Duerkopp Adler 745-26, 745-28 Installation Instructions Manual

Page 1
Contents page:
Part 2: Installing instructions Kl. 745-26/ -28
1. Items supplied
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Setting up the sewing machine
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Removing the carriage safety device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.3 Adjusting working height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.4 Checking V-belt tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3. Attaching fitments removed for despatch
. . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.1 Pedal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.2 Thread pillar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.3 Trays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.4 Folder (working method A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3.5 Folder and
gripper-folder (working methods B, C) . . . . . . . . . . . . . . . . . . . . . . . . . 8
3.6 Table wideners (accessories) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.7 Stacker (accessory) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.8 Suction device (accessory) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4. Electrical connection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.1 Connecting the DAC operating panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.2 Checking rated voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4.3 Checking positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5. Pneumatic connection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
6. Lubrication
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
7. Starting up
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Page 2
Page 3
1. Items supplied
frame with DC mo to r fo r th e u pp er m ac h ine as se mb l y
stepping motors for handling material and for the longitudinal adjustment of th e trimming devi c e
class 935-246-00 twin-needle double-lockstitch machine 745-26: with component se t 0 93 5 7 45 30 4 f or j o i nt ne ed l e-bar switching 745-28:with component set 0935 745307 for separate needle-bar switching
DAC control device
reflex light barrier for flap sensing
two guide lamps for fabric placement
sewing lamp
compressed- a ir ma i nt en an c e u ni t wi t h c o mp r ess e d- a i r pi s t ol
thread pillar
trays for it em s to be s ew n o n o pe r at or’s right a nd l ef t
tools and hard wa re s e t
2. Setting up the sewing machine
Attention!
The sewing machine may only be set up by specialist trained personnel.
2.1 Removing the carriage safety device
The carriage safety device 1 locks the carriage in its rearmost position. It must be remo v ed be fo re the sewing mac hi n e i s s e t u p.
Remove the carriage safety device 1 after undoing the nuts.
1
3
Page 4
2.2 Movement
The sewing-machine chassis is fitted with four castors for movement around the plant.
Attention!
Prior to commissioning the sewing machine the sound absorbers 3 (in the tools and hardware set) must be fitted to the four chassis supports. Reverse the castors so that the machine is motionless and stable.
To move the machine extend the four castors by turning the adjusting screws 2 to the left. The chassis s u pp or t s mu s t h av e en ou gh free floor space t o a l l ow for movement .
After moving the sewing mac hi n e, l ow er i t by t urn i ng th e adjustment screws 2 to the right. All four chassis supports must be firmly on the floor.
2.3 Adjusting working height
Working height can be adjusted between 87 and 110 cm (measured to the top of the t ab l e p l at e).
It is set to the minimum of 87 cm prior to despatch. –
Undo locking screws 1 on all four spars of the chassis.
Adjust the base plate to the required working height. To prevent the base p l at e f r om ti lting, pull it ou t (o r pu s h i t i n) b y the same amount on both sides.
Tighten locking sc rews 1.
3
1
2
4
Page 5
2.4 Checking V -belt tension
When the machine has been moved the V-belt tension (which is pre-set prior to despatch) must be checked.
When the tension is correct it should be possible to depress the middle of the V-belt 1 by about 10 mm by pressing on it with a finger.
Correcting V-belt tension:
undo screw 2
swivel sewing drive 3 until the required V-belt tension is produced
tighten scre w 2
1
2
3
5
Page 6
3. Attaching fitments removed for despatch
3.1 Pedal
Depending on th e ve r si on , t he s ew i ng ma chi n e i s e qu i pp ed ei t he r wi t h a single peda l or w i th two (right and le ft).
The pedal 4 is attached to the lowe r cr oss - m embe r 5: –
Fix the pedal 4 to the lower cross-member 5 with the bracket 3. The oblong sl ot s i n t he br a c ket 3 enable the hei g ht to be slightly adjusted. Adjust the h ei g ht of br a c ket 3 s o th at the pedal 4 can be ea s i l y operated.
