SHOWER DOOR, BASE & BACKWALL INSTALLATION INSTRUCTIONS
IMPORTANT
®
DreamLine
For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer
to your model’s web page on DreamLine.com
reserves the right to alter, modify or redesign products at any time without prior notice.
STEP 1: Shower Base Installation Instructions
STEP 2: Shower Backwall Installation Instructions
STEP 3: Shower Door Installation Instructions
For more information about DreamLine® Shower Doors, Tub Doors & Enclosures, please visit DreamLine.com
SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS
Please review this entire manual before beginning installation
Color options:
--- - White
-22- Biscuit
-88- Black
Double Threshold Shower Base with Corner Drain Configuration
shown as an example
IMPORTANT!
DreamLine® reserves the right to alter, modify or redesign products at any time without prior
notice. For the latest up-to-date technical drawings, manuals, warranty information or additional
details please refer to your model’s web page on DreamLine.com
For more information about DreamLine® products please visitDreamLine.com
1. Prior to installation, examine all boxes and packages for shipping damage and compare the
piece count with your packing slip. After opening all boxes and packages read this introduction
carefully. Check that all of the needed parts are included in the package by checking off the
components on the “Detailed Diagram of Shower Door Components”. If the unit has been
damaged, has a finishing defect, or has missing parts, please contact our customer support
department within 3 business days of the delivery date. Please note that DreamLine® will not
replace any damaged products or missing parts free of charge after 3 business days or if
the product has been installed. Please contact DreamLine® if you have any questions and
please provide an order number, job name or other proof of purchase to help identify the
original order.
2. Install all of the required plumbing and drainage before installing the shower base. Use a
competent and licensed (if required by local code) plumber for all plumbing installation.
3. Shower bases must be installed by a licensed plumber. Please note that you should
consult your local building codes with questions on installation compliance standards.
Building and plumbing codes may vary by location and DreamLine® is not responsible for
code compliance standards for your project.
4. Make sure that prior to the installation the installation surface is leveled and solid and will be
able to support the total weight of the unit. Also make sure the walls are at right angles. While
some adjustment in leveling of the tray is possible, irregular installation surface level or
improper angle of side walls will result in serious problems for your installation. Please note
that some adjustments may be necessary during the installation process.
5. Center drain configurations are centered on the width only. See technical drawing tables
for drain locations.
6. Drain not included with this product. The drain
standard 2” compression fitted drain.
opening
is 3-3/8” in diameter and accepts a
IMPORTANT NOTE:
Dimensions provided are for reference only. Measure the actual shower tray
before installation. This includes overall dimensions and drain location.
Allowed tolerance for center of the drain is +/-1/2".
are at right angles.
Provide a 5”×5” opening in the subfloor for the drain.
The 2” PVC waste pipe should
extend above the surface of the
sub-floor according to the drain
installation instructions and the
height of the Shower base.
Refer to the product drawings and
tables in this installation manual for
the drain location.
cement-sand mix, etc.) Concrete or plaster is not recommended.
Apply enough bedding material
to support the entire bottom of
the shower base. This will add
additional stability and prevent the
base from shifting position.
poured and
shower base into the position with the
drain assembly sliding over the PVC
waste pipe. It will be necessary to push
the shower base until the top of the tile
flange aligns with the marks drawn on
the studs and the front edge is
contacting the rough floor along the
entire length of the shower base. Ensure
that the base is level in all directions.
You may need to use shims to hold the
tray level until the bedding fully sets.
Remove all excess mortar.
See Fig. 7 for details.
before
it sets, place the
7. Allow the bedding material to completely harden before applying weight to the bottom of the
shower base.
Install the cement board (or the wallboard) above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the cement board leaving 1/8” gap between
the bottom of the tile or wall kit and the shower base. Use caulk to fill the gap.
See Fig. 8 and Fig. 9 for details.
BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls:
wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use
non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners.
Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use
with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent
soap buildup and water spots (Hard water can etch the surface of the glass over time if left to
dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that
contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the
surface.
HARDWARE: To ensure a long lasting finish: wipe off the metal parts after each use with a soft
cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If
accidentally used, rinse the surface as soon as possible to prevent damage to the finish
(peeling or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with
a soft cloth.
Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or
polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive
sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces.
NOTE: To maximize the life of your door, it is important to regularly inspect the glass
and other hardware for misalignment, proper attachment, and/or damage. Contact
DreamLine with any questions or concerns.
