Arched Coping
Description:
The arched coping offers a complete finish to any
parapet wall. The system utilizes pre-notched lap joints,
allowing for fast and secure installation and yielding
positive water drainage.
Fabricated in 5’ lengths to fit each arch radius
specification; Widths are customized to
specification.
Three piece construction using Pittsburgh seam.
Fabricated to wall width 6” to 40”.
3” minimum face and back leg size.
Hemmed drip kick to receive splice cleats.
Splice cleats spaced 24” o.c.
Contact Duro-Last® or EXCEPTIONAL® Metals to
request a color chart, samples and information
regarding custom metals and finishes.
Energy Efficiency:
LEED® and ENERGY STAR® compliant; Recyclable.
Installation:
1. A wood nailer attached to the top of the parapet
wall is required.
2. This nailer should be attached to the wall in
accordance with ANSI/SPRI ES-1 3.9.
3. Install the arched coping in accordance with
Duro-Last detail drawing #6056 and #6056
installation.
4. Any deviation from the requirements set forth in
the detail drawings must be pre-approved, in
writing, by the EXCEPTIONAL Metals Technical
Department.
Warranty:
Duro-Last offers a wide range of warranty coverage for
EXCEPTIONAL Metals products when used with the
Duro-Last roofing system, including paint and finish.
Technical Services:
Product samples, detail sheets, color chips, and color
chart are available for your submittal package. For
assistance with questions or submittals, contact your
local representative or call EXCEPTIONAL Metals.
“Duro-Last” and “EXCEPTIONAL” are registered marks owned by Duro-Last Roofing, Inc. Revised 8/30/2012