Dux 135D5N, 170D5L, 135D5L, 170D5N, Prodigy 5 135D5N Owner's Manual

...
Specications and materials may change without notice. Effective for all Prodigy 5 water heaters manufactured and sold after 1st January 2013.
Owner’s Manual
Models: 135D5N, 135D5L, 170D5N, 170D5L
5 Star Gas Hot Water Heater
H3109 3109 Rev. E
Owner’s Information
Warranty
For advice, repairs and service, call:
1300 365 115 (Australia) 0800 729 389 (New Zealand)
Carefully remove all packaging and transit protection from the heater before installation. Dispose of the packaging responsibly using re-cycling facilities where they exist.
Owner’s Manual – Prodigy 5
H3109 3109 Rev. E
Welcome To Dux Hot Water 1
Installation Details 2
Plumbing Connections 3
Specications 6
Gas Connections 7
Commissioning Adjustments 8
Owner’s Information 12
System Maintenance 14
Troubleshooting 15
Warranty 17
Other Information 22
Contents
© Dux Manufacturing Limited 2012. All rights reserved.
Owner’s Manual – Prodigy 5
1
H3109 3109 Rev. E
Welcome To Dux Hot Water
Your decision to purchase a Dux Hot Water system will reward you for many years to come.
Since 1915, the Dux range has seen continuous research and development, resulting in many breakthroughs in the efciency, reliability and longevity of hot water systems.
Dux water heaters are manufactured in Australia in a state-of-the-art facility, using a Quality Endorsed Company production system.
This is your assurance that you have purchased the highest quality water heater available, one that will provide continuous hot water for all your needs – safely, economically, and for many years to come.
To be upfront about it, we want Dux to be your brand of choice. So you can depend on us to provide more than just a hot water system.
You can rely on Dux products and choose them with condence. We’ll make sure you have the information, the quality and the innovation you’re looking for, including the latest energy-saving alternatives. If you should ever have a problem – and we’ll bet you won’t – you’ll nd that we’re easy to get hold of, friendly to talk to and quick to act. Our service is all about providing anything you need as soon as you need it.
Go with Dux and you’ll have a dependable, economical, efcient hot water system designed to perform well, year after year. And that’s a promise.
Owner’s Manual – Prodigy 5
2
H3109 3109 Rev. E
Installation Details
Outdoor Tank Installation
The water heater must be installed outdoors, with the minimum clearances as shown in the gure below.
We recommend a plinth be installed under the water heater where the water heater is subjected to wet conditions.
Minimum clearance around the windows and doors must be maintained – refer to AS 5601.
Location
The water heater should be located as close as possible to the most frequently used hot water outlet. Ensure that the data label is clearly visible and that there is adequate access for servicing the unit.
Note: All models are equipped with a sacricial anode, accessible through the top cover. Allow 50% of the height of the water heater for clearance above to replace the anode.
A properly drained overow tray must be used where property damage could occur from water spillage. (See AS/NZS3500.4 for further details). Warranty does not cover consequential damage due to heater leakage.
Safety
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Children and animals should be supervised to ensure that they do not interfere with the appliance.
A = 500mm B=300mm min
For further details, refer to
AS 5601 – Gas Installation Code
Owner’s Manual – Prodigy 5
3
H3109 3109 Rev. E
Plumbing Connections
Installation Requirements
This water heater must be installed by a licensed tradesperson, and in accordance with:
AS/NZS3500.4 “National Plumbing and Drainage Code Hot Water Supply Systems – Acceptable Solutions”.
AS5601/AG601 “Gas Installations”.
Local authority regulations.
Outside Australia and New Zealand, please refer to local plumbing and building codes and regulations.
Notice to Victorian customers from the Victorian Plumbing Industry Commission – this water heater must be installed by a licensed person as required by the Victorian Building Act (1993). Only a licensed person will give you a compliance certicate, showing that the work complies with all the relevant Standards and only a licensed person will have insurance protecting their workmanship for 6 years.
Water Supply Pressure
This water heater is designed for direct connection to water supply pressures of no greater than:
All Litre Models – 1120kPa
Where the mains pressure can exceed or uctuate beyond the pressure shown above a pressure limiting device (complying with AS1357) must be tted in the cold water inlet supply. This device must be installed after the isolating valve and set below the pressure shown above. Note during periods of lower demand water pressure may increase.
Pool Heating
This water heater must not be used for pool heating.
Plumbing Connections
Owner’s Manual – Prodigy 5
4
H3109 3109 Rev. E
Plumbing Connections
Pressure & Temperature Relief Valve
The Pressure & Temperature Relief Valve is supplied loose with the water heater. The valve rating is:
All Models – 1400kPa
The PTR valve must be installed directly into the top socket marked “RELIEF VALVE”. The drain line from this valve must run in a continuously downward direction in a frost-free ambient position with the discharge end left open to atmosphere permanently.
The PTR Valve is not intended to enable connection of the water heater to supplementary energy sources such as solar panels or slow combustion stoves (refer AS/NZS 3500.4 for guidance on these types of installations).
Open the PTR Valve for approximately 10 seconds by lifting the lever on the valve to ensure water is relieved to waste through the relief drain pipe. Lower lever gently and check that it closes correctly.
Warning: We recommend that you open the PTR valve at least once every six (6) months. Failure to do this may result in problems with the water heater.
The PTR Valve must not be tampered with or removed. The water heater must not be operated unless this valve is tted and in working order.
The PTR Valve should be checked for adequate performance or replaced at
intervals not exceeding 5 years, or less in areas where local regulations apply.
Important: The PTR Valve and its drain outlet pipe must not be sealed or blocked. It is normal for the PTR valve to leak a small amount of water during heating cycles.
Cold Water Connection
It is mandatory to t the following items between the supply main and the RP¾"/20mm socket in the water heater.
an isolating valve
a non return valve
a line strainer
a union
All ttings must be approved by the relevant Authority and in accordance to the plumbing code.
Union Connection
Non-return Valve
Line Strainer
Cold Water Inlet
Drain
Pressure Relief Valve
Isolating Valve (Spindle Vertical)
Note: a combined isolating valve/non­return valve/line strainer may be used. Expansion valve only required where local regulations demand.
Owner’s Manual – Prodigy 5
5
H3109 3109 Rev. E
Plumbing Connections
Note for S.A. and W.A.: It is a state requirement that a pressure relief valve be tted on the cold water supply line between the non return valve and the water heater.
Hot Water Connection
The hot water line should be connected to the “OUTLET” socket on the tank.
Insulation of Pipes
All hot water pipes must be insulated with UV stabilized insulation.
Temperature Protection
All water heaters have the ability to produce hot water very quickly. To reduce the risk of scald injury, it is mandatory under the requirements of Australian Standard AS/NZS3500.4 that a suitably approved temperature control device, such as a tempering valve, be tted to the hot water supply to outlets used primarily for personal hygiene.
Owner’s Manual – Prodigy 5
6
H3109 3109 Rev. E
Specifications
System Components
Component Description
1 PTR Valve
2 Hot Water Outlet To House
3 Cold Water Inlet
Tank Specifications
Model Numbers 135D5N,
135D5L
170D5N,
170D5L
Capacity (L) 135 170
Net Weight Empty (kg) 76 88
Relief Valve Pressure (kPA) 1400 1400
Gas Consumption (Propane) 22.5 MJ/h 26 MJ/h
Gas Consumption (NG) 23.5 MJ/h 27 MJ/h
Dimensions (mm)
A – Height 1610 1910
B – Hot Water Outlet 1320 1620
C – Cold Water Inlet 220 220
Loading...
+ 16 hidden pages