01/2011Rev. index: 00.0Printed in Federal Republic of Germany0791 128102
All rights reser ved.
Property of Beisler GmbH and copyrighted. Reproduction or publication of the content in any manner,
even in extracts, without prior written permission of Beisler GmbH, is prohibited.
This instruction manual is intended to help the user to become familiar
with the machine and take advantage of its application possibilities in
accordance with the recommendations.
The instruction manual contains important information on how to
operate the machine securely, properly and economically. Observation
of the instructions eliminates danger, reduces costs for repair and
down-times, and increases the reliability and life of the machine.
The instruction manual is intended to complement existing national
accident prevention and environment protection regulations.
The instruction manual must always be available at the machine/sewing
unit.
The instruction manual must be read and applied by any person that is
authorized to work on the machine/sewing unit. This means:
–Operation, including equipping, troubleshooting during the work
cycle, removing of fabric waste,
–Service (maintenance, inspection, repair) and/or
–Transport.
The user also has to assure that only authorized personnel work on the
machine.
The user is obliged to check the machine at least once per shift for
apparent damages and to immediatly report any changes (including the
performance in service), which impair the safety.
The user company must ensure that the machine is only operated in
perfect working order.
Never remove or disable any safety devices.
If safety devices need to be removed for equipping, repairing or
maintaining, the safety devices must be remounted directly after
completion of the maintenance and repair work.
Unauthorized modification of the machine rules out liability of the
manufacturer for damage resulting from this.
Observe all safety and danger recommendations on the machine/unit!
The yellow-and-black striped surfaces designate permanend danger
areas, eg danger of squashing, cutting, shearing or collision.
Besides the recommendations in this instruction manual also observe
the general safety and accident prevention regulations!
General safety instructions
The non-observance of the following safety instructions can cause
bodily injuries or damages to the machine.
1. The machine must only be commissioned in full knowledge of the
2. Before putting into service also read the safety rules and
3. The machine must be used only for the purpose intended. Use of
4. When gauge parts are exchanged (e.g. needle, presser foot, needle
5. Daily servicing work must be carried out only by appropriately
instruction book and operated by persons with appropriate training.
instructions of the motor supplier.
the machine without the safety devices is not permitted. Observe all
the relevant safety regulations.
plate, feed dog and bobbin) when threading, when the workplace is
left, and during service work, the machine must be disconnected
from the mains by switching off the master switch or disconnecting
the mains plug.
trained persons.
6. Repairs, conversion and special maintenance work must only be
carried out by technicians or persons with appropriate training.
7. For service or repair work on pneumatic systems, disconnect the
machine from the compressed air supply system (max. 7-10 bar).
Before disconnecting, reduce the pressure of the maintenance unit.
Exceptions to this are only adjustments and functions checks made
by appropriately trained technicians.
8. Work on the electrical equipment must be carried out only by
electricians or appropriately trained persons.
9. Work on parts and systems under electric current is not permitted,
except as specified in regulations DIN VDE 0105.
10. Conversion or changes to the machine must be authorized by us
and made only in adherence to all safety regulations.
11. For repairs, only replacement parts approved by us must be used.
12. Commissioning of the sewing head is prohibited until such time as
the entire sewing unit is found to comply with EC directives.
13. The line cord should be equipped with a country-specific mains
plug. This work must be carried out by appropriately trained
technicians (see paragraph 8).
It is absolutely necessary to respect the safety
instructions marked by these signs.
Danger of bodily injuries !
Please note also the general safety instructions.
ContentPage:
Part 2: Installation Instructions Cl. 1281/5-1
1Scope of delivery ..............................................3
2General Information ............................................3
The scope of delivery depends upon your order.
Sewing unit comprising:
–
1Sewing machine head (depending upon order)
–
2Yarn st and
–
2Control system with operating panel
–
4Workpiece storage members
–
5Stand with table top
–
6Pedal
–
7Suction unit with suction container
–
8Stacker
–
9Transport unit with puller
–
Compressed air monitoring unit with air blow gun
ATTENTION !
