DreamLine
For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer
to your model’s web page on DreamLine.com
reserves the right to alter, modify or redesign products at any time without prior notice.
STEP 1: Shower Base Installation Instructions
STEP 2: Shower Backwall Installation Instructions
For more information about DreamLine® Shower Doors, Tub Doors & Enclosures, please visit DreamLine.com
SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS
Please review this entire manual before beginning installation
Color options:
--- - White
-22- Biscuit
-88- Black
Double Threshold Shower Base with Corner Drain Configuration
shown as an example
IMPORTANT!
DreamLine® reserves the right to alter, modify or redesign products at any time without prior
notice. For the latest up-to-date technical drawings, manuals, warranty information or additional
details please refer to your model’s web page on DreamLine.com
For more information about DreamLine® products please visitDreamLine.com
1. Prior to installation, examine all boxes and packages for shipping damage and compare the
piece count with your packing slip. After opening all boxes and packages read this introduction
carefully. Check that all of the needed parts are included in the package by checking off the
components on the “Detailed Diagram of Shower Door Components”. If the unit has been
damaged, has a finishing defect, or has missing parts, please contact our customer support
department within 3 business days of the delivery date. Please note that DreamLine® will not
replace any damaged products or missing parts free of charge after 3 business days or if
the product has been installed. Please contact DreamLine® if you have any questions and
please provide an order number, job name or other proof of purchase to help identify the
original order.
2. Install all of the required plumbing and drainage before installing the shower base. Use a
competent and licensed (if required by local code) plumber for all plumbing installation.
3. Shower bases must be installed by a licensed plumber. Please note that you should
consult your local building codes with questions on installation compliance standards.
Building and plumbing codes may vary by location and DreamLine® is not responsible for
code compliance standards for your project.
4. Make sure that prior to the installation the installation surface is leveled and solid and will be
able to support the total weight of the unit. Also make sure the walls are at right angles. While
some adjustment in leveling of the tray is possible, irregular installation surface level or
improper angle of side walls will result in serious problems for your installation. Please note
that some adjustments may be necessary during the installation process.
5. Center drain configurations are centered on the width only. See technical drawing tables
for drain locations.
6. Drain not included with this product. The drain
standard 2” compression fitted drain.
opening
is 3-3/8” in diameter and accepts a
IMPORTANT NOTE:
Dimensions provided are for reference only. Measure the actual shower tray
before installation. This includes overall dimensions and drain location.
Allowed tolerance for center of the drain is +/-1/2".
are at right angles.
Provide a 5”×5” opening in the subfloor for the drain.
The 2” PVC waste pipe should
extend above the surface of the
sub-floor according to the drain
installation instructions and the
height of the Shower base.
Refer to the product drawings and
tables in this installation manual for
the drain location.
cement-sand mix, etc.) Concrete or plaster is not recommended.
Apply enough bedding material
to support the entire bottom of
the shower base. This will add
additional stability and prevent the
base from shifting position.
poured and
shower base into the position with the
drain assembly sliding over the PVC
waste pipe. It will be necessary to push
the shower base until the top of the tile
flange aligns with the marks drawn on
the studs and the front edge is
contacting the rough floor along the
entire length of the shower base. Ensure
that the base is level in all directions.
You may need to use shims to hold the
tray level until the bedding fully sets.
Remove all excess mortar.
See Fig. 7 for details.
before
it sets, place the
7. Allow the bedding material to completely harden before applying weight to the bottom of the
shower base.
Install the cement board (or the wallboard) above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the cement board leaving 1/8” gap between
the bottom of the tile or wall kit and the shower base. Use caulk to fill the gap.
See Fig. 8 and Fig. 9 for details.
BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls:
wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use
non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners.
Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use
with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent
soap buildup and water spots (Hard water can etch the surface of the glass over time if left to
dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that
contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the
surface.
HARDWARE: To ensure a long lasting finish: wipe off the metal parts after each use with a soft
cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If
accidentally used, rinse the surface as soon as possible to prevent damage to the finish
(peeling or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with
a soft cloth.
Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or
polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive
sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces.
NOTE: To maximize the life of your door, it is important to regularly inspect the glass
and other hardware for misalignment, proper attachment, and/or damage. Contact
DreamLine with any questions or concerns.