SLIMLINE SHOWER BASE manual Ver 5 Rev 9 03/2018
TEL: 866-731-2244
FAX: 866-857-3638
DREAMLINE.COM
For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com
QWALL – 5.2 (2 Back Panels)
S
W
Support@BathAuthority.com
HOWER ACRYLIC
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
ALL INSTALLATION INSTRUCTIONS
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to your model’s web page on BathAuthority.com
Please read these instructions carefully before installing. If you have any questions
regarding installation, please contact our technical support specialists Monday through
Friday 8:00 AM – 7:00 PM EST at Phone: 1-866-731-2244, Fax: 1-866-857-3638 or
e-mail our technical support group at
1. Prior to installation, examine all boxes and packages for shipping damage and compare
the piece count with your packing slip. After opening all boxes and packages read this
introduction carefully. Check that all of the needed parts are included in the package by
checking off the components on the “Detailed Diagram of Acrylic Shower Wall
Components”. If the unit has been damaged, has a finishing defect, or has missing parts,
please contact our customer support department within 3 business days of the delivery
date. Please note that DreamLineTM will not replace any damaged products or missing
parts free of charge after 3 business days or if the product has been installed. Feel
free to contact DreamLineTM if you have any questions, and please provide an order
number, job name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions about
installation compliance standards. Building and plumbing codes may vary by
location, and DreamLine is not responsible for code compliance standards for your
project.
3. This acrylic wall system is specially designed to be installed over any solid surface. If you
are installing the acrylic walls over existing tiles, remove all loose tiles before the
installation. If you are installing over existing painted walls, remove any loose paint.
Please, note that some cutting and drilling may be necessary during the installation
process.
4. Make sure to turn off the water supply, remove faucet, handles or any fixture trims
protruding from the wall. Clean the surface, removing any soap film and dirt from all wall
surfaces using regular household detergent, and then wipe dry.
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the
detailed diagram and packing list in your manual as a reference. Before discarding the carton,
check for small hardware bags that may have fallen to the bottom of the box. If any parts are
damaged or missing, please contact DreamLineTM for replacement. The shipping boxes may
contain extra parts not used in your model configuration.
NOTE: Retain these installation instructions for future reference.
Width of the Back Panel has to be less than or
equal to the distance between the center line
and the corner line on the back wall in Step. 3
L
W/2
If the width of the Back Panel is greater than the
distance between the center line and the corner
line on the back wall in Step. 3, you have to trim
the Back Panel to fit your measurement.
See Fig. 5 for details.
Fig. 5
6. Measure from the narrow edge of the
Back panel (09) and place a mark at a
distance of "W/2" (that you measured
in Step. 3),
From this mark, draw a straight line
from top to bottom along the wide
edge of the Back panel.
plywood or particle board. Use a sharp industrial
knife and a T-square to score along the marked side
ends of the Back panel and continue scoring until
you have fully cut through the panel.
panel fits behind the corner
cover and cannot be trimmed.
b) The wide edge of the Side
panel can be trimmed to the
size of your measurements
from Step. 8.
Measure from the narrow edge of
the Side panel and place a mark
at a distance of "D" (that you
measured in Step. 8).
Draw a straight line from top to
bottom along the wide edge of
the Side panel.
See Fig. 11 for details.
Fig. 11
10. Place the Side panel (01) on a flat piece of plywood
or particle board. Use a sharp industrial knife and a Tsquare to score along the marked wide ends of the
Side panel and continue scoring until you have fully
cut through the panel.
Acrylic Back Panel and Side Panel Installation Instruction
1
2
3
4
Ø5/16"
1
2
14. Attach the Center cover (10)
vertically at the center point along
the line (from Step. 3) and mark the
drilling holes through the predrilled
holes in the Center cover.
Drill the holes using Ø5/16” drill bit
and insert the Wall Anchors (06).
See Fig. 17 for details.
15. Mount the Center cover (10) to the centerline of the
back wall using the Countersunk screws ST4.2×40 (07). Do not fully tighten the screws at this time; leave
them loose for further installation.
the corner of the shower and mark
the drilling holes through the
predrilled holes in the Corner cover.
Move aside the Corner cover,
Drill the holes using Ø5/16” drill
bit and insert the Wall Anchors(06).
18. Slide the right edge of the left Back panel (09) all the way
behind the Center cover (10) and push the Back panel against
the wall.
Slide the left edge of the right Back panel (09) all the way
behind the Center cover (10) and push the Back panel against
the wall as well.
You can adjust the position of the Back panels before the
sealant sets.
Apply equal pressure to the whole surface of the Back panels
from top to bottom.
panel (01) behind the Corner
cover (02).
Align trimmed edge of the Side
panel (from Step. 9) with the
marked line on the wall (in Step. 7)
and push the Side panel against
the wall.
NOTE:
Make sure the drilled holes on the
Side panel are also aligned with
the fixtures on the wall.
See Fig. 27 for details.
22. Apply sealant to the entire surface of
the reverse side of the other Side panel (01).
See Fig. 26 for details.
Slide the narrow edge of the other
Side panel (01) behind the Corner
cover (02).
Align trimmed edge of the Side panel
(from Step. 9) with the marked line on
the wall (in Step. 7) and push the Side panel against the wall.
