SHOWER DOOR, BASE & BACKWALL INSTALLATION INSTRUCTIONS
IMPORTANT
®
DreamLine
For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer
to your model’s web page on DreamLine.com
reserves the right to alter, modify or redesign products at any time without prior notice.
STEP 1: Shower Base Installation Instructions
STEP 2: Shower Backwall Installation Instructions
STEP 3: Shower Door Installation Instructions
For more information about DreamLine® Shower Doors, Tub Doors & Enclosures, please visit DreamLine.com
SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS
Please review this entire manual before beginning installation
Color options:
--- - White
-22- Biscuit
-88- Black
Double Threshold Shower Base with Corner Drain Configuration
shown as an example
IMPORTANT!
DreamLine® reserves the right to alter, modify or redesign products at any time without prior
notice. For the latest up-to-date technical drawings, manuals, warranty information or additional
details please refer to your model’s web page on DreamLine.com
For more information about DreamLine® products please visitDreamLine.com
1. Prior to installation, examine all boxes and packages for shipping damage and compare the
piece count with your packing slip. After opening all boxes and packages read this introduction
carefully. Check that all of the needed parts are included in the package by checking off the
components on the “Detailed Diagram of Shower Door Components”. If the unit has been
damaged, has a finishing defect, or has missing parts, please contact our customer support
department within 3 business days of the delivery date. Please note that DreamLine® will not
replace any damaged products or missing parts free of charge after 3 business days or if
the product has been installed. Please contact DreamLine® if you have any questions and
please provide an order number, job name or other proof of purchase to help identify the
original order.
2. Install all of the required plumbing and drainage before installing the shower base. Use a
competent and licensed (if required by local code) plumber for all plumbing installation.
3. Shower bases must be installed by a licensed plumber. Please note that you should
consult your local building codes with questions on installation compliance standards.
Building and plumbing codes may vary by location and DreamLine® is not responsible for
code compliance standards for your project.
4. Make sure that prior to the installation the installation surface is leveled and solid and will be
able to support the total weight of the unit. Also make sure the walls are at right angles. While
some adjustment in leveling of the tray is possible, irregular installation surface level or
improper angle of side walls will result in serious problems for your installation. Please note
that some adjustments may be necessary during the installation process.
5. Center drain configurations are centered on the width only. See technical drawing tables
for drain locations.
6. Drain not included with this product. The drain
standard 2” compression fitted drain.
opening
is 3-3/8” in diameter and accepts a
IMPORTANT NOTE:
Dimensions provided are for reference only. Measure the actual shower tray
before installation. This includes overall dimensions and drain location.
Allowed tolerance for center of the drain is +/-1/2".
are at right angles.
Provide a 5”×5” opening in the subfloor for the drain.
The 2” PVC waste pipe should
extend above the surface of the
sub-floor according to the drain
installation instructions and the
height of the Shower base.
Refer to the product drawings and
tables in this installation manual for
the drain location.
cement-sand mix, etc.) Concrete or plaster is not recommended.
Apply enough bedding material
to support the entire bottom of
the shower base. This will add
additional stability and prevent the
base from shifting position.
poured and
shower base into the position with the
drain assembly sliding over the PVC
waste pipe. It will be necessary to push
the shower base until the top of the tile
flange aligns with the marks drawn on
the studs and the front edge is
contacting the rough floor along the
entire length of the shower base. Ensure
that the base is level in all directions.
You may need to use shims to hold the
tray level until the bedding fully sets.
Remove all excess mortar.
See Fig. 7 for details.
before
it sets, place the
7. Allow the bedding material to completely harden before applying weight to the bottom of the
shower base.
Install the cement board (or the wallboard) above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the cement board leaving 1/8” gap between
the bottom of the tile or wall kit and the shower base. Use caulk to fill the gap.
See Fig. 8 and Fig. 9 for details.
BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls:
wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use
non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners.
Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use
with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent
soap buildup and water spots (Hard water can etch the surface of the glass over time if left to
dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that
contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the
surface.
HARDWARE: To ensure a long lasting finish: wipe off the metal parts after each use with a soft
cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If
accidentally used, rinse the surface as soon as possible to prevent damage to the finish
(peeling or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with
a soft cloth.
Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or
polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive
sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces.
NOTE: To maximize the life of your door, it is important to regularly inspect the glass
and other hardware for misalignment, proper attachment, and/or damage. Contact
DreamLine with any questions or concerns.
SLIMLINE SHOWER BASE manual Ver 5 Rev 9 03/2018
TEL: 866-731-2244
FAX: 866-857-3638
DREAMLINE.COM
For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com
QWALL – 5.2 (2 Back Panels)
S
W
Support@BathAuthority.com
HOWER ACRYLIC
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
ALL INSTALLATION INSTRUCTIONS
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to your model’s web page on BathAuthority.com
Please read these instructions carefully before installing. If you have any questions
regarding installation, please contact our technical support specialists Monday through
Friday 8:00 AM – 7:00 PM EST at Phone: 1-866-731-2244, Fax: 1-866-857-3638 or
e-mail our technical support group at
1. Prior to installation, examine all boxes and packages for shipping damage and compare
the piece count with your packing slip. After opening all boxes and packages read this
introduction carefully. Check that all of the needed parts are included in the package by
checking off the components on the “Detailed Diagram of Acrylic Shower Wall
Components”. If the unit has been damaged, has a finishing defect, or has missing parts,
please contact our customer support department within 3 business days of the delivery
date. Please note that DreamLineTM will not replace any damaged products or missing
parts free of charge after 3 business days or if the product has been installed. Feel
free to contact DreamLineTM if you have any questions, and please provide an order
number, job name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions about
installation compliance standards. Building and plumbing codes may vary by
location, and DreamLine is not responsible for code compliance standards for your
project.
3. This acrylic wall system is specially designed to be installed over any solid surface. If you
are installing the acrylic walls over existing tiles, remove all loose tiles before the
installation. If you are installing over existing painted walls, remove any loose paint.
Please, note that some cutting and drilling may be necessary during the installation
process.
4. Make sure to turn off the water supply, remove faucet, handles or any fixture trims
protruding from the wall. Clean the surface, removing any soap film and dirt from all wall
surfaces using regular household detergent, and then wipe dry.
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the
detailed diagram and packing list in your manual as a reference. Before discarding the carton,
check for small hardware bags that may have fallen to the bottom of the box. If any parts are
damaged or missing, please contact DreamLineTM for replacement. The shipping boxes may
contain extra parts not used in your model configuration.
NOTE: Retain these installation instructions for future reference.
Width of the Back Panel has to be less than or
equal to the distance between the center line
and the corner line on the back wall in Step. 3
L
W/2
If the width of the Back Panel is greater than the
distance between the center line and the corner
line on the back wall in Step. 3, you have to trim
the Back Panel to fit your measurement.
See Fig. 5 for details.
Fig. 5
6. Measure from the narrow edge of the
Back panel (09) and place a mark at a
distance of "W/2" (that you measured
in Step. 3),
From this mark, draw a straight line
from top to bottom along the wide
edge of the Back panel.
plywood or particle board. Use a sharp industrial
knife and a T-square to score along the marked side
ends of the Back panel and continue scoring until
you have fully cut through the panel.
panel fits behind the corner
cover and cannot be trimmed.
b) The wide edge of the Side
panel can be trimmed to the
size of your measurements
from Step. 8.
Measure from the narrow edge of
the Side panel and place a mark
at a distance of "D" (that you
measured in Step. 8).
Draw a straight line from top to
bottom along the wide edge of
the Side panel.
See Fig. 11 for details.
Fig. 11
10. Place the Side panel (01) on a flat piece of plywood
or particle board. Use a sharp industrial knife and a Tsquare to score along the marked wide ends of the
Side panel and continue scoring until you have fully
cut through the panel.
Acrylic Back Panel and Side Panel Installation Instruction
1
2
3
4
Ø5/16"
1
2
14. Attach the Center cover (10)
vertically at the center point along
the line (from Step. 3) and mark the
drilling holes through the predrilled
holes in the Center cover.
Drill the holes using Ø5/16” drill bit
and insert the Wall Anchors (06).
See Fig. 17 for details.
