolts are removed when using the pivoting function as described later on in
this manual.
- 13 -
8. Locate two V-Saddle blocks, two stainless steel V-Bolts, four stainless steel 3/8" flat washers, four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts. Loosely assemble (one or two threads beyond the end of the hex nuts) the two V-Bolts to the stainless steel Pivot Base Winch Mount as shown below. The V-Bolts will be tightened in a later assembly step.
9. Locate two thick stainless steel Backing Plates, two thin stainless steel Backing Plates, two
U-Bolt Saddle blocks, two stainless steel U-Bolts, four stainless steel 3/8" flat washers, four
stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts.
The two Thick Backing Plates (3/8”) are located next to the U-Bolt Saddles on the inside of the
insulated channel. The two Thin Backing Plates (1/4”) are used on the rear side of the insulated channel.
Top of Insulated Channel Rear and Front views showing the U-Bolt located Showing U-Bolt installed at the Bottom of the Insulated Channel The Thick Spacer is on the front side The Thick Spacer is on the front side, the The Thin Spacer is on the rear side Thin Spacer is on the rear side
Loosely assemble (one or two threads beyond the end of the hex nuts) the two U-Bolts and
associated hardware to the insulated mounting channel as shown above. The U-Bolts will be tightened in a later assembly step.
- 14 -
10. Move the four V-Bolts out as far as they will go (these were put on loosely in steps 2 and 8).
Slide the entire assembly onto your mounting pipe. You want a 1 inch clearance from the top of
your mounting pipe to the bottom side of the winch mounting plate.
Position the base fixture in the position you pre-selected for the pivoting direction. Ensure the
assembly is perfectly vertical, not twisted from top to bottom at an angle.
Tighten the V-Bolt clamp hardware evenly so the length of the exposed threads is
approximately equal. Any clamp should be tightened evenly from side-to-side with an equal amount of thread above each nut.
- 15 -
11. Locate the 3" OD x 72", 0.120" wall thickness antenna bottom element
section. There are 5 holes drilled in this element section.
One drilled hole at the bottom is for the feedpoint hardware.
Four drilled holes at the top are used for mating to the next antenna element section.
Loosen the previously installed U-Bolts (Step 9). Insert the 72" Antenna Bottom Element Section into the antenna base section through the upper and lower U-Bolts.
Position the single feedpoint hole at the bottom facing outward as shown in the picture to the right.
The bottom of the 3" OD element tube should be even with the bottom of the insulated channel as shown below.
Side View Front View
Tighten the lower and upper U-Bolt clamps hardware evenly so the length of the exposed
threads is approximately equal. Any clamp should be tightened evenly from side-to-side with an equal amount of thread above each nut.
- 16 -
12. Locate the stainless steel Antenna Hook Mounting Plate, two U-Bolt Saddle blocks, two stainless steel U-Bolts, four stainless steel 3/8" flat washers, four stainless steel 3/8" split lock washers and four stainless steel 3/8-16 hex head nuts.
Loosely assemble (one or two threads beyond the end of the hex nuts) the two U-Bolts and
associated hardware to the antenna hook mounting plate as shown below. The U-Bolts will be tightened in the next assembly step.
13. Loosen the U-Bolts enough to slide the Antenna Hook Mount assembly over the 3" OD antenna lower element on the base assembly. Position the antenna hook mount approximately 1/2" above the insulated channel as shown below.
- 17 -
14. Tighten the two U-Bolt clamps hardware evenly so the length of the exposed threads is approximately equal. Any clamp should be tightened evenly from side-to-side with an equal amount of thread above each nut.
15. Locate the 1/4-20 x 1" long stainless steel hex bolt, three 1/4" stainless steel external tooth lock washers, two 1/4" stainless steel flat washers and two stainless steel 1/4-20 hex nuts. Install the feedpoint hardware at the bottom of the 3" OD bottom element in the pre-drilled hole as shown below.
Views showing the Feedpoint hardware installed
- 18 -
Mounting and using the Optional DXE-VRW-1 Manual Winch
1. Follow the instructions included with the optional DXE-VRW-1 - Manual Winch Add-On Kit to prepare the Manual Winch for installation on the antenna base assembly.
2. Included with optional DXE-VRW-1 - Manual Winch Add-On Kit is the stainless steel hardware for mounting the winch on the pivot base assembly. The hardware includes three 3/8­16 x 1" long stainless steel hex bolts, six stainless steel 3/8-16 flat washers and three 3/8-16 Stainless Steel Nyloc Nuts.
Loosely install the three sets of stainless steel hardware on the manual winch as shown below.
The hardware does not have to be removed from the manual winch to either install or remove
the manual winch from the winch mounting plate.
- 19 -
There are three holes with slots in the mounting bracket. The flat washers will fit through the
large holes. Once in place, push the winch inward (toward the antenna elements) allowing the three bolts to go into the three slots. Tighten the hardware to hold the winch in place.
Connect the Hook from the manual winch strap to the Antenna Hook Mount as shown below.
To remove the winch, simply reverse this sequence.
- 20 -
3. To lower the antenna, ensure the winch hook is in the Antenna Hook Mount. Remove the four bolts and hardware that hold the Pivot Lock Plate to the Pivot Base Winch Mount Plate. You can now use the winch to pivot the antenna downward.
Four Bolts to be removed to allow for pivoting
4. Turn the crank on the manual winch to lower, or raise the antenna. After raising the antenna completely, make sure you replace the four bolts that were removed in step 3. The manual winch should be removed and stored when not in use to protect the gears and web strap from weather and environmental effects.
Note: Sawhorses, chairs, or ladders should be used to support the vertical sections during
assembly with the pivot base and whenever the vertical is tilted down to allow easy maintenance, or when making adjustments.
- 21 -
General Information about Aluminum Tubing
Note: JTL-12555 Jet-Lube™ SS-30 Anti-Oxidant should be used between all antenna element
sections. Jet-Lube™ SS-30 is an electrical joint compound to affect a substantial electrical connection between metal parts such as telescoping aluminum tubing or other antenna pieces. It ensures high conductivity at all voltage levels by displacing moisture and preventing corrosion or oxidation. Jet-Lube™ SS-30 must be used on all element clamps and stainless steel threaded hardware to provide good electrical contact, prevent galling, allowing easier disassembly and to ensure proper tightening.
