
AQUA ULTRA
SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS
IMPORTANT!
TM
DreamLine
notice. For the latest up-to-date technical drawings, manuals or any other details please refer
to the support.BathAuthority.com web page.
reserves the right to alter, modify or redesign products at any time without prior
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM – 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support group
at support@BathAuthority.com.
For more information on DreamLineTM Shower Doors & Tub Doors please visit www.BathAuthority.com

Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed
parts are included in the package by marking all the components on the “Detailed Diagram of
Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has
been damaged, has a finishing defect, or is missing parts, please contact our customer support
department within 5 business days of the delivery date. Please note that DreamLineTM will not
replace any damaged products or missing parts free of charge after 5 business days or if the
product has been installed. Feel free to contact DreamLineTM if you have any questions.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine is
not responsible for code compliance standards for your project and will not accept any
returns.
3. If this unit is going to be installed in a new construction, install all of the required plumbing and
drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
4. Prior to installation, ensure that the installation surface is leveled and solid and will be able to
support the total weight of the unit. Also, make sure the walls are at right angles. Irregular
installation surface level or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during the
installation process.
5. This unit must be installed against finished walls and floor.
Instructions are given for the shower door installation. Please, follow the same
instructions to install the tub door.
Tools Required
Waterproof
Tape
Measure Pencil
Phillips
Screwdriver
Drill bit
(Ø=5/16")
Drill bit
(Ø=1/8")
Silicone
Level
“AQUA ULTRA” Rev.2 Ver.1 07/13
Caulk
Gun
Electric
Drill
Hammer
Mallet
Wood
2

Detailed Diagram of Shower and Tub Door Components
7
8
10
11
12
1
5
3
4
6
13
2
Parts List
01 U-Channel 1 (wall profile) 1pc 07 Wall anchor 5pcs
02 U-Channel 2 (bottom profile) 1pc 08 Countersunk screw ST4.2×40 5pc
03 Stationary glass 1pc 10 Countersunk screw ST4.2×25 2pcs
04 Glass door 1pc 11 Side anti-water strip 1pc
05 Support bar 1pc 12 Bottom anti-water strip 1pc
06 Handle 1pc 13 Hinge 2pcs
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using detailed
diagram of shower door components and parts list on this page as a reference. Before discarding the
carton, check for small hardware bags that tend to fall to the bottom of the box. If any parts are
damaged or missing, please contact DreamLineTM for replacement.
NOTE: Retain these installation instructions for future reference.
“AQUA ULTRA” Rev.2 Ver.1 07/13
3

Shower and Tub Door Installation
1. Place the U-Channel 2 (02) onto the
Shower base or Tub. Adjust the U-Channel 2
position in the middle of the ledge.
Mark the drill holes on the ledge through the
predrilled holes in the U-Channel 2 and drill
the holes using Ø1/8” drill bit.
NOTE: If you are installing tub door and
not drilling the holes for U-Channel 2, use
rubbing alcohol to clean the tub ledge of
dirt before applying silicone.
Apply waterproof silicone along the bottom
surface and around the holes of the U-
Channel 2 and fasten it onto the ledge with
the Countersunk screws ST4.2×25 (10).
See Fig. 1 & 2 for details.
Fig. 1
Fig. 2
1
2
4
5
Ø1/8”
“AQUA ULTRA” Rev.2 Ver.1 07/13
4