15. Mount the Center cover (10) to the centerline of the
back wall using the Countersunk screws ST4.2×40 (07). Do not fully tighten the screws at this time; leave
them loose for further installation.
the corner of the shower and mark
the drilling holes through the
predrilled holes in the Corner cover.
Move aside the Corner cover,
Drill the holes using Ø5/16” drill
bit and insert the Wall Anchors(06).
18. Slide the right edge of the left Back panel (09) all the way
behind the Center cover (10) and push the Back panel against
the wall.
Slide the left edge of the right Back panel (09) all the way
behind the Center cover (10) and push the Back panel against
the wall as well.
You can adjust the position of the Back panels before the
sealant sets.
Apply equal pressure to the whole surface of the Back panels
from top to bottom.
panel (01) behind the Corner
cover (02).
Align trimmed edge of the Side
panel (from Step. 9) with the
marked line on the wall (in Step. 7)
and push the Side panel against
the wall.
NOTE:
Make sure the drilled holes on the
Side panel are also aligned with
the fixtures on the wall.
See Fig. 27 for details.
22. Apply sealant to the entire surface of
the reverse side of the other Side panel (01).
See Fig. 26 for details.
Slide the narrow edge of the other
Side panel (01) behind the Corner
cover (02).
Align trimmed edge of the Side panel
(from Step. 9) with the marked line on
the wall (in Step. 7) and push the Side panel against the wall.
Align the top of both Side panels and
the Back panel before the sealant sets.
Apply equal pressure to the whole
surface of the Acrylic panels from top
to bottom.
ATTENTION;
Prior to the next step, please be sure the part of the
wall for installation of the Decorative edge molding
(03) is clean, dry and free from soap, oil and any
construction debris.
25. Gently remove the plastic tape from the adhesive side
of the Decorative edge molding (03) and firmly press
it to the edge of the Side panel (01) from top to
bottom.
See Fig. 31 for details.
Fig. 31
26. Apply caulk along the top edges of
the Side panels (01) and the Back panels (09).
Apply caulk along the connection of
the bottom edges of the Side
panels and bottom edges of the
Back panels with the Shower base.
See Fig. 32 for details.
ATTENTION:
Installation of your “QWALL-5”
Acrylic shower wall is complete.
If you want to install Glass shelves (05) to your Shower, follow to the
next step.
29.Mount the Shelf brackets (04) to the wall using the
Countersunk screws ST4.2×40 (07).
NOTE: the padded set screw of the Glass bracket should be
facing down.
Slide the upper Glass shelf (05) into the upper Shelf
brackets and tighten the set screws at the bottom of the
brackets. Then slide the bottom Glass shelf in place. Tighten
the set screws on the bottom Shelf brackets as well.
To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft
cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never
use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
Acrylic cleaning procedure:
Acrylic should be cleaned with warm water and a clean, non-abrasive cloth. If desired, a
mild, non-abrasive detergent may also be used. Use only light pressure when cleaning.
Avoid rubbing dirt or grit into the surface. Turn the cloth often and replace with a clean
cloth frequently. Dry by blotting gently with a clean, dry cloth.
DO NOT USE:
Window cleaning sprays, alcohol, kitchen abrasive compounds, or solvents (such as acetone,
gasoline, or thinners). Do not use ammonia based cleaning solutions on the acrylic as it will
damage the surface.
How do you get scratches out of Acrylic?
For light scratches, use a buffing compound such as a car wax. Use a buffer or lightly polish
the surface by hand until scratches disappear.
TABLE OF CONTENTS
Required Tools for Installation …………………………………………………… Page: 2
Detailed Diagram with Packing List …………………………………………… Page: 3
Preparation for installation of Back Panel (09) ………………...………. Pages: 4 – 7
Preparation for installation of Side Panel (01) …..………………….…. Pages: 8 – 14
Back Panel and Side Panel Installation Instruction ………………….. Pages: 14 – 19
Glass Shelf (05) Installation Instruction ……….…………………………… Pages: 20 – 21
DreamLine
For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer
to your model’s web page on DreamLine.com
reserves the right to alter, modify or redesign products at any time without prior notice.