When assembling any telescoping aluminum tubing sections you should take the following steps:
1. Make sure the edges are smooth and not sharp. Deburring may be necessary, since burrs and shavings can occur on seams as well as edges. All surfaces need to be completely smooth to allow easy assembly of tubing sections.
Caution
Aluminum tubing edges can be very sharp.
Take precautions to ensure you do not get accidentally cut.
The raised particles and shavings that appear when the aluminum tubing is machined are referred to as burrs, and the process by which they are removed is known as deburring.
Deburring is a finishing method used in manufacturing. DX Engineering aluminum tubing is
machine cut on both ends and machine slit on one end and you should further assure that there are no ragged edges or protrusions.
Use the DXE-22166 Slim Grip Deburring Tool, or the DXE-22600 Deburring Tool with
Extending Handle and Extra Blades for this operation.
2. Clean the inside of the aluminum tubing to clear out any dirt or foreign material that would cause the aluminum tubing sections to bind during assembly. Do not use any type of oil or general lubricant between the aluminum tubing sections. Oils or general lubricants can cause poor electrical connections for radio frequencies.
3. Clean the outside of the aluminum tubing to clear any dirt or foreign material that would cause the clamps to malfunction during assembly.
4. The use of JTL-12555 Jet-Lube™ SS-30 is highly recommended. Jet-Lube™ SS-30 is an electrical joint compound which effects a substantial electrical connection between metal parts such as telescoping aluminum tubing or other antenna pieces. Using Jet-Lube™ SS-30 assures high conductivity at all voltage levels by displacing moisture and preventing corrosion or oxidation.
5. When assembling the aluminum tubing sections, ensure the area is clear of grass, dirt or other foreign material that could cause problems during assembly of the closely fitted telescoping sections.
- 22 -
Assembling the Vertical Sections
Note: JTL-12555 Jet-Lube™ SS-30 Anti-Oxidant should be used between all antenna element
sections. Jet-Lube™ SS-30 is an electrical joint compound to affect a substantial electrical connection between metal parts such as telescoping aluminum tubing or other antenna pieces. It ensures high conductivity at all voltage levels by displacing moisture and preventing corrosion or oxidation. Jet-Lube™ SS-30 must be used on all element clamps and stainless steel threaded hardware to provide good electrical contact, prevent galling, allowing easier disassembly and to ensure proper tightening.
The vertical sections of the DXE-8040-VA-1 consists of ten sections of custom engineered 6063 corrosion-resistant aluminum tubing ranging in size from 3" OD to 1" OD. The 3" OD section has already been mounted in the Pivot Base Assembly.
A special custom insulator is installed which electrically isolates the 80 meter and 40 meter sections of the antenna. Around this insulator, the heavy duty pre-tuned 80/40 trap assembly is installed.
Topping off the installation of the vertical sections will be the optional patented DXE-7580-THK CW Optimizer Capacity Hat Kit for 75/80 and 80/40 Antennas which is specifically designed to allow the center of resonance to be moved down to the low band edge for dedicated CW ops. The DXE-7580-THK consists of hub and 48" adjustable rods. Easy to add to or remove from upper antenna mast with two studded element clamps after lowering antenna.
It is suggested that the vertical elements be laid out in a line according to size on a flat surface for ease of assembly. Once all the parts are assembled, the vertical sections should be supported with either saw horses, chairs or other suitable structures for assembly of the 80/40 trap and capacity hat.
When all the vertical element sections are assembled, they will be mated to the Pivot Base Assembly.
1. Locate the parts needed for the vertical element assembly:
Vertical Elements Assembly Parts List
QTY
Description
QTY
Description
1
2.75" OD x 48" long, 0.120" wall, 8 drilled holes
3
DXE-ECL-1250 Stainless Steel Element Clamp
1
2.5" OD x 72" long, 0.120" wall, 8 drilled holes
3
DXE-ECL-1500 Stainless Steel Element Clamp
1
2.25" OD x 72" long, 0.120" wall, 8 drilled holes
2
DXE-ECL-1750 Stainless Steel Element Clamp
1
2" OD x 72" long, 0.120" wall, 4 drilled holes, slits on one end
2
DXE-ECL-2000 Stainless Steel Element Clamp
1
1.75" OD x 72" long, .120" wall, slits on one end
2
1/4" x 2-3/4" long Stainless Steel Hex Head Bolt
1
1.5" OD x 72" long, 0.120" wall, slits on both ends
2
1/4" x 3" long Stainless Steel Hex Head Bolt
1
1.25" OD x 72" long, 0.058" wall, slits on one end
2
1/4" x 3-1/4" long Stainless Steel Hex Head Bolt
1
1.125" OD x 72" long, 0.058" wall, slits on one end
2
1/4" x 3-1/2" long Stainless Steel Hex Head Bolt
1
1" OD x 72" long, 0.058" wall, slits on one end
16
1/4" Stainless Steel Flat Washer
1
Black Vinyl Cap for 1" OD Tube
8
1/4" Stainless Steel Nyloc Hex Nut
1
80/40 Heavy Duty Insulator, 1.25"/1.5" DIA x 9" long
- 23 -
DXE-8040VA-1 Element Sections
Note: The 3" OD x 72" long, 0.120" wall thickness base antenna section has already been installed
on the Pivot Base Assembly.
- 24 -
2. Locate the following hardware:
QTY
Description
2
1/4" x 2-3/4" long Stainless Steel Hex Head Bolt
2
1/4" x 3" long Stainless Steel Hex Head Bolt
2
1/4" x 3-1/4" long Stainless Steel Hex Head Bolt
12
1/4" Stainless Steel Flat Washer
6
1/4" Stainless Steel Nyloc Hex Nut
3. The diagram to the right is an
overall layout of all the vertical elements with hardware and placement of the optional capacity hat bracket are shown for reference.
The 3" OD element which is already mounted on the base pivot assembly is shown for reference.