The second bracket 1 (supplied) acts as a support. Attach bracket 1 as shown in the illustrations, placing the fo ur s e pa r at or ri n gs 2 be tw ee n brackets 1 and 3 .
Fit pedal linkage 6.
Slightly loosen locking screw 7.
Adjust the he i gh t o f t he pedal linkage 6 s o th at the pedal 4 is horizontal when fully depressed.
Tighten locking sc rew 7.
1 2 3 4
5
6
3 5
6
7
6
Page 7
3.2 Thread pillar
Insert thread pillar 1 into the hole in the table plate and secure it with nuts 2 and washers.
Fit and align thread discs and unwinder arms as shown in the illustration.
3.3 Trays
Insert trays
with rod 5 into locking piece 4 and align.
Tighten locking lever 3.
1
2
3 4 5
7
Page 8
3.4 Folder (working method A)
Place Folder
6 with span be ar ing 5 on the mount ing bolt of lock ing piece 1 as far as it will go. The pin 3 must e nt er o bl o ng s l ot 4.
Tighten locking sc rew 2. The resulting setting will be as pre-set prior to despatch.
3.5 Folder and gripper-folder (working method B, C)
Fixing the Folder
swivel folding unit away to the side
place Folder
3 on mounting 2
tighten locking screw 1. Mounting 2 in c orporates a cent eri n g h ol e . Tightening the loc k i ng sc r ew 1 a ut om atically bring s ab ou t the correct setting.
3 4
5
6
1 2
1
2
3
8
Page 9
Fixing the gripper-folder
swivel folding unit inwards
push gripper-folder with mounting 5 onto rod 7 as far as it will go The pin 4 must enter oblong slot 3.
tighten loc k ing s c rew 8 The resulting setting will be as pre-set prior to despatch.
Insert compressed-air connection 6 for needle spreading.
With working method C insert compressed-air connections 1 and 2 for braiding c u tt er s.
6
7
8
1 2
3 4 5
9
Page 10
3.6 Table wideners (accessories)
Table widener for trouser seats
(order no. 0794 00 21 51 )
Attach table widener 1 with screws 2 and the strap located behind the frame member 3.
Slightly loosen the screws on the upper side of the table. Push table widener 1 to create a gap between it and the table plate. This gap is n ee de d s o th at th e p oc k e t c a n p as s f r ee l y th rou gh once it has been placed in position.
Table widener for jacket fronts
(order no. 0794 002101)
Attach table widener 4 to support table with screws 5.
1 2
3
4 5
10
Page 11
3.7 Stacker (accessory)
The throw-over stacker (Order no. Z112 427514) is attached to the frame of the sewing unit with holder pipe 1.
At delivery of th e s e wi n g u ni t th e h ol d er p ipe 1 is already p remounted on the frame br ace 3.
If the throw-o ver s t ac ke r i s de li v er e d se parately packe d, th e h ol d er pipe 1 must fi rs t b e a ttached to the fr am e b r ace 3 of the sewing un i t.
Mount guard pl a te 12 on th e housing 11 of the throw-over s t ac k e r with screws, washers and spring washers.
Fasten holder pipe 1 on the frame brace 3 of the sewing unit with screws, washers and brackets 6.
Fasten spar 4 on th e b r ac e 5 o f t he s ta c ker s t an d w i th s c rews, washers and bracket 7.
Insert the ri bb ed pl u g 8 i n s p ar 4 .
Push the thr ow - ove r s ta c ker t ow ar d th e f r am e o f t he s ew i ng un i t s o that spar 4 catc h es i n th e h ol d er p ipe 1. The height of spar 4 is adapted to the holder pipe 1 via the slots in brace 5 of the stacker stand.
