DreamLine DL-6951C-01CL, SHDR-1248728-01 User Manual

DUET
SHOWER DOOR INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine without prior notice. For the latest up-to-date technical drawings, manuals or any
TM
other details please refer to the support.bathauthority.com
web page.
Please carefully read the instructions before installing. If you have any questions
regarding installation, please call our technical support specialists Monday through Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical support group at
For more information on DreamLineTM Shower Doors please visit www.BathAuthority.com
Rev 1.1 1
support@BathAuthority.com.
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of
the needed parts are included in the package, by marking all the components on the “Detailed Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or has missing parts, please contact our customer support department within 3 business days of the delivery date. Please note that DreamLine TM will not replace any damaged products
or missing parts free of charge after 3 business days or if the product has been installed. Feel free to contact DreamLineTM if you have any questions.
2. Please note that you should consult your local building codes with questions on
installation compliance standards. Building and plumbing codes may vary by location, and DreamLine is not responsible for code compliance standards for your project.
3. Please insure that prior to the installation the installation surface is leveled and solid and
will be able to support the total weight of the unit. Also make sure the walls are at right angles. While some adjustment in leveling of the door is possible, irregular installation surface level or improper angle of side walls will result in serious problems for your installation. Please, note that some adjustments and drilling might be necessary during the installation process.
4. Please, NOTE! This door has only ½” out-of-plumb adjustment. Make sure your
walls are as close to being plumb as possible.
Tools Required
Drill bit
(Ø=5/16")
Miter saw or Hacksaw
Caulk
Level
Tape Measure Pencil
Caulk Gun
Electric Drill
Phillips Screwdriver
Hammer
Rev 1.1 2
Drill bit
(Ø=1/8")
Detailed Diagram of Shower Door Components
1
7 8
9
10
11 12
13 14
5
2
3
6
4
Packing List
01 Upper guide rail 1pc 08 Round head screw ST4.2×16 16pcs 02 Wall profile 2pcs 09 Round head screw ST4.2×30 18pcs 03 Glass profile 2pcs 10 Decorative cover 10pcs 04 Bottom guide rail 1pc 11 Roller 4pcs 05 Glass door 2pcs 12 Handle bracket 4pcs 06 Handle 2pcs 13 Guide block (left, right, middle) 1 set
07 Wall anchor 8pcs 14 Rubber stopper 6pcs
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference. Before discarding the carton, check for small hardware bags that tend to fall to the bottom of the box. If any parts are damaged or missing, please contact DreamLineTM for replacement.
Rev 1.1 3
Shower Door Installation
1. Measure the distance between two walls.
This distance is marked as “W”.
See Fig. 1 for details.
W
Fig. 1
2. The Upper guide rail (01) and the Bottom
guide rail (04) has been precut for the installation between the walls with a distance of:
a) 48”
If W=48”, then it is unnecessary to cut the Guide rails and you can continue to Step 3.
If W<48”, you will need to cut:
Upper guide rail (01) from one end.
D
The cutting length will be D; D=48”−W.
Bottom guide rail (04) from both ends.
The cutting length will be D/2.
b) 60”
If W=60”, then it is unnecessary to cut the Guide rails and you can continue to Step 3.
D
/
2
If W<60”, you will need to cut:
Upper guide rail (01) from one end.
The cutting length will be D; D=60”W.
D
/
2
Bottom guide rail (04) from both ends.
The cutting length will be D/2.
See Fig. 2 for details.
Fig. 2
Rev 1.1 4
3. Secure Upper guide rail (01) and Bottom
guide rail (04) to the Glass profiles (03)
with the Flat head screws ST4.2x25 (09).
See Fig. 3 and Fig. 4 for details.
2
1
3
4
Fig. 3
Fig. 4
Rev 1.1 5
Loading...
+ 10 hidden pages