- 25 -
4. Assemble the 2.5" OD element to the 2.75" OD element using the two stainless steel 3-1/4" long 1/4" bolts, four stainless steel flat washers and two 1/4" stainless steel Nyloc nuts as shown below. When tightening the bolt and Nyloc nut, tighten them enough to hold, but not tight enough to deform the aluminum elements.
The following drilled sections are drilled to match the next size, so make sure you have the correct ends matched up (holes aligned).
5. Repeat the above step to mate the 2.25" OD element to the 2.5" OD element using the 3" long 1/4" bolts.
6. Repeat the above step to mate the 2" OD element to the 2.25" OD element using the 2-3/4" long 1/4" bolts.
- 26 -
7. Using a tape measure and felt tip pen, four of the 72" long slit tubing elements need to be marked as follows:
The 1.75" OD element is marked 16" from the end without the slit.
The 1.25" OD element is marked 4" from the end without the slit.
The 1.125" OD element is marked 4" from the end without the slit.
The 1" OD element is marked 20" from the end without the slit.
8. Element Clamps are installed approximately 1/4" to 1/2" below the end of the slit tube with the worm tightening drive located between two of the four slits as shown below.
- 27 -
9. The five slit elements are installed using Stainless Steel Element Clamps. The drawing below shows the exposed lengths for reference.
The reference drawing below shows the hardware used for joining the slit elements.
10. Locate two DXE-ECL-2000 Stainless Steel Element Clamps, one DXE-ECL-1750 Stainless Steel Element Clamp and the 1.75" OD x 72" element that was marked in step 7. Slide the two DXE-ECL-2000 element clamps over the 2" OD element. Slide the one DXE-ECL-1750 element clamp over the 1.75" OD element. Slide the 1.75" OD element inside the 2" OD element to the mark made at 16". Tighten the two DXE-ECL-2000 clamps in place. Do not over-tighten which may cause clamp damage. This tubing joint uses a second clamp to ensure proper element position. Slide the DXE-ECL-1750 next to the joint between the 2" OD element and 1.75" OD element. Tighten the clamp in place. This third clamp ensures that the 1.75" section cannot slip further inside the 2" OD section.
- 28 -
11. Locate the Insulator, one DXE-ECL-1750 Stainless Steel Element Clamp, one DXE-ECL-1500 Stainless Steel Element Clamp and the 1.5" OD x 72" long element that has slits at both ends.
Slide the DXE-ECL-1750 over the 1.75" OD element. Slide the DXE-ECL-1500 over the 1.5"
OD element. The larger diameter end of the insulator fits inside the 1.75" OD element. The smaller diameter side fits inside the 1.5" OD element. Position the element clamps over the slits and tighten as shown below.
12. Locate two DXE-ECL-1500 Stainless Steel Element Clamps, one DXE-ECL-1250 Stainless Steel Element Clamp and the 1.25" OD x 72" element that was marked in step 7. Slide the two DXE-ECL-1500 element clamps over the 1.5" OD element. Slide the one DXE-ECL-1250 element clamp over the 1.25" OD element. Slide the 1.25" OD element inside the 1.5" OD element to the mark made at 4". Tighten the two DXE-ECL-1500 clamps in place. Do not over­tighten which may cause clamp damage. This tubing joint uses a second clamp to ensure proper element position. Slide the DXE-ECL-1250 next to the joint between the 1.5" OD element and
1.25" OD element. Tighten the clamp in place. This third clamp ensures that the 1.25" section cannot slip further inside the 1.5" OD section.
13. Locate the DXE-ECL-1250 Stainless Steel Element Clamp and the 1.125" OD x 72" element that was marked in step 7. Slide the DXE-ECL-1250 element clamp over the 1.125" OD element. Slide the 1.125" OD element inside the 1.25" OD element to the mark made at 4". Tighten the DXE-ECL-1250 clamp in place.
- 29 -
14. Locate the DXE-ECL-1250 Stainless Steel Element Clamp, the 1" OD x 72" element that was marked in step 7 and the Black Vinyl Cap. Slide the DXE-ECL-1250 element clamp over the
1.125" OD element. Slide the 1" OD element inside the 1.125" OD element to the mark made at 20". Tighten the DXE-ECL-1250 clamp in place. Install the black vinyl cap on the top end of the 1" OD element.
Once mounted to the 3" OD base element section, the overall length prior to final tuning will be
637" or 53 feet, 1 inch.
- 30 -
Mating the Vertical Element to the Pivot Base Assembly
1. To lower the antenna, ensure the winch hook is in the Antenna Hook Mount. Remove the four bolts and hardware that hold the Pivot Lock Plate to the Pivot Base Winch Mount Plate. You can now use the winch to pivot the antenna downward.
Four Bolts to be removed to allow for pivoting
2. Locate the 3-1/4" long 1/4" bolts, four stainless steel flat washers and two 1/4" stainless steel Nyloc nuts. Align the 3" OD base section element with the assembled vertical elements. Slide the 2.75" element section into the 3" OD base element section aligning the 4 holes.
- 31 -
3. Assemble the 2.75" OD element to the 3" OD element using the two stainless steel 3-1/4" long 1/4" bolts, four stainless steel flat washers and two 1/4" stainless steel Nyloc nuts as shown below. When tightening the bolt and Nyloc nut, tighten them enough to hold, but not tight enough to deform the aluminum elements.
DANGER: When raising or lowering the vertical antenna make sure you have not
inadvertently located the antenna underneath power lines.
Residential power lines are often less than 40' high.
Contact With Any Power or Utility Lines Can Be Lethal !
80/40 Trap Assembly and Installation
The 80/40 Special 5 kW Trap Assembly is pre-built and tuned to the proper frequency. Do not alter the telescoping tubing lengths, they are factory set. The assembly is mounted to the vertical
antenna straddling where the insulator was installed. Mounting is accomplished using four studded
element clamps and one straight bracket with stainless steel hardware.
