DreamLine
purpose of product improvement and customer experience. Please refer to the model’s web page on
DreamLine.com for the latest technical drawings, installation manuals, warranty information or additional
product details.
reserves the right to alter, modify or redesign products at any time without prior notice for the
exclusive ClearMax
This is a specially formulated coating
that prevents the build up of soap and
water spots.
Install the surface with the ClearMaxTM
label towards the inside of the shower.
Please note that depending on the
model, the glass may be coated on
either one or both surfaces.
For best results, squeegee the glass after
each use and dry with a soft cloth.
Glass technology.
PRISM PLUS with Buttress Shower enclosure manual Ver 1 10/2018
The hinge panel glass must be properly installed and secured to support the
!
IMPORTANT STEPS TO FOLLOW:
◻ Use 100% silicone caulk - a quick-drying or fast-curing silicone is
recommended for the installation of hinge panel glass into the U-Channel
◻ Apply enough silicone into the U-Channels to secure the panel glass
◻ Fully tighten the L-Bars™ on the Hinge Panel Glass and the Buttress
Return Panel
◻ DO NOT remove the spacers or shims from beneath the door
glass for at least 24 hours to allow the silicone to fully cure in the
U-Channel holding the hinge panel glass
◻ The hinge panel glass for this model should not be adjusted
more than 1/4” within the U-Channel for an out-of-plumb wall
condition
◻ Refer to the product installation manual for more details
weight of the door glass. Failure to follow these steps may result in the hinge
panel glass pulling out of the U-Channel.
100% Silicone
24
Hours
!
!
PRISM PLUS with Buttress Shower enclosure manual Ver 1 10/2018
NOTE: Leave spacers or shims in place beneath the door glass for 24 hours.
If time allows, delay installing the door glass onto the hinge panel glass for
24 hours until the silicone securing the hinge panel glass has fully cured.
NOTE: This enclosure must be installed at the model size dimensions shown in Table A on
!
page 7. Be sure that the correct size shower enclosure has been ordered to fit the finished
dimensions of the base or threshold that the enclosure will be installed upon.
NOTE: The thickness of the finished wall treatment will affect the alignment of the enclosure
upon the threshold.
Product specifications:
(W1)
40-1/16”
40-1/16”
finished wall surface
finished wall surface
(W2)*
*see note in Step#1
23-13/16
The finished buttress wall
should not be more than
22-3/4” at the widest
point, or less than
22-3/4”, otherwise the
buttress return panel will
either extend over the
edge or not reach the
22-3/4
edge, preventing proper
installation.
40-1/16”
*40-1/16”
22-5/8
From the finished
wall to the outside
edge of the installed
hinge panel glass
Right-hand buttress panel installation shown
PRISM PLUS with Buttress Shower enclosure manual Ver 1 10/2018
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count
with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of
the needed parts are included in the package by checking off the components on the “Detailed Diagram of
Shower Door Components”. If the unit has been damaged, has a finishing defect, or has missing parts, please
contact our customer support department within 3 business days of the delivery date. Please note that
DreamLine® will not replace any damaged products or missing parts free of charge after 3 business
days or if the product has been installed. Feel free to contact DreamLine
please provide an order number, job name or other proof of purchase to help us identify your original order.
®
if you have any questions, and
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing and
drainage before installing the shower. Use a competent and licensed (if required by local code) plumber for
all plumbing installation
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will be able
to support the total weight of the unit. Also make sure the walls are at right angles. Irregular installation
surface level, radius corners or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during the installation
process.
5. Please protect all primary surfaces of the product during installation. Never set your glass down directly
onto a tile floor. Leave corner protectors in place until necessary to remove them. Always use a piece of wood
or cardboard to protect the bottom edge and corners of the glass prior to and during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model has 1/4” of adjustment for out-of-plumb wall conditions within the U-channels.
Verify that the walls are within this tolerance before proceeding with the installation.
®
is not
8. This model requires that you drill into the threshold for proper installation. Contact the
manufacturer of the base or threshold material with any questions regarding the drilling of holes into
their product.
9. This model requires a minimum 1-1/2” of flat level threshold space for installation.
10. Professional installation recommended.
NOTE: DO NOT install the handle onto the door glass until instructed.
!
NOTE: This door is reversible for left or right-swing door installation. The left-swing door installation
is shown as an example throughout this manual. For the right-swing door installation, simply begin
on the opposite wall and reverse the orientation of the steps shown.
DO NOT lift the glass using the handle. This could result in damage to the glass and/or
serious personal injury. Always use an assistant or a professional grade glass suction cup
when handling heavy glass.
silicone recommended
for the installation of
hinge panels.
Tape
Measure
Soft-Head
Hammer
Razor Knife
Pencil
MalletWood
Work Gloves
Phillips
Screwdriver
Block
Drill bit
(Ø5/16")
Carpenter’s
Square
Safety Glasses
Drill bit
(Ø1/8")
Professional-grade
Glass suction cup
*The Buttress return panel
glass location will be
aligned after the door glass
is installed.
Power
Drill
W2*
Tip: Measure the finished opening before
proceeding with the installation to be sure
that the correct model size has been
ordered.
Note: W1 and W2 dimensions are
measured from the finished corner
of the walls to the outside edge
of the installed wall profiles.
Right-hand buttress panel installation shown
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed
diagram and packing list in this manual as a reference. Before discarding the carton, check for small
hardware bags that may have fallen to the bottom of the box. If any parts are damaged or missing,
please contact DreamLine
your model configuration.
®
for replacement. The shipping boxes may contain extra parts not used in
W1
NOTE: Retain these installation instructions for future reference.