Align the top of both Side panels and
the Back panel before the sealant sets.
Apply equal pressure to the whole
surface of the Acrylic panels from top
to bottom.
ATTENTION;
Prior to the next step, please be sure the part of the
wall for installation of the Decorative edge molding
(03) is clean, dry and free from soap, oil and any
construction debris.
25. Gently remove the plastic tape from the adhesive side
of the Decorative edge molding (03) and firmly press
it to the edge of the Side panel (01) from top to
bottom.
See Fig. 31 for details.
Fig. 31
26. Apply caulk along the top edges of
the Side panels (01) and the Back panels (09).
Apply caulk along the connection of
the bottom edges of the Side
panels and bottom edges of the
Back panels with the Shower base.
See Fig. 32 for details.
ATTENTION:
Installation of your “QWALL-5”
Acrylic shower wall is complete.
If you want to install Glass shelves (05) to your Shower, follow to the
next step.
29.Mount the Shelf brackets (04) to the wall using the
Countersunk screws ST4.2×40 (07).
NOTE: the padded set screw of the Glass bracket should be
facing down.
Slide the upper Glass shelf (05) into the upper Shelf
brackets and tighten the set screws at the bottom of the
brackets. Then slide the bottom Glass shelf in place. Tighten
the set screws on the bottom Shelf brackets as well.
To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft
cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never
use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
Acrylic cleaning procedure:
Acrylic should be cleaned with warm water and a clean, non-abrasive cloth. If desired, a
mild, non-abrasive detergent may also be used. Use only light pressure when cleaning.
Avoid rubbing dirt or grit into the surface. Turn the cloth often and replace with a clean
cloth frequently. Dry by blotting gently with a clean, dry cloth.
DO NOT USE:
Window cleaning sprays, alcohol, kitchen abrasive compounds, or solvents (such as acetone,
gasoline, or thinners). Do not use ammonia based cleaning solutions on the acrylic as it will
damage the surface.
How do you get scratches out of Acrylic?
For light scratches, use a buffing compound such as a car wax. Use a buffer or lightly polish
the surface by hand until scratches disappear.
TABLE OF CONTENTS
Required Tools for Installation …………………………………………………… Page: 2
Detailed Diagram with Packing List …………………………………………… Page: 3
Preparation for installation of Back Panel (09) ………………...………. Pages: 4 – 7
Preparation for installation of Side Panel (01) …..………………….…. Pages: 8 – 14
Back Panel and Side Panel Installation Instruction ………………….. Pages: 14 – 19
Glass Shelf (05) Installation Instruction ……….…………………………… Pages: 20 – 21
DreamLine
For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer
to your model’s web page on DreamLine.com
reserves the right to alter, modify or redesign products at any time without prior notice.
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a finishing
defect, or has missing parts, please contact our customer support department within 3 business
days of the delivery date. Please note that DreamLine® will not replace any damaged products
or missing parts free of charge after 3 business days or if the product has been installed.
®
Contact DreamLine
other proof of purchase to help to identify the original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
not responsible for code compliance standards for your project and will not accept any
returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation
if you have any questions, and please provide an order number, job name or
®
is
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and
will be able to support the total weight of the unit. Also make sure the walls are at right angles.
Irregular installation surface level, radius corners or improper angle of side walls will result in serious
problems for your installation. Please, note that some adjustments and drilling might be necessary
during the installation process.
5. Please protect all primary surfaces of the product during installation. Never set your glass down
directly onto a tile floor. Leave corner protectors in place until necessary to remove them. Always
use a piece of wood or cardboard to protect the bottom edge and corners of the glass prior to and
during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model has 4” of total width adjustment: including 1/2” of adjustment per wall profile for
out-of-plumb wall conditions plus 3” of overall width adjustment with the expanding top and
bottom rails. Be sure that you have ordered the correct model size to fit your finished opening.
8. This model requires a minimum 1-3/8” of flat threshold space for installation.
9. Professional installation recommended.
NOTE: This door is reversible for right or left-hand door installation. See step #4 for details.
The right-hand door installation is shown as an example throughout this manual.
NOTE: DO NOT install the handle onto the door glass until instructed to do so.
DO NOT attempt to lift the glass using the handle. This could result in damage to
!
the glass and/or serious personal injury. Always use an assistant or a professional
grade glass suction cup when handling heavy glass.
proceeding with the installation to be sure
that the correct model size has been
ordered.
Pencil
Power
Drill
Threshold must be level.
Phillips
ScrewdriverRazor Knife
Hammer
Top
Middle
100% Silicone
Tip: Prior to installation, cover the
shower/tub drain with tape to prevent
losing screws or small parts.
Tip: Set screw gun clutch to low setting
when installing screws and bolts to
prevent stripping the heads.
NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed
diagram and packing list in this manual as a reference. Before discarding the carton, check for small
hardware bags that may have fallen to the bottom of the box. If any parts are damaged or missing,
please contact DreamLine
your model configuration.
NOTE: Retain these installation instructions for future reference.
®
for replacement. The shipping boxes may contain extra parts not used in
1. Insert the Top & Bottom Pivot Rails (#15) into the expandable rails of the Stationary panel
Assembly (#02). (Fig 1)
SHDR-22427200-01 and SHDR-22487200-01: Insert the end that is closer to the pivot hole
SHDR-22607200-01: Insert the end that is farthest from the pivot hole
top
outsideinside
outsideinside
insert
this end
bottom
pivot
hole
door
Right hand door installation shown
insert
this end
pivot
hole
pivot
hole
door
23-5/8”
60” model
23-5/8”
42” and 48” model
Fig 1
Be sure to insert the
correct end of the pivot rail
Measure the top and bottom of the door opening and
adjust the Expandable Rails as necessary.
Push the Wall Profiles(#01) tight to the walls to
compensate for up to 1/2” out-of-plumb per wall.
(Fig 7)
Make sure that the Wall
Profiles (#01) are also tight to
!
the threshold and even with
the top of the frame assembly.
the door opening
must be square
Fig 7
8. Check that the frame assembly is plumb
on the wall and even across the threshold.
Mark the position of the Wall Profiles (#01)
on the wall and mark the holes for drilling
through the pre-drilled holes in the wall
profile flanges. (Fig 8)
Drill the holes into the walls using a Ø5/16” (8mm)
drill bit and insert the Wall Anchors (#03). (Fig 9)
1
Ø5/16”
(8mm)
2
10. Apply a bead of silicone to the back of the Wall
Profiles (#01) and the screw holes where the Wall
Profiles (#01) will be installed. Attach the Wall
Profiles (#01) to the wall using the ST4.2 x 40 Truss
Head Screws (#05). Repeat this process for the
NOTE: DO NOT install the handle onto the door glass until instructed.
DO NOT attempt to lift the glass using the handle. This could result in damage to
!
15. Carefully install the Door Glass (#17) onto the Top & Bottom Pivot Hardware (#16).
Make certain that all gaskets are in place to protect the glass. Cover the bolt with the
decorative cap. (Fig 15)
the glass and/or serious personal injury. Always use an assistant or a professional
grade glass suction cup when handling heavy glass.
19.Once all adjustments have been made,drill pilot
holes from inside of the shower into the Top & Bottom
Pivot Rails (#15) through the predrilled holes using an
Ø1/8” drill bit.
1
Ø1/8”
(3mm)
inside
2
inside
NOTE: Do Not drill the rails throughout,
!
only through the first layer.
Secure the Expanding rails using the Round Head Screws ST4.2×10 (#04) and the raised white washers.
Cover the exposed screw heads and washers with the
Decorative Caps (#06). (Fig 19)
screw
decorative cap
washer
12
Ø1/8”
(3mm)
Ø1/8”
(3mm)
20.Make any final adjustments to the Door assembly within
the Wall Profiles (#01). Make sure that the entire assembly
sits tight down onto the threshold.
5
3
ST4.2x10 &
washer
inside
Decorative cap
inside
Fig 19
Ø1/8”
(3mm)
4
inside
6
inside
3
5
ST4.2x10 &
washer
Decorative cap
Fig 20
insideinside
From inside the shower, drill holes near the center of the Wall
Profiles (#01) at the top and bottom of the profile using an
4
Ø1/8” drill bit. (Fig 20.1 and 20.2)
NOTE: Do Not drill the profiles throughout, only
!
through the first layer.
Secure the Door assembly to the Wall profiles (#01) using the
Round head screws ST4.2×10 (#04) and the raised white
washers.
Cover the exposed screw heads and washers with the
6
Decorative Caps (#06). Repeat this step on the strike side wall
profile as well. (Fig 22)
BASES and BACKWALLS: To ensure long-lasting life for your acrylic back walls, wipe them off
after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream
based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal
brushes or scrapers that could scratch or dull the surface.
GLASS: To ensure long-lasting life for your glass shower products, wipe them off after each use
with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent
soap buildup and water spots (Hard water can etch the surface of the glass over time if left to
dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that
contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the
surface.
HARDWARE: To ensure a long-lasting finish, wipe off the metal parts after each use with a soft
cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If
accidentally used, rinse the surface as soon as possible to prevent damage to the finish (peeling
or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with soft cloth.
Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or
polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive
sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces.
NOTE: To maximize the life of your door, it is important to regularly inspect
the glass and all hardware for misalignment, proper attachment, and/or
damage. Contact DreamLine
®
DreamLine
shower doors and enclosures are designed not to leak when
®
with any questions or concerns.
installed properly and the flow of water is not pointed directly at the pivots
or vinyl seals.