Insert the c ou pl in g plug of the comp r ess e d a i r fe ed i nt o h os e coupling 10.
Insert the c ou pl in g plug of the cont r ol le ad into hose cou pl in g 9.
Attach one en d o f the potential c a bl e 13 to th e s t op pe r pl a te 14 of the throw-over s t ack e r wi t h t he en c l ose d w i ng nu t. Attach the other end to the frame of the sewing unit with the existing win g nut . The potential cable 13 serves to conduct static charge s to ground.
After startin g t he s ew i ng un it with the throw-o ver stacker open, set the clearance to the sewing unit. The sewing pieces must secu r ely e nt er t he op en i ng be tween the smoother and the stacked-goods support.
Tighten clam ping lever 2.
1 2 3 4 5
6 7 8
9
10
15 13
11
12
13
14
11
Page 12
3.8 Suction devic e (acces sory)
The suction device (order no. 0722 004282) facilitates the exact positioning of materials on the working tab l e.
Attention!
Do not reverse ho s es 2 an d 5 . Hose 2 must always be connected to pipe socket 6. The pneumatically-operated air valve is fitted to pipe socket 6.
Lay hose 2 from the settling container 7 to the vacuum-connection socket 1 of the sewing-machine table.
Connect compre ss ed -ai r h os e 3 f r om cy l ind er 4 of th e a ir val v e to the Y41 solenoid valve.
Connect hose 5 to pi p e s o ck et 8 o f se ttling containe r 7. Connect other end of hose to on-site vacuum equipment or to the centrifuga l bl o w e r.
Note:
If there is no on-site vacuum equipment a centrifugal blower must also be ordered.
Attention!
It is essential for filter bag 9 to be fitted beneath hose 5. Filter bag 9 pr o te c ts the vacuum gene rator from being penetrated by dust and parti cl e s of di r t .
Hoses 2 and 5 mu s t t he r ef ore on no account be sw ap pe d.
1
2
2 3 4 5
6 7 8
5
9
12
Page 13
4. Electrical connection
Attention!
All work on th e e l ec t ri c al e qu i pm en t o f t he s ewing machine m ust be carried out by specialist electricians or other appropriately-trained persons. The mains plug mu s t b e r e mo v ed .
4.1 Connecting the DAC operating panel
The DAC operating panel 1 is mounted on the right-hand side of the machine, see n f rom the operator’s viewpoi nt .
Fit operating panel 1 with clamps 4 and 6 to attachment bracket 5 and adjust angle.
Firmly tighten clamping screws on clamps 4 and 6. Attach potent i al c a bl e 3 t o c lamp 4. The function of the potential cable is to discharge static charges to earth.
Slightly un do lock nut 7 on a tt ac h me nt br a ck et 5.
Rotate operating panel 1 until the operator has the best possible view of the di s pl a y.
Firmly tighten lock nut 7.
Carefully insert plug 2 into the back of the operating panel.
Tighten screws of plug 2.
1
2 3 4 5 6
7
13
Page 14
4.2 Checking rated voltage
The rated volt ag e s p ec i f i ed on th e i d en ti f i cation plate mus t c o i nci d e with the mains voltage.
The sewing ma chi n e c a n b e a da pted to the local m ai n s vol t ag e b y means of terminals 1 to 5 on the transformer (see sketch).
The wiring for connection to 3-phase mains supplies is shown in the terminal conn ec t i on di a gr a m. If several DC d ri v es a re c o nn ec t ed th es e s ho ul d be un i fo r mly distributed o v er a l l ph as e s .
3 - 2 : 190V 3 - 1 : 200V 4 - 2 : 210V 4 - 1 : 220V 5 - 2 : 230V 5 - 1 : 240V
230V
5 4 3 2 1
14
Page 15
4.3 Checking positioning
Before the machine is started the positioning set prior to delivery should be checked.
Once the main sw it c h i s t ur n ed on th e se wi n g m ac h ine ad op ts t he thread-lever-up position.
