DreamLine
without prior notice. For the latest up-to-date technical drawings, manuals or any
TM
reserves the right to alter, modify or redesign products at any time
other details please refer to the support.bathauthority.com
web page.
Please carefully read the instructions before installing. If you have any questions
regarding installation, please call our technical support specialists Monday through
Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical
support group at
For more information on DreamLineTM Shower Doors please visit www.BathAuthority.com
Rev 1.1 1
support@BathAuthority.com.
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of
the needed parts are included in the package, by marking all the components on the
“Detailed Diagram of Shower Door Components”. Examine boxes and packages for
shipping damage. If the unit has been damaged, has a finishing defect, or has missing
parts, please contact our customer support department within 3 business days of the
delivery date. Please note that DreamLine TM will not replace any damaged products
or missing parts free of charge after 3 business days or if the product has been
installed. Feel free to contact DreamLineTM if you have any questions.
2. Please note that you should consult your local building codes with questions on
installation compliance standards. Building and plumbing codes may vary by
location, and DreamLine is not responsible for code compliance standards for your
project.
3. Please insure that prior to the installation the installation surface is leveled and solid and
will be able to support the total weight of the unit. Also make sure the walls are at right
angles. While some adjustment in leveling of the door is possible, irregular installation
surface level or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during
the installation process.
4. Please, NOTE! This door has only ½” out-of-plumb adjustment. Make sure your
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the
detailed diagram and packing list in your manual as a reference. Before discarding the
carton, check for small hardware bags that tend to fall to the bottom of the box. If any parts
are damaged or missing, please contact DreamLineTM for replacement.
Rev 1.1 3
Shower Door Installation
1. Measure the distance between two walls.
This distance is marked as “W”.
See Fig. 1 for details.
W
Fig. 1
2. TheUpper guide rail (01) and the Bottom
guide rail (04) has been precut for the
installation between the walls with a distance
of:
a) 48”
If W=48”, then it is unnecessary to cut the
Guide rails and you can continue to Step 3.
If W<48”, you will need to cut:
•Upper guide rail (01) from one end.
D
The cutting length will be D;
D=48”−W.
•Bottom guide rail (04) from both ends.
The cutting length will be D/2.
b) 60”
If W=60”, then it is unnecessary to cut the
Guide rails and you can continue to Step 3.
D
/
2
If W<60”, you will need to cut:
•Upper guide rail (01) from one end.
The cutting length will be D; D=60”−W.
D
/
2
•Bottom guide rail (04) from both ends.
The cutting length will be D/2.
See Fig. 2 for details.
Fig. 2
Rev 1.1 4
3.Secure Upper guide rail (01) and Bottom
guide rail (04) to the Glass profiles (03)
with the Flat head screws ST4.2x25 (09).
See Fig. 3 and Fig. 4 for details.
2
1
3
4
Fig. 3
Fig. 4
Rev 1.1 5
Loading...
+ 10 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.