SLIMLINE SHOWER BASE manual Ver 5 Rev 9 03/2018
Page 21
TEL: 866-731-2244
FAX: 866-857-3638
DREAMLINE.COM
For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com
Page 22
QWALL – 4
A
W
CRYLIC SHOWER
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
ALL INSTALLATION INSTRUCTIONS
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to your model’s web page on BathAuthority.com
Please read these instructions carefully before installing. If you have any questions
regarding installation, please contact our technical support specialists Monday through
Friday 8:00 AM – 7:00 PM EST at Phone: 1-866-731-2244, Fax: 1-866-857-3638 or
e-mail our technical support group at Support@BathAuthority.com
For more information on DreamLineTM Shower Back Wallplease visit www.BathAuthority.com
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 23
2
Preparation
Caulk
Tape
MeasurePencil
Screwdriver
Phillips
(Ø 5/16")
Drill bit
Level
Gun
Caulk
Drill
Electric
Hammer
Knife
T-Square
1. Prior to installation, examine all boxes and packages for shipping damage and compare
the piece count with your packing slip. After opening all boxes and packages read this
introduction carefully. Check that all of the needed parts are included in the package by
checking off the components on the “Detailed Diagram of Acrylic Shower Wall
Components”. If the unit has been damaged, has a finishing defect, or has missing parts,
please contact our customer support department within 3 business days of the delivery
date. Please note that DreamLineTM will not replace any damaged products or missing
parts free of charge after 3 business days or if the product has been installed. Feel
free to contact DreamLineTM if you have any questions, and please provide an order
number, job name or other proof of purchase to help us identify your original order.
1. Please note that you should consult your local building codes with questions on
installation compliance standards. Building and plumbing codes may vary by
location, and DreamLine is not responsible for code compliance standards for your
project.
2. This acrylic wall system is specially designed to be installed over any solid surface. If you
are installing the acrylic walls over the existing tiles, remove all loose tiles before the
installation. If you are installing over the existing painted walls, take all loose paint off.
Please, note that some cutting and drilling might be necessary during the installation
process.
3. Make sure to turn off the water supply, remove faucet, handles or any fixture trims
protruding from the wall. Clean the surface removing soap film and dirt from all wall
surfaces using regular household detergent, and then wipe it dry.
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Tools Required
Page 24
3
Detailed Diagram of Acrylic Shower Wall Components
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the
detailed diagram and packing list in your manual as a reference. Before discarding the carton,
check for small hardware bags that may have fallen to the bottom of the box. If any parts are
damaged or missing, please contact DreamLineTM for replacement. The shipping boxes may
contain extra parts not used in your model configuration.
NOTE: Retain these installation instructions for future reference.
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 25
4
Preparation for Installation of Side Panel
If you are installing a shower enclosure with a wall
behind the wall profile.
1"
1"
1
2
1
2
Wall Profile
Side Panel
Wall
Side Panel
Wall Profile
Wall
ATTENTION:
profile, you can hide the edge of the Side panel (01)
See Fig. 1 for details.
1. Place a mark on the walls with a distance
of 1” (one inch) from the corner and draw
a plumb vertical line from top to bottom.
See Fig. 2 for details.
Fig. 1
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Fig. 2
Page 26
5
D1
D2
D1
D1
D2
to cut
Line
to cut
Line
2.Measure the walls of the shower from the
1” (one inch) line in the corner (from
Step. 1) to the points where you want
Side panels (01) to end.
The distances are “D1” and “D2”.
NOTE:
“D2” Shows wall with the fixture.
See Fig. 3 for details.
3. Determine the position of both
Side panels (01).
NOTE:
a) The narrow edge of the Side
panels fits behind the corner
cover and cannot be trimmed.
b) The wide edge of the Side
panel can be trimmed to the
size of your measurements
from step 2.
Measure from the narrow edge of
the Side panel and place a mark
at a distance of “D1” and “D2”
(that you measured in Step 2).
Draw a straight line from top to
bottom along the wide edge of
the Side panel.
See Fig. 4 for details.
Fig. 3
Fig. 4
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 27
6
1
2
D1
D2
4. Place the Side panel (01) on a flat piece of plywood
or particle board. Use a sharp industrial knife and a Tsquare to score along the marked wide ends of the
Side panel and continue scoring until you have fully
cut through the panel.
See Fig. 5 and Fig. 6 for details.
Fig. 5
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Fig. 6
Page 28
7
D2
A
F
E
1"
B
C
D2
F
E
A
B
C
5. Take exact measurements of
the fixture on the wall:
• from the 1” (one inch) line
in the corner of the shower
to the fixture:
(A, B, C)
• from the bottom of the wall
of the shower to the fixture:
(E, F).
See Fig. 7 for details.
6. Determine which Side panel (01) will be installed on
the side wall with the fixture.
Mark the fixture location on the Side panel
according to the measurements taken in Step. 5.
See Fig. 8 for details.
Fig. 7
Fig. 8
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 29
8
1
2
34
Ø5/16"
D2
7. Drill the holes for the fixtures in the Side panel (01) using
the proper diameter saw bit or a handheld jig saw.
See Fig. 9 for details.
Acrylic Side Panel
Installation Instruction
8. Attach the Corner cover (02) to
the corner of the shower and
mark the drilling holes through
the predrilled holes in the
Corner cover.
Move aside the Corner cover,
Drill the holes using Ø5/16” drill
bit and insert the Wall Anchors(06).