MODEL #s
SHDR-0948720-##
SHDR-0954720-##
SHDR-0960720-##
Right-Hand door installation shown
For more information about DreamLine
INFINITY-Z shower and tub door manual Ver 5 08/2017
®
MODEL #s
SHDR-0960580-##
Shower Doors, Tub Doors & Enclosures, please visit DreamLine.com
Right-Hand door installationLeft-Hand door installation
door
NOTE: This door is reversible for right or left-hand door installation. The right-hand door
installation is shown as an example throughout this manual. For the left–hand door installation,
flip the assembly top to bottom so that the panel is on the right side (see Step #6).
NOTE: This manual will describe the shower door installation. Please follow the same sequence of
installation steps for the tub door installation.
INFINITY-Z shower and tub door manual Ver 5 08/2017
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with the packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the necessary parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a finishing
defect, or has missing parts, please contact our customer support department within 3 business days
of the delivery date. Please note that DreamLine® will not replace any damaged products or
missing parts free of charge after 3 business days or if the product has been installed. Contact
®
DreamLine
purchase to help identify the original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
4. Make sure that prior to beginning the installation, the surfaces are leveled and solid and will be able
to support the total weight of the unit. Also make sure the walls are at right angles. Irregular installation
surface level, radius corners or improper angle of side walls will result in serious problems for your
installation. Note that some adjustments and drilling will be necessary during the installation process.
if you have any questions, and please provide an order number, job name or other proof of
®
is not
5. Protect all primary surfaces of the product during installation. Never set the glass down directly onto
a tile floor. Leave corner protectors in place until necessary to remove them. Always use a piece of
wood or cardboard to protect the bottom edge and corners of the glass prior to and during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model has 1” of adjustment per wall profile for out-of-plumb wall conditions and overall width
within the model size. Confirm the finished opening conditions before proceeding with the installation.
8. This model requires a minumum of 1” of flat threshold space for installation.
9. Professional installation recommended.
NOTE: For models with frosted glass: the textured surface must face the outside of the shower.
NOTE: DO NOT attach the handle to the door glass or the towel bar to the panel glass until
instructed to do so.
DO NOT use the handle or towel bar to lift the glass during installation. This may result in damage
!
to the glass and/or serious injury. Always use an assistant or a professional grade glass suction cup
when handling heavy glass.
INFINITY-Z shower and tub door manual Ver 5 08/2017
proceeding with the installation to be sure
that the correct model size has been
ordered.
Middle
Tip: Prior to installation, cover the
shower/tub drain with tape to prevent
losing screws or small parts.
Tip: Set screw gun clutch to low setting
when installing screws and bolts to
prevent stripping the heads.
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed
diagram and packing list in this manual as a reference. Before discarding the carton, check for small
hardware bags that may have fallen to the bottom of the box. If any parts are damaged or missing,
please contact DreamLine
®
for replacement. The shipping boxes may contain extra parts not used in
your model configuration.
Bottom
W
NOTE: Retain these installation instructions for future reference.
INFINITY-Z shower and tub door manual Ver 5 08/2017
walls at the top (at model height: 58” or 72”), middle
and bottom. The wall profiles will adjust for
out-of-plumb conditions, so use the smallest measurement as the “finished opening”
dimension to determine the finished cut length in
Step #2. (Fig 1)
Top
NOTE: The Top and Bottom Guide Rails (#03)
are shorter than the model size by design. They
have been precut for your model width and are
made to fit between the wall profiles, (not wall to
wall). See the table below:
Model Size
48” (for shower)44-5/8”
54” (for shower)50-5/8”
60” (for shower)56-5/8”
60” (for tub)56-5/8”
Precut
Rail Length
Middle
Bottom
2.Subtract 3-3/8” from your finished opening (W) to
determine the finished cut length for the Top and
Bottom Guide Rails (#03). Cut the Top and Bottom
Guide Rails (#03) to the finished cut length “D”.
Cut from the door end only, (which is the end farthest
from the glass holder hole) and cut each rail to the same
length from the same end (Door end) (Fig 2 and Fig 3)
EXAMPLE: If model size = 48” and finished opening size = 46”
then 46“ (-) 3-3/8” = 42-5/8” finished cut size for top & bottom
rails. This is only an example and the finished cut size will vary
based on the actual finished opening width.