80/40 Trap Assembly
QTY
Description
1
Custom Pre-Assembled and Tuned 80/40 Trap Assembly
1
80/40 Antenna Straight Bracket
1
DXE-ECLS-225 2.25" Studded Element Clamp
1
DXE-ECLS-175 1.75" Studded Element Clamp
2
DXE-ECLS-150 1.5" Studded Element Clamp
4
#10-24 Stainless Steel Hex Nuts
4
#10 Stainless Steel Flat Washer
4
#10 Stainless Steel Split Washer
4
#10 Stainless Steel External Tooth Star Washer
- 32 -
1. Install the 2.25" studded clamp on the Antenna Straight Bracket using a #10 stainless steel flat washer, #10 stainless steel split washer, #10 stainless steel external tooth lock washer and a stainless steel 10-24 hex nut as shown.
2. Install the antenna straight bracket with clamp on the trap approximately 17" from the end of the larger tube as shown below. Just snug the element clamp in place. It will be tightened in a later step.
Two views showing the opened studded element clamps
and straight bracket installed on the 80/40 trap assembly
- 33 -
3. Using the stainless steel hardware, install one 1.5" studded clamp on the straight bracket as shown above. Install one 1.5" and one 1.75" studded clamp on the trap brackets as shown above.
Unscrew (or open) the three element clamps (two 1.5" and one 1.75" clamps) to allow easy
installation of the 80/40 trap assembly on the antenna in the next step.
4. Install the 80/40 trap assembly to the vertical antenna by placing the two trap assembly clamps straddling across the insulator and the third clamp further up the antenna element as shown below.
When installed, the 1.75" clamp is located approximately 2" below the insulator on the antenna
and the 1.5" clamp is located approximately 2" above the insulator on the antenna.
5. Once in place and aligned parallel to the antenna elements, tighten all the element clamps securely.
Various views showing the 80/40 trap installed on the antenna
- 34 -
Base Matching Network Assembly and Installation
Base Matching Network Assembly
QTY
Description
1
Custom made base loading coil assembly with wire & Coil Tap Clip
1
1/4" Flat Washer
1
1/4" Split Lock Washer
1
1/4-20 Nut
In areas where there is a high atmospheric static condition (areas prone to precipitation or snow static) this antenna (as with all antennas) will build up a static charge. When working on the antenna, especially in the raised position, you may want to ground the antenna to bleed off any static before touching the antenna. (Obviously, you also do not want RF present on the antenna when touching it). The Base Matching Network (described below) will also act as a constant static bleed for your resonant vertical antenna in areas where precipitation static or snow static is present.
1. Use a small Phillips head screwdriver to loosen the tap clip screw and position the tap clip on the 6th or 7th turn on the coil as shown (this will be re-adjusted during tuning). Attach the Base Matching Network Assembly to the optional DXE-RADP-3 Radial Plate using the 1/4" flat washer, 1/4" split lock washer and 1/4-20 hex nut as shown below. Verify the wires and coax will not be in the way when pivoting the antenna.
- 35 -
2. Install the optional DXE-UHF-FDFB-KIT SecureMount™ dual SO-239 Bulkhead Mount Connector to the radial plate and the Connect the PL-259. The other wire with the ring terminal from the included coil is connected to the feedline connection point on the antenna base section.
Using the
SecureMount™
Bulkhead
Connector
Optional Capacity Hat Assembly and Installation
This patented add-on kit for the DXE-8040VA-1 high performance DX Engineering THUNDERBOLT® vertical antenna allows the center of resonance to be moved down to the low band edge for dedicated CW operations. If you do not install it, skip this section and proceed to the Tuning section of this manual.
- 36 -
The drawing to the right shows the optional Capacity Hat parts for reference. Also included in this kit is one 5/64" Allen wrench and one spare 1/8" and one spare 1/4" long stainless steel Allen screws.
1. Locate the two 1-1/4" studded element clamps, the Top Hat "L" Bracket, two #10 stainless steel star washers, two #10 stainless steel split washers, two #10 stainless steel washers and two #10 stainless steel hex nuts. Assemble the studded element clamps to the "L" bracket as shown below.
2. Locate the 1/2" Mast Tube Connector Fitting, one 3/" stainless steel flat washer, one 3/8" stainless steel split lock washer, and one 3/8-24 stainless steel hex nut. Assemble the mast tube connector fitting to the "L" bracket as shown below.
- 37 -
3. Install the "L" bracket to the vertical antenna on the 1.125" OD element, just above the 1.25" OD element as shown below. Tighten the studded element clamps to hold the assembly in place.
4. Locate the patented Smooth Hub and two #8-32 x 1/4" long Stainless Steel Screw - Cup Point Allen screws. Using the supplied 5/64" Allen Wrench screw the 1/4" long Allen screws in the smooth hub in the two places as shown below. Only put these Allen Screws in half way, they will be tightened in a later step. These are the two Allen Screws that hold the smooth hub to the 1/2" mast tube connector fitting.
5. Locate the six smaller Allen screws (1/8" long) and install them loosely in the smooth hub as shown below. These are the Allen Screws that will hold the Hot Rodz® in place after you adjust their lengths. Insert the Hot Rodz® in the smooth hub as shown below. Slide them in the smooth hub and adjust their length to be 3 feet. Tighten the appropriate Allen screw to hold them in place. Refer to the pictures below for reference.
- 38 -
6. Install the Smooth Hub with the Hot Rodz® on the 1/2" Mast Tube Connector Fitting. Rotate the smooth hub to position the Hot Rodz® so they are not touching the vertical antenna element. Lock the smooth hub in place by tightening the two long Allen screws that were installed in Step 4.
7. Locate and install the six plastic end caps on the ends of the Hot Rodz®.
Tuning the Vertical
Tuning the DXE-8040VA-1 80/40 Meter Vertical Antenna is straightforward and intuitive. If you use a quality antenna analyzer at the base of the antenna you will get the most accurate readings in a timely fashion.
- 39 -
Since the 2:1 SWR bandwidth of the antenna is approximately 400 kHz on 40 meters the adjustment parameters are relatively broad and fine adjustment is not usually necessary. It is best to start the adjustment process without the Matching network connected. See picture on right showing the Matching network removed and insulated from the ground radial system.
As a result, initial 40 meter SWR measurements at the feedpoint of the antenna may indicate slightly elevated minimum SWR. This will be reduced substantially when the Base Matching Network is connected.
