Duerkopp Adler 550-12-12 Installation Instruction

Contents Page:
Home
Part 2: Installation Instructions Cl. 550-12-12
1. Scope of Delivery
2. Installing the Sewing Unit
2.1 Setting the Work Height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Mounting the Thread Stand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.4 Filling Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.5 Connecting the Compressed Air Maintenance Unit . . . . . . . . . . . . . . . . . . . . . . . . . 5
3. Electrical Connection
3.1 Checking the Nominal Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.2 Checking Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1. Scope of Delivery
Basic equi pm en t c o nsi s t s of : –
– – – – – – –
Optional equ i pm en t B o r de ri ng (special or de r)
2. Installing the Sewing Unit
ATTENTION !
The sewing unit may only be set up by trained skilled personnel.
Complete s ew i ng ma c hi n e f or a dv a nc e c ri mp i ng Frame MG53-3 wi t h p al l e t t ab l e t op 15 30 x 95 1 m m Multi-program controls 200-3 Direct current positioning drive Compressed Air Maintenance Unit Sewing light Thread stand Tools and small parts in the accessories pack
2.1 Setting the Work Height
Before installing the sewing unit it is essential that all transport security be removed !
The work height is adjustable between 75 cm and 85 cm (measured to the top of the t ab l e) .
1
Loosen the se t s c re w s 1 on both sides of th e f r am e.
Horizontall y se t t he wo r k pk a te to th e d es ir e d h eig ht . In order to avoid tilting pull out or push in the work plate equally on both sides.
Tighten the set screws 1 again.
3
2.2 Mounting the Thread Stand
Mount the thread stand on the table top as shown in the sketch above.
2.3 Checking the V -belt Tension
After transport the V-belt tension set at the factory is to be checked. The V-belt 1 must be so tensioned that it can be pressed in at the
center by about 10 mm under finger pressure.
1
2
3
Correcting V-belt tension: –
Loosen the nu ts 2.
Swing the s ew i ng dri v e 3 u nt i l th e d es i re d V-belt t en si on i s reached.
Tighten the nuts 2 ag ai n .
4
2.4 Filling Oil
For filling the oil reservoir use only SP-NK 10 is available from the
Fill the hook drive housing and the reservoir for the central oil wick lubrication up to the top line marking with oil (see chapter 3.2 of the Operatin g I ns t r uct i on s ) .
2.5 Connecting the Compressed Air Maintenance Unit
For the opera tion of the sewing foot stroke, sti t c h c o nd en s at i on , t hr e ad trimmer as w ell a s th e o pt i on al e qu i pm en t for bordering t he s ew i ng unit must be supplied with water-free, lightly oiled compressed air.
ESSO SP-NK 10
DÜRKOPP ADLER AG
lubrication oil.
sales offices.
1
2
3
4
5
Connecting the compressed air maintenance unit
Connect the connection hose 5 for the maintenance unit to the compressed air supply with the enclosed coupling.
Filling the oil reservoir
Completely shut off the compressed air by turning the knob 1 counter-clockwise.
Screw out the oil fill screw 2.
Fill the oil reservoir 4 up to the groove marking with
ESSO SP-NK 10
After filling the oil release the compressed air again by pulling up the knob 1 and tu rni n g i t c l ock wise.
Setting the operating pressure
The operating pressure is 6 bar. It can be read on the pressure gauge 3.
To set th e o pe r at i ng pre s s ure pu l l up an d t ur n th e k n ob 1.
Turn clockwise = Increase pressure Turn counter-clockwise = Decrease pressure
lubrication oil.
5
3. Electrical Connection
ATTENTION !
All work on the electrical components of the s ewing unit may o nl y b e conducted by electricians or appropriately trained personnel. The mains plug must be pulled out.
3.1 Checking the Nominal Voltage
The nominal voltage listed on the motor rating plate of the sewing drive and the mains voltage must be the same !
3.2 Checking Positioning
The machine should position when the thread pulling lever is at its upper dead cen te r.
The setting o f t he positioning is u s ua l ly ma de at the factory.
1
2
3
Checking positioning
Turn off the main swit ch.
Bring the thread pulling lever into a central position by turning the handwheel 2.
Turn on the main swit c h. Th e ma c hi n e po si ti o ns . If the thread pulling lever is not in its upper dead center then the position must be reset.
Setting the position
Loosen the th rea de d pins 1 of the syn c hr o ni ze r r ing 3.
Firmly hold the synchronizer ring 3.
Move the thread pulling lever into its upper dead center by turning the handwheel 2.
Tighten the threaded pins 1 again.
Check the positioning again.
6
Loading...