W
cut from
the door
end of
the rail
Fig 1
D
D
Panel end
Door end
Fig 2
TIP: For easier installation into the opening, cut off an extra 1/4”:
have been cut to size, re-install the roller
stopper on both of the Top and Bottom Guide
Rails (#03) on the end that has been cut off (the
door end).
Remove the existing stopper. Mark the drilling
hole at a distance of 3-1/8” from the cut end of
the Top and Bottom Guide Rail (#03).
Drill a new hole using a Ø1/8” drill bit; then
re-secure the stopper with the screw. (Fig 4)
1
3-1/8"
Ø1/8"
2
Fig 4
!
ATTENTION: Do Not drill the Guide Rail
throughout, only through the first layer.
(Bottom Guide Rail shown)
4.Secure the Bottom Guide Rail (#03) and Top Guide Rail (#03) to the Glass Profiles (#01) with
the Round Head Screws ST4.2x25 (#10). (Fig 5)
TIP: For ease of assembly, add some liquid soap, wax or lubricant to the screws prior to
!
attaching the glass profiles to the guide rails. Use a low setting on the power drill to
prevent stripping the screws.
INFINITY-Z shower and tub door manual Ver 5 08/2017
5.Slide the Wall Profiles (#02) all the way onto the Glass Profiles (#01) on both sides. Note that the
holes in the wall profiles are off-center, and should line up with the back side of the frame, in-line with
the groove for the panel glass (Fig 6.1). (Fig 6)
Inside
of
shower
1
23
Fig 6
6. Move the assembled frame into the designated
position on the shower base*, bathtub or
threshold (depending on your installation), and
push the Wall Profiles (#02) tight to the walls to
compensate for any out-of-plumb conditions.
Push the bottom rail down tight to the threshold
and adjust the frame to a vertical position. Confirm
with a level before marking the holes for drilling.
(Fig 7)
!
*NOTE: At this step you can reverse the handing
of the installation by flipping the assembly top to
bottom so that the panel glass installs on the
opposite side.
Fig 7
INFINITY-Z shower and tub door manual Ver 5 08/2017
TIP: Before installing the frame assembly, bring the Door Glass (#04) into the shower
area and lean it safely against the wall, using padding to protect the glass, walls and base.
Be sure the handle holes on the Door Glass (#04) are on the correct side for installation.
The wheel assemblies can be attached prior to setting the glass into the shower.
(see Step#11)
Padding
NOTE: DO NOT install the towel bar or handle onto the glass until instructed to do so.
DO NOT lift the glass using the towel bar or handle. This could result in damage to the glass
!
INFINITY-Z shower and tub door manual Ver 5 08/2017
and/or serious personal injury. Always use an assistant or a professional grade glass suction cup
when handling heavy glass.
7.Use an assistant to hold the assembly in position and mark the holes for drilling on the wall through
the holes in the Glass Profiles (#01) and the Wall Profiles (#02). Gently set the assembled unit aside;
drill the holes using a Ø5/16” drill bit and insert the Wall Anchors (#14).(Fig 9)
1
32
Ø5/16"
Fig 9
8. Apply silicone caulk to the rear surface of the Wall Profiles (#02) and around the holes on the wall.
Also apply silicone caulk under the Bottom Guide Rail (#03). Place the entire shower assembly back
into the designated position and secure it to the walls using the Pan Head Screws ST4.2×55 (#09).
The screws will pass through the larger holes in the Glass Profile (#01) and secure the Wall Profiles (#02) to each wall. (Fig 10)
1
2
3
Note: The screwheads on the ST4.2 x 55 Pan Head
Screws (#09) will pass through the larger holes in the Glass Profiles (#01) and then secure the Wall
Profiles (#02) to each wall.
INFINITY-Z shower and tub door manual Ver 5 08/2017
9.Slide the Stationary Glass (#05) fully into the groove
of the Glass Profile (#01) and then secure the Glass Holders (#16) to the Top and Bottom Guide Rails (#03)
with the Flat Head Screws ST4.2x16 (#12). (Fig 11)
NOTE: Use caution when installing the stationary
!
glass into the frame to prevent damage to the
edges of the glass.
