Draw-Tite 58386 User Manual

2009 & UP-DODGE RAM 1500, INCLUDING CREWCAB ( USE WITH 30035 KIT )
CAUTION!
Read pages 2-3 of 30035 instructions before starting installation. Failure to do so could result in significant vehicle damage!
IMPORTANT NOTES FOR THIS INSTALLATION:
1. Tube spacer and 4 1/2” carriage bolt used to attach through forward Bed Sill (Row 2).
2. **Rib neck bolts will need to be pulled through access holes in frame with supplied pull wire (see below).
3. Do not drill thru both walls
ROW 1
of frame. Drill only thru wall of frame to which bracket is mounted.
Each base rail must have a bolt in either of the marked center holes. Check for obstructions before drilling.
Front of
Vehicle
ROW 2
Drill through Bed Sill with
17/32” drill.
Open up hole through truck bed only with
1” dia. drill.
Drop tube spacer through hole in truck bed to avoid crushing Bed Sill when torquing 4-1/2” carriage bolt.
ROW 4
ROW 3
28 5/8” Short Box
(Crewcab models (less than
6’ bed) require a Sidewinder
Pinbox Coupler)
30 1/4” Long Box
Measure from Rear Edge of truck bed to rear edge of base rail.
Rear Edge
of Truck
Bed
King Pin Center approx. 1-1/2” forward of axle center.
Use provided(30035 kit) tube spacers and 4-1/2” carriage bolts to attach through Bed Sill
Forward Side Bracket
1/4 2
*
1/4 2
Axle Center
Bed Sill
* Optional weld
pattern
1/4 2 1/4 2
*
CAUTION!
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.
TOWING PRODUCTS does its best to communicate tow vehicle manufacturer changes; however, it is ultimately the responsibility of
the installer to prevent damage due to installation.
z 2008, 2009 , 2013 Cequent Performance
Sheet 1 of 1 58386N 10/24/13 Rev. D
Loading...