Note: During the following adjustments Do Not Make any Adjustment to the Trap.
Note: For the purposes of these instructions the term “resonance” or “resonant frequency” is
defined as the point of lowest SWR and may be used interchangeably.
To adjust the low SWR point in the 40 meter band, merely adjust the length of the tubing section just below the trap assembly in the normal manner, i.e., making it longer lowers the 40M resonant Frequency and shortening it raises the frequency. The section is made moveable by loosening three element clamps, one on the 1.75" inch tubing section and two on the 2" slit tubing, and then sliding the upper 1.75" section of the antenna either closer to the base of the antenna or farther away depending on whether you want to lower or raise the frequency of resonance. Be sure to tighten the clamps after making an antenna length adjustment.
As assembled per instructions, the minimum SWR point for the 75 meter band should be near 3800 kHz. The length of the topmost tubing section is adjusted to change the 80M resonant frequency as indicated by the point of lowest SWR. Similar to the way in which the 40M adjustments were made, loosen the 1.125" section clamp and lengthen the top 1" section to move the frequency of the
minimum 80M SWR lower. Likewise, make the 1” section shorter to make the resonant frequency
higher. Be sure to tighten the clamps after making an antenna length adjustment.
Connecting the Base Matching Network will reduce the minimum SWR on 80 and 40 meters. There will be some effect on the frequency of lowest SWR for each of the bands. Compensate for the effect that the network has on the frequency of minimum SWR by making minor readjustments of the physical positions of the antenna element sections as described above.
Reconnect the Matching Network to the Radial Plate. Connect the Tap Clip in the Base Matching Network at the 6th or 7th turn from the top as shown and proceed as follows:
- 40 -
1. Adjust the tap clip by moving the tap clip to a different coil turn on the Base Matching Network Coil for minimum SWR on 80M. Disregard any frequency shift of the points of lowest SWR on this band at this time.
2. Adjust the tap clip by moving the tap clip to a different coil turn on the Base Matching Network Coil for minimum SWR on 40M. Disregard any frequency shift of the points of lowest SWR on this band at this time.
3. Recheck the lowest SWR on the 80M band. If the SWR of the 80M Band is higher move the tap clip on the Base Matching Network Coil to a position that gives the best SWR on each band. Securely tighten the tap clip when done.
Once final tuning is complete and you have verified correct operation on-the-air, the coil tap can be soldered in place to eliminate any future intermittent connection due to environmental corrosion to the coil tap.
Factory Trap Setting
The trap assembly is pre-tuned at the factory using measuring and test equipment. You should not have to adjust the trap. However, if you find that the trap has been moved, maybe when you took it apart to install the antenna at a new location, or you accidently loosened the wrong clamp and the
position slipped, you can physically set the trap to 6.875” as shown below. Keep in mind that this is
not a firm absolute measurement and further testing and adjustment may be needed to find the ideal length again may be required.
Operation of the DXE-8040VA-1 for CW portion of the 80M band
To optimize the DXE-8040VA-1 for operation near the bottom of the 80M band, add the optional patented capacity Top Hat Kit model DXE-7580-THK.
Assemble the Top Hat and install it at the position shown in the diagram below.
Adjust the physical position of the Top Hat on the 1.125" element tube section to achieve resonance on your target frequency.
- 41 -
Sliding the Top Hat higher will shift the point of resonance to a lower frequency.
The position of the Top Hat Kit rods within the hub will also affect tuning. Shortening the rods or removing some of them will shift the resonant frequency higher.
Locking the Pivot Base
To help prevent accidental pivoting, ensure the four pivot locking bolts are in place and properly secured. Additionally, you may replace one of the bolts with a padlock to further prevent tampering or accidental pivoting as shown below.
Ensure all four Pivot Locking Bolts are in place
Padlock used in place of one Pivot Locking Bolt
Trap Maintenance
The trap assembly has holes internal and external to allow moisture to weep out of the assembly. Routine maintenance would be to ensure these holes are not plugged up. On the Bottom of the trap assembly and the red coil assembly are black covers. Ensure the hole that is in the cap is not plugged. On the main trap assembly there are two holes that are on the bottom - ensure these holes
are kept open to allow drainage of any moisture
- 42 -
DXE-8040VA-1 Parts List
Pivot Base Assembly - US Patent No. 8,130,168
QTY
Description
1
Base Side Bottom Hinge
1
Antenna Side Bottom Hinge
2
Bottom Hinge Bushing
1
Heavy Duty Antenna Insulator Channel
2
Saddle Backing Plate 1/4”
1
Antenna Pivot Hook Mount
1
Pivot Base Winch Mount
2
Pivot Base Plate Bracket
1
Pivot Base Lock Plate
2
Backing Plate, Square
2
Saddle Spacer Plate 3/8”
4
3" Stainless U-Bolt
4
3" Cast Saddle Clamp
40
3/8" Flat Washer
32
3/8" Split Lock Washer
32
3/8-16 Nut
8
3/8-16 x 1.25" Long, Hex Head Cap Screw
4
2"-3" Cast V-Saddle
4
2"-3" 3/8"-16 V-Bolt
8
3/8-16 x 1-1/2" Long Stainless Steel Carriage Bolt
2
1/2-13 x 1-1/4" Long Stainless Steel Hex Head Cap Screw