The sewing unit may be set up only by trained and qualified personnel.
All jobs on the electrical equipment of the sewing unit may be
performed only by qualified electricians or appropriately trained
personnel.
In the process, make sure that the mains plug is pulled out.
Kindly follow the enclosed operating instructions by the manufacturer
of the drive motor.
2
3
3Setting up the sewing unit
3.1Shipping braces
1
All the shipping braces are to be removed prior to setting up the
sewing unit.
–
Remove safety bands on the yarn stand, machine table etc.
–
Remove protective films 1.
–
Remove safety bands 2 on the stacker.
2
4
–
Remove the safety braces on the mouse 4 and the return device 3.
4
3
3.2Adjusting the working height
1
1
The working height can be adjusted between 850...1200 mm
(measured up to the upper edge of the table top).
–
Loosen the screws 1 at the spars.
–
Adjust the sewing unit to the desired working height with the
appropriate auxiliary means.
Lift the work table uniformly on both sides in order to prevent
twisting.
–
Retighten the screws 1 at the spars.
2
5
3.3Assembling the yarn stand
–
–
321
Insert yarn support tube 1 in the holder 2.
Tighten the yarn support tube with both the screws 3.
3.4Assembling the workpiece storage members
315431
The workpiece storage members have been dismantled for the
purpose of transportation.
–
Loosen the screws 2 at the holders 3.
–
Insert holding rods 1 in the holders 3.
–
Retighten the screws 2 at the holders 3.
–
Loosen the screws on the holders 4 and 5 and adjust the height of
the workpiece storage members.
–
Retighten the screws on the holders 4 and 5.
321
6
4Electrical Connection
ATTENTION !
All jobs on the electrical equipment of the sewing unit may be
performed only by qualified electricians or appropriately trained
personnel.
In the process, make sure that the mains plug is pulled out.
4.1Checking the nominal voltage
ATTENTION !
The nominal voltage specified on the rating plate of the sewing unit
control system must correspond to the mains voltage.
Nominal voltage = 190 - 240 V, 50/60 Hz
4.2Establishing the mains connection
–
Connect the mains plug.
2
7
5Pneumatic Connection
For the operation of the pneumatic components, the sewing unit must
be supplied with anhydrous compressed air.
ATTENTION !
For faultless functioning of the pneumatic control operations, the
compressed air network must be designed as follows:
Make sure that a minimum operating pressure of 6baris not
exceeded even when air c onsumption is at its highest.
In the event of excessive compressed air drop:
–
–
Increase the compressor performance.
Increase the diameter of the compressed air supply line.
321
Connect the compressed air maintenance unit
–
Connect the connecting hose 3 to the compressed air network.
Adjust the operating pressure
–
The operating pressure is 6 bar.
It can be read out on the manometer 1.
–
Lift up and tur n the turning handle 2 for adjusting the operating
pressure.
-Turning in clockwise direction = Increase pressure
-Turning in anti-clockwise direction = Reduce pressure
ATTENTION!
The compressed air network may not be used to supply oiled
compressed air.
Behind the filter, purified compressed air is extracted as blow air for
the cleaning of machine parts and for blowing out the sewing parts.
Oil particles that are entrained with the blow air lead to functional
faults and contamination of the sewing parts.
8
6Putting into operation
6.1Sewing test
A sewing test should be performed once the setting up job has ended.
–
Connect the mains plug.
Caution: Risk of Injury!
Switch off the main switch.
Thread the needle and looper thread only when the sewing unit is
switched off.
–
Thread the needle and looper thread
(see operating instructions of the sewing machine head).
–
Switch on the main switch.
The control unit is initialised.
–
Select the sewing programme.
–
Positioning and operating are described in Part 1: Operating
Instructions 1281/5-1.
2
9
Notes:
10
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.