See Fig. 10 and Fig. 11 for details.
Fig. 9
Fig. 10
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 30
9
1
2
9. Mount the Corner cover (02) to the corner of the
shower using the Countersunk screws ST4.2×40 (07).
Do not fully tighten the screws at this time; leave them
loose for further installation.
See Fig. 12 and Fig. 13 for details
Fig. 11
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Fig. 12
Page 31
10
10. Apply the sealant to the entire surface of the
reverse side of the Side panel (01).
Also, apply the sealant around the drilled
holes.
See Fig. 14 for details.
Fig. 13
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Fig. 14
Page 32
11
1
2
1
2
Fig
11. Slide the narrow edge of the Side panel
(01) behind the Corner cover (02).
Align trimmed edge of the Side panel
(from Step. 4) with the marked line on the
wall (in Step. 2) and push the Side panel
against the wall.
NOTE:
Make sure the drilled holes on the Side
panel are also aligned with the fixtures on
the wall.
See Fig. 15 for details.
12. Apply sealant to the entire surface of the
reverse side of the other Side panel (01).
See Fig. 14 for details.
13. Slide the narrow edge of the Side panel
(01) behind the Corner cover (02).
Align trimmed edge of the Side panel
(from Step. 4) with the marked line on the
wall (in Step. 2) and push the Side panel
against the wall.
Align the top of both Side panels and the
Back panel before the sealant sets. Apply
equal pressure to the whole surface of the
Acrylic panels from top to bottom.
See Fig. 16 for details.
. 15
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Fig. 16
Page 33
12
1
2
1
2
Side Panel
Wall
Molding
Decorative
Side Panel
Wall
Molding
Decorative
14.Once Side panels (01) aligned, fasten tight the
Corner cover (02) to secure the Side panels.
Cover the screw holes with the Decorative cover
(08).
See Fig. 17 for details.
Fig. 17
ATTENTION;
Prior to the next step, please be sure the part of
the wall for installation of the Decorative edge
molding (03) is clean, dry and free from soap, oil
and any construction debris.
15. Gently remove the plastic tape from the adhesive side
of the Decorative edge molding (03) and firmly
press it to the edge of the Side panel (02) from top
to bottom.
See Fig. 18 for details.
Fig. 18
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 34
13
G
H
Fig. 20
16. Apply caulk along the top edge of the Side
panels (01) and along the connection of
the bottom edges of the Side panels with
the Shower base.
See Fig. 19 for details.
ATTENTION:
Installation of “QWALL-4” Acrylic shower
wall is complete.
If you want to install Glass shelves (05) to
your Shower, follow to the next step.
Glass Shelves Installation Instruction
17. Determine the desired height for the
Glass shelves (05) and mark the
locations on the wall.
NOTE:
The Glass shelves can be installed either
two in one corner, or one in each.
See Fig. 20 for details.
Fig. 19
Fig. 20
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 35
14
1
2
3
3 1/2"
3 1/2"
3 1/2"
Ø 5/16"
1
2
3
Fig
18. Mark the location for the Shelf brackets (04) according to the
measurements in Fig. 20 and Fig. 21.1.
Drill the holes using Ø5/16” drill bit and insert the Wall anchors
(06).
See Fig. 21 for details.
19. Mount the Shelf brackets (04) to the wall using the
Countersunk screws ST4.2×40 (07).
NOTE: the padded set screw of the Glass bracket should be
facing down.
Slide the upper Glass shelf (05) into the upper Shelf brackets and tighten the set screws at the bottom of the
brackets. Then slide the bottom Glass shelf in place. Tighten
the set screws on the bottom Shelf brackets as well.
See Fig. 22 and Fig. 23 for details.
. 21
Fig. 22
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 36
15
Fig. 23
Product maintenance
To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft
cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never
use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
Acrylic cleaning procedure:
Acrylic should be cleaned with warm water and a clean, non-abrasive cloth. If desired, a
mild, non-abrasive detergent may also be used. Use only light pressure when cleaning.
Avoid rubbing dirt or grit into the surface. Turn the cloth often and replace with a clean
cloth frequently. Dry by blotting gently with a clean, dry cloth.
DO NOT USE:
Window cleaning sprays, alcohol, kitchen abrasive compounds, or solvents (such as acetone,
gasoline, or thinners). Do not use ammonia based cleaning solutions on the acrylic as it will
damage the surface.
How do you get scratches out of Acrylic?
For light scratches, use a buffing compound such as a car wax. Use a buffer or lightly polish
the surface by hand until scratches disappear.
Q-Wall 4 manual Ver 1 Rev 2 08/2015
Page 37
16
For more information on DreamLineTM Shower Back Wallplease visit www.BathAuthority.com
Q-Wall 4 manual Ver 1 Rev 2 08/2015
TEL: 866-731-2244
FAX: 866-857-3638
WWW.BATHAUTHORITY.COM
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.