4
1/2" x 1-1/4" Stainless Steel Washer
2
1/2" Stainless Steel Lock Washer
2
1/2-13 Stainless Steel Nut
Optional DXE-VRW-1 Manual Winch Assembly
QTY
Description
1
1500 Pound Exposed Gear Hand Winch with Brake
1
Custom Polyester web strap with Hook, 2" x 15 Ft
1
3/8-16 x 3-1/2" long Grade 8 Hex Head Bolt
4
3/8-16 Stainless Steel Nyloc Nut
3
3/8-16 x 1" long Stainless Steel Hex Bolt
8
3/8-16 Stainless Steel Flat Washer
Feedpoint Hardware
QTY
Description
3
1/4" External Star Washer
1
1/4-20 x 1" long Stainless Steel Hex Head Cap Screw
2
1/4" Stainless Steel Flat Washer
2
1/4" Stainless Steel Nut
1
1/4-20 Nut
- 43 -
Vertical Elements Assembly
QTY
Description
1
3" OD x 72" long, 0.120" wall, 5 drilled holes
1
2.75" OD x 48" long, 0.120" wall, 8 drilled holes
1
2.5" OD x 72" long, 0.120" wall, 8 drilled holes
1
2.25" OD x 72" long, 0.120" wall, 8 drilled holes
1
2" OD x 72" long, 0.120" wall, 4 drilled holes, slits on one end
1
1.75" OD x 72" long, 0.120" wall, slits on one end
1
1.5" OD x 72" long, 0.120" wall, slits on both ends
1
1.25" OD x 72" long, 0.058" wall, slits on one end
1
1.125" OD x 72" long, 0.058" wall, slits on one end
1
1" OD x 72" long, 0.058" wall, slits on one end
1
Black Vinyl Cap for 1" OD Tube
1
80/40 Heavy Duty Insulator, 1.25"/1.5" DIA x 9" long
3
DXE-ECL-1250 Stainless Steel Element Clamp
3
DXE-ECL-1500 Stainless Steel Element Clamp
2
DXE-ECL-1750 Stainless Steel Element Clamp
2
DXE-ECL-2000 Stainless Steel Element Clamp
2
1/4" x 2-3/4" long Stainless Steel Hex Head Bolt
2
1/4" x 3" long Stainless Steel Hex Head Bolt
2
1/4" x 3-1/4" long Stainless Steel Hex Head Bolt
2
1/4" x 3-1/2" long Stainless Steel Hex Head Bolt
16
1/4" Stainless Steel Flat Washer
8
1/4" Stainless Steel Nyloc Hex Nut
80/40 Trap Assembly
QTY
Description
1
Custom Pre-Assembled and Tuned 80/40 Trap Assembly
1
80/40 Antenna Straight Bracket
1
DXE-ECLS-225 2-1/4" Studded Element Clamp
1
DXE-ECLS-175 1-3/4" Studded Element Clamp
2
DXE-ECLS-150 1-1/2" Studded Element Clamp
4
#10-24 Stainless Steel Hex Nuts
4
#10 Stainless Steel Flat Washer
4
#10 Stainless Steel Split Washer
4
#10 Stainless Steel External Tooth Star Washer
Base Matching Network Assembly
QTY
Description
1
Custom made base loading coil assembly with wire & Coil Tap Clip
1
1/4" Flat Washer
1
1/4" Split Lock Washer
1
1/4-20 Nut
- 44 -
Optional DXE-7580-THK Capacity Hat Assembly
QTY
Description
1
Smooth Hub (US Patent No. 7,002,525)
1
0.5" Mast Tube Connector Fitting
7
#8-32 x 1/8" long Stainless Steel Allen Screw - Cup Point
3
#8-32 x 1/4" long Stainless Steel Allen Screw - Flat Point
6
Hot Rodz® - .125" x 48" Stainless Steel
6
Plastic End Cap, 0.110" x 1" long
2
Studded Element Clamp, 1-1/4"
2
#10 Stainless Steel Star Washer
2
#10 Stainless Steel Flat Washer
2
#10 Stainless Steel Split Lock Washer
2
#10-24 Stainless Steel Nut
1
3/8" Stainless Steel Flat Washer
1
3/8" Stainless Steel Split Lock Washer
1
3/8-24 Stainless Steel Hex Nut
1
Top Hat 'L' Bracket
1
5/64" Allen Wrench
Note: This antenna system is normally shipped in several boxes. The hardware parts maybe in more
than one box. The part lists listed above are arranged for ease of assembly.
Additional material required, but not supplied:
DXE-VGMT-3CG -Antenna Mounting Pipe - 3” OD x 7 Feet long 1/4” Wall thickness -
Galvanized Chromoly Steel mounting pipe.
Concrete - For mounting pipe installation (see text for suggestions) Feedline Connection - Use the DXE-UHF-FDFB-KIT SecureMount™ dual SO-239
Bulkhead Mount Connector
Jet-Lube SS-30 JTL-12555 for use with the antenna elements and all hardware.
Suggested Parts Not Included
DXE-VRW-1 - Manual Winch Add-on Raising Kit
Manual winch add-on kit for the High Performance DX Engineering vertical antennas DXE-8040VA-1 and DXE-7580VA-1. The tilt fixtures for these antennas are equipped to accept the winch directly. Allows easy raising and lowering of tall antennas - may be easily moved from one antenna to another in multi-antenna arrays.
DXE-7580-THK - patented CW Optimizer Capacity Hat for 75/80 and 80/40 Antennas
This add-on kit for the DXE-8040VA-1 and DXE-7580VA-1 high performance DX Engineering THUNDERBOLT® vertical antennas allows the center of resonance to be moved down to the low band edge for dedicated CW ops. Consists of hub and 48" adjustable Hot Rodz®. Easy to add
to or remove from upper antenna mast with single bolt after lowering antenna.
DXE-RADP-3 - Radial Plate (patented):
Made from Laser Cut Stainless Steel with 20 Sets of Stainless Steel Radial Attachment Hardware. The DX Engineering Radial Plate is meant for those of you having a vertical antenna and want an easy, neat and effective way to connect those essential radial wires to your antenna system for the highest efficiency and strongest signals.
- 45 -
DXE-SSVC-3P - Stainless Steel V-Clamp for 2 to 3 inch steel pipe
This V-Clamp is made in one size that fits Steel tubing or pipe from 2 to 3'' OD as used in antenna construction. The supplied V-bolt is long enough to attach tubing to thick plates and is made with anti-corrosive properties. The special Stainless Steel saddle has serrated teeth will clamp to the pipe securely by biting into the surface. For this reason, it is not recommended for softer aluminum tubing or pipe. U-Bolt thread dimensions: 3/8"-16 x 1.75". V-bolt and saddle made from high-strength 18-8 stainless steel.
DXE-RADP-1HWK - Radial Plate Wire Attachment Hardware Kit
Additional 20 Sets of ALL Stainless Steel Radial Hardware for use with the DX Engineering Stainless Steel Radial Plate.