Caution - danger of injury
Turn off the main switc h. Positioning should only be checked or adjusted with the main switch turned off.
Checking positioning
Turn off the main switch.
Turn thread lever with handwheel to top dead centre position. The thread lever must be just commencing its downward movement.
In this position notch 2 on the positioning ring 1 must be in line with notch 3 on the position indicator 5.
Adjust positioning if necessary.
Adjusting positioning
Undo clamping screws 4 on positioning ring 1.
Rotate positioning ring until notch 2 on it is in line with notch 3 on position indi c a to r 5.
Firmly tighten clamping screws 4.
1 2 3
4 5
15
Page 16
5. Pneumatic connection
The sewing machine must have a supply of water-free compressed air to operate its pneumatic components.
Attention!
For the pneuma tic c o nt r ol p roc e s ses t o function proper l y t he compressed- air s u pp l y mu s t b e c o nf i gu r ed as f ol lows:
Even when air c o ns u mp ti o n i s a t i t s peak the operati n g p res s u re must not fall below
5 bar
.
If pressure fall-off is excessive: –
increase compressor power
increase diameter of compressed-air lines.
Connecting compressed-air maintenance unit
Connect connection hose 1 (order no. 797 3031) to the compressed-air supply with a R 1/4" hose connection.
Adjusting operating pressure
Operating pressure is
6 bar
.
It can be read off pr e ss ur e ga ug e 3 .
To adjust operating pressure lift and turn knob 2. To increase pressure: turn clockwise To decrease pressure: turn anti-clockwise
Attention!
No compressed ai r c o nt ai n i ng oi l m us t be ad mi t te d f r om th e a i r sup pl y. Clean compressed air is taken from behind the filter to clean machine
components and material by air-blasting. Any oil droplets in the compressed air cause malfunctions and leave marks on the material.
2
3
1
16
Page 17
6. Lubrication
NB
Before starti n g t he ma c hi n e i t s up pe r ass e mb l y mu s t b e supplied with oil.
The oil-supply container must be filled only with
ESSO SP-NK 10
lubricating oil. SP-NK 10 can be obtained from
DÜRKOPP ADL ER AG
sales outlets.
Oil-supply container 1 for upper-assembly lubrication
Fill oil-supply container 1 with oil through the holes in the sight glass. The oil level must be between the "Min." and "Max." marks.
Oil-supply container 3 for gripper lubrication
Move upper ass e mb l y of ma c hi n e t o o ne s i de .
Fill oil-supply container 3 with oil through nipple 2 up to the "Max." mark.
1
2 3
2
3
17
Page 18
7. Starting up
Turn on main switch . Control is initialised. The DÜRKOPP-ADLER logo briefly appears in the operating-panel display.
The control unit checks whether the carriage is in its rearmost position. If not, "
<====REF
" (reference travel) appears in the display.
Depress left-h an d p ed al. Reference tr a vel c o mm en c es . The carriage moves to its rearmost position. Reference travel is necessary to ensure that the carriage is always in its defi ne d starting positi o n.
The display ch an ge s to th e s e wi n g-m ac h ine ma i n s cr e en .
By operating the appropriate pedals the vari ou s pl a cem ent stages are activated i n s eq ue nce an d s e wi n g is co mm en c ed . The individ ua l s ta ge s de pe nd on th e w or k i n g m et ho d a nd on th e configurat ion of the machine .
Attention!
At the commencement of sewing the material must be beneath the feeding clam ps. Moving the ca rr i ag e w i th ou t m at er i a l da ma ge s th e co v er i n g o f t he feeding clam ps.
For the choice of sewing program and further control-unit adjustment see part 4 ("DAC 745-26/-28: brief description").
Placement an d o pe r at i on are de s c ri be d i n pa r t 1 ( "745-26/-28: operating instructions").
<==== REF
18
Loading...