Top rail cut
away to show
detail
Bottom rail
cut away to
show detail
add a bead of
silicone to the
bottom rail (optional)
prior to installing the
stationary glass
Bottom rail
cut away to
show detail
Fig 11
10. Attach the Towel Bar (#18) to the outside of the Stationary Glass (#05). (Fig 12)
INFINITY-Z shower and tub door manual Ver 5 08/2017
11. Fasten the top and the bottom Wheel Assemblies (#17) to the Door Glass (#04). All wheels
should be installed to face the outside of the shower. The door can be adjusted using the adjustable
bolt on the top wheels (Fig. #13.4). The push-button on the bottom wheel should point up, and can be
pressed to release the spring-loaded bottom wheel to assist in installation into the Bottom Guide Rail
(#03). Be sure the handle holes are on the correct side for the installation. (Fig 13)
NOTE: The lock nut of the upper wheel (Fig 13.4) and the push-button on the bottom wheel (Fig 13.1)
should be pointing up for easy access.
!
NOTE: Do not overtighten the wheels.
inside
1
2
inside
4
5
3
6
inside
Fig 13
12. From inside the shower, insert the bottom Wheel Assemblies (#17) into the Bottom Guide Rail
(#03), lift the door up and set the top Wheel Assemblies (#17) into the Top Guide Rail (#03).
Test the operation of the door, and if necessary, use a #2 Phillips screwdriver (do not use a power
screwdriver) to adjust the upper wheels so the door rolls smoothly and the closes tight. (Fig 14)
1423
INFINITY-Z shower and tub door manual Ver 5 08/2017
13.Starting from the bottom, insert the Single Side Strip (#08) into the
groove between the Stationary Glass (#05) and the glass profile using a
wooden or plastic shim. The strip should be inserted from the inside of
the shower. (Fig 15)
ATTENTION: To prevent scratching or
!
damaging the glass and aluminum: Do Not use
a screwdriver or other metal object to install the
Single Side Strip (#08)
inside
Fig 15
14. Install the Handle (#06) to the Door Glass (#04). Press the Anti-Water Strips (#07) onto the
vertical edges of the Stationary Glass (#05) and both vertical edges of the Door Glass (#04). Insert
the Seal Gasket (#15) into the Glass Profile (#01) starting from the bottom (Fig 16.3) (Fig 16)
1
2
3
door
panel
outsideoutsideoutside
Fig 16
TIP: The longer Anti-Water Strips (#07) attach to the edges of the Door Glass (#04).
The shorter strip attaches to the edge of the Stationary Glass (#05).
INFINITY-Z shower and tub door manual Ver 5 08/2017
13
15. Perform the final adjustment of the assembled unit within the Wall Profiles (#02) making sure the
bottom rail is tight to the threshold. Drill Ø1/8”holes in the center of the Wall Profile (#02) into the
Glass Profile (#01). Drill one hole at the top and one hole at the bottom of each profile.
Secure the Wall Profile (#02) to the Glass Profile (#01) using the Round Head Screws ST4.2x10 (#11)
and raised white washers. Cover the exposed scew heads with the Decorative Covers (#13) (Fig 17)
ATTENTION: Do Not drill the profiles throughout, only through the first layer
BASES and BACKWALLS: To ensure long-lasting life for your acrylic back walls, wipe them off
after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream
based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal
brushes or scrapers that could scratch or dull the surface.
GLASS: To ensure long-lasting life for your glass shower products, wipe them off after each use
with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent
soap buildup and water spots (Hard water can etch the surface of the glass over time if left to
dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that
contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the
surface.
HARDWARE: To ensure a long-lasting finish, wipe off the metal parts after each use with a soft
cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If
accidentally used, rinse the surface as soon as possible to prevent damage to the finish (peeling
or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with a soft
cloth.
Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or
polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive
sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces.
NOTE: To maximize the life of your door, it is important to regularly inspect
the glass and all hardware for misalignment, proper attachment, and/or
damage. Contact DreamLine
®
DreamLine
shower doors and enclosures are designed not to leak when
®
with any questions or concerns.
installed properly and the flow of water is not pointed directly at the vinyl
seals.
INFINITY-Z shower and tub door manual Ver 5 08/2017