(20) 1/4'' Bolts - (20) 1/4'' Nuts - (20) 1/4'' Flat Washers (20) 1/4'' Split Washers - (20) 1/4'' Star Washers
DXE-UHF-FDFB-KIT - Silver Plated Female SecureMount™ Bulkhead Connector - Dual SO-239
The DX Engineering Silver Plated Female SecureMount™ Bulkhead Connector is a high-quality silver-plated connector that provides a positive, permanently secure connection for your coaxial cable. The two-sided SO-239 female connector has a superior silver-plated body with silver contacts to ensure the best performance for any application. The SecureMount™ flange, which employs four mounting screws, means that the bulkhead connector won't work loose like those with concentric nuts and washers. Once mounted to any panel or bulkhead, the flanged bulkhead connector will provide the best possible connection and stay that way. Additionally, when using our Radial Plate, Tower Leg Brackets or SO-239 Mounting Brackets, the SecureMount™ Bulkhead Connectors are the best way to bond your coax to ground this side of Cad-Welding! Unlike many common nickel-plated bulkhead connectors, our silver-plated SecureMount bulkhead connectors have no air space within their midpoint. This area of solid and superior PTFE dielectric between the center conductor and body maintains constant impedance and ultimate performance.
Description: Bulkhead mount, UHF jack to UHF jack (SO-239) Body Material: Brass Body Plating: Silver Body Style: Flanged Dual Female SO-239 Contact Plating: Silver Frequency Range: DC - 500 MHz Dielectric: PTFE Impedance: 50 ohms Includes Stainless Steel Hardware Kit for mounting
JTL-12555 Jet-Lube™ SS-30 Pure Copper Anti-Seize
Jet-Lube™ SS-30 Pure Copper Anti-Seize is the top choice of engineers and technicians in government, industry and leading Amateur Radio contest stations, for protecting mechanical assemblies of aluminum tubing, general hardware and copper grounding systems. On bonded metal surfaces Jet-Lube™ SS-30 assures electrical and RF conductivity while preventing oxidation and corrosion. Surpassing the capabilities of other aluminum anti-oxidants, the wide temperature range of Jet-Lube™ SS­30 prevents long-term drying and caking, and allows easy disassembly and effortless cleaning of parts. An environmentally preferred thread lubricant and conductive termination compound, Jet-Lube™ SS-30 helps keep your equipment in serviceable condition. It contains a high concentration of copper flakes, a requirement for heavy loads or compression; controlled frictional characteristics allow the surfaces of nuts and bolts to be tightened to their design torque specifications. This anti-seize product assures full hydraulic efficiency by allowing the metal surfaces to slide over each other without damaging metal-to-metal contact. Jet-Lube™ SS-30 is also designed to work as a similar and dissimilar component between two metal surfaces to prevent seizing and galvanic action. The SS-30 compound formula improves conductivity and ground continuity - and will not melt in high temperatures. Features include:
* Meets MIL-PRF-907E spec * K-factor: 0.13 * Service rating: -65 degrees F (-54 degrees C) to 1800 degrees F (820 degrees C) * SS-30 Resistivity (ohm-CM x 108) 5
* This product is limited to domestic UPS Ground shipping only
- 46 -
Optional Accessory Items
DXE-STPL - Radial Wire Anchor Pins, 100/pack - No need to bury your radials!
DX Engineering Radial Wire Anchor Pins are perfect for fastening radials below the grass line to eliminate the risk of damaging your radials during lawn maintenance.
100 count - 6'' Pins 11-Gauge
DXE-STPL-100P
Radial Wire Anchor Pins, 100/pack
DXE-STPL-300P
Radial Wire Anchor Pins, 300/pack
DXE-RADW - 500K or 1000K Radial Wire Kits and Components
To achieve optimal performance with a ground-mounted vertical, install as many radials as possible. These bulk radial wire kits use insulated wire that is UV resistant, hard to see and lays down easily, unlike the wire that is commonly available at the big box stores. It will last much longer in contact with soil than bare wire. The DXE-RADW- 500K or 1000K kit provide everything you will need to build the perfect radial system!
500/1000 ft. spool of 14 AWG, stranded copper wire with vinyl insulation 20/40 lugs 100/200 radial wire anchor pins - eliminating the need to bury your radials! Build up to 20/40 radials, 25 feet long
DXE-RADW-500K
Bulk Radial Wire Kit, 500 ft. Spool of Wire, 20 Lugs, 100 Staples
DXE-RADW-1000K
Bulk Radial Wire Kit, 1000 ft. Spool of Wire, 40 Lugs, 200 Staples
DXE-RADW-500KBD or 1000KBD - Bulk Radial Wire Kits and Components
To achieve optimal performance with a ground-mounted vertical, install as many radials as possible. These bulk radial wire kit use insulated wire that is UV resistant, hard to see and lays down easily, unlike the wire that is commonly available at the big box stores. It will last much longer in contact with soil than bare wire. The biodegradable anchors allow easy installation of radial wires, and will degrade and disappear in a year or so when they are no longer needed. The DXE-RADW-500 or 1000KBD kits provide everything you will need to build the perfect radial system!
500/1000 ft. spool of 14 AWG, stranded copper wire with vinyl insulation 20/40 lugs 100/200 biodegradable radial wire anchor pins- Eliminating the need to bury your radials! Build up to 20/40 radials, 25 feet long
DXE-RADW-500KBD
Bulk Radial Wire Kit, 500 ft. Spool of Wire, 20 Lugs, 100 Biodegradable Staples
DXE-RADW-1000KBD
Bulk Radial Wire Kit, 1000 ft. Spool of Wire, 40 Lugs, 200 Biodegradable Staples
DXE-225RT-20 - Ring terminal 16-14 Wire Gauge, 1/4" hole/20 Pack
\his is a set of 20 ring terminals for AWG #14 to #16 wire with a clearance hole for a 1/4" bolt. These are the same crimp terminals supplied with the DXE Radial Wire Kits for #14 Radial and Antenna Wire.
DXE-RADW-20RT/-32RT/-65RT Pre-Assembled, Radial Wire, with 1/4" ring Terminals, 20 Pack
The DXE-RADW Radial Wire Kits include the highest quality 14 gauge stranded copper wire with a relaxed black PVC insulation for easy installation of your radial system. They allow fast and easy installation of your radial ground system, and permit you to mix and match different length to fit the available space. The stranded wire and relaxed insulation mean that the wire will lay flat as you place it on the ground - easy to install! The twenty pre-cut radial wires include 1/4" ring terminals professionally crimped on one end for quick and easy attachment to the radial plate. These Radial Wire Kits are designed for users of vertical antenna systems which have the need for a high quality radial system for optimum antenna performance. The 1/4" ring terminals are machine crimped for maximum grip. Soldering is not required for strength, but is recommended if installed in corrosive environments such as salt spray.
Packed 20 Radial Wires per package 14 gage, stranded copper wire Black relaxed PVC insulation 1/4" Ring Terminal professionally crimped on each Radial Wire 3 lengths to choose from: 20 Ft (-20RT), 32 Ft (-32RT), 65 Ft (-65RT)
DXE-RADW-20RT
Package of 20 each 20 Ft Radials with 1/4" Ring Terminals
DXE-RADW-32RT
Package of 20 each 32 Ft Radials with 1/4" Ring Terminals
DXE-RADW-65RT
Package of 20 each 65 Ft Radials with 1/4" Ring Terminals
- 47 -
SUM-900031 - Automatic Wire Stripper/Crimper/Cutter, 24-10 Ga.
Our wire stripper uses a spring-loaded design to make quick work of wires ranging from 24 to 10 gauge. Just insert the wire, squeeze the handle, and listen for the click. That’s the sound of another perfect wire stripping job performed in about 2 seconds - a fraction of the time it takes your pocket knife to do the same job. An adjustable wire length guide helps you make uniform strips, and a built-in wire cutter and crimper helps you complete your wiring job.
Spring-loaded design Strips wires ranging from 24 to 10 gauge built-in wire cutter and crimper
DXE-T001 - DX Engineering SO-239 Connector Installation Tool Kit
This DX Engineering SO-239 connector installation tool kit offers an easier installation of chassis or bulkhead mount SO-239 coaxial connectors. Having the right tools can make all of the difference in your shack, and this handy DXE tool provides you with a special dual-use stainless steel wrench, plus a multipurpose 6-in-1 screwdriver/nut driver tool. One end of the wrench is a 3/4 in. semi-box wrench with a pass-through for coaxial cable--perfect for tightening the larger nuts used to mount bulkhead connectors. The other end is a 3/16 in. box wrench for tightening mounting nuts with SO-239 hardware. You'll receive six combinations - two Phillips heads, two flatheads, and a 1/4 in. nut driver and a 5/16 in. nut driver, which store in the handle of the screwdriver. The added SO-239 wrench is ideal for use with the DXE-UHF-FDFB-KIT - Silver Plated Female SecureMount™ Bulkhead Connector.
3M Temflex™ 2155 Rubber Splicing Tape
Conformable self-fusing rubber electrical insulating tape. It is designed for low voltage electrical insulating and moisture sealing applications. For outdoor use, it should be protected from UV deterioration with an overwrap of Scotch
®
Super
33+. Scotch® Super 33+
Highly conformable super stretchy tape for all weather applications. This tape provides flexibility and easy handling for all around performance. It also combines PVC backing with excellent electrical insulating properties to provide primary electrical insulation for splices up to 600V and protective jacketing. Both tape products are available from DX Engineering.
Technical Support
If you have questions about this product, or if you experience difficulties during the installation, contact DX Engineering at (330) 572-3200. You can also e-mail us at:
DXEngineering@DXEngineering.com
For best service, please take a few minutes to review this manual before you call.
Warranty
All products manufactured by DX Engineering are warranted to be free from defects in material and workmanship for a period of one (1) year from date of shipment. DX Engineering’s sole obligation under these warranties shall be to issue credit, repair or replace any item or part thereof which is proved to be other than as warranted; no allowance shall be made for any labor charges of Buyer for replacement of parts, adjustment or repairs, or any other work, unless such charges are authorized in advance by DX Engineering. If DX Engineering’s products are claimed to be defective in material or workmanship, DX Engineering shall, upon prompt notice thereof, issue shipping instructions for return to DX Engineering (transportation-charges prepaid by Buyer). Every such claim for breach of these warranties shall be deemed to be waived by Buyer unless made in writing. The above warranties shall not extend to any products or parts thereof which have been subjected to any misuse or neglect, damaged by accident, rendered defective by reason of improper installation, damaged from severe weather including floods, or abnormal environmental conditions such as prolonged exposure to corrosives or power surges, or by the performance of repairs or alterations outside of our plant, and shall not apply to any goods or parts thereof furnished by
Buyer or acquired from others at Buyer’s specifications. In addition, DX Engineering’s warranties do not extend to other equipment and parts manufactured by others except to the extent of the original manufacturer’s warranty to DX Engineering. The obligations under the foregoing warranties are limited to the precise terms thereof.
These warranties provide exclusive remedies, expressly in lieu of all other remedies including claims for special or consequential damages. SELLER NEITHER MAKES NOR ASSUMES ANY OTHER WARRANTY WHATSOEVER, WHETHER EXPRESS, STATUTORY, OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS, AND NO PERSON IS AUTHORIZED TO ASSUME FOR DX ENGINEERING ANY OBLIGATION OR LIABILITY NOT STRICTLY IN ACCORDANCE WITH THE FOREGOING.
©DX Engineering 2021 DX Engineering®, DXE®, DX Engineering, Inc.®, Hot Rodz®, Maxi-Core®, DX Engineering THUNDERBOLT®, DX Engineering Yagi Mechanical®, EZ-BUILD®,
TELREX®, Gorilla Grip® Stainless Steel Boom Clamps, Butternut®, SkyHawk™, SkyLark™, SecureMount™, OMNI-TILT™, RF-PRO-1B®, AFHD-4® are trademarks of PDS Electronics, Inc. No license to use or reproduce any of these trademarks or other trademarks is given or implied. All other brands and product names are the trademarks of their respective owners.
Specifications subject to change without notice.
Loading...