Draper VideoConferencing Camera Box User Manual

In-Wall Mounting Box for
GLASS DOOR INSET TYPE
MEPLA 1.00 290.117.93.0084
VideoConferencing
VideoConferencing Camera
Camera Box
Specifi cations—VideoConferencing Camera Box
VideoConferencing Camera Boxes by Draper, Inc., Spiceland, IN. Camera box shall be a fi ve-sided formed steel enclosure with glass door front. Five camera box enclosure panels shall be precision formed and punched from 18 gauge cold rolled steel, with a black powdercoat fi nish. Each camera box shall be provided with four 1¾" wire management knockouts—one each in the side, bottom, and back panels. One cable grommet also provided with each camera box. Front of enclosure shall feature 7/8" fi nishing frame bezel to trim opening in wall. Enclosure will mount to an opening in most walls or panels, and be held fi rmly in position by built-in “Z Clamps.” The VideoConferencing Camera Box may also be screwed to wall studs in any wall thickness. Door of camera box shall be formed of tempered glass, and hinged to allow door to fold down for service or adjustment of enclosed components.The glass is tilted slightly forward to minimize glare. Door protrudes 9½" into room when open. Camera box ships disassembled. Camera Box shall have net weight of 12 lbs & shipping weight of 16 lbs.
Option: Security lock shall secure glass door and keep camera safe. Two keys provided.
Please Mark Appropriate Selections:
Standard Camera Box Camera Box with optional security lock and two keys
by
Typical Wall
wall clamp in corner
Glass Door
(Camera not included)
Dimensions—VideoConferencing Camera Box
knockout
3
4 pl 1
/
4
G
F A
Front View
C
Bottom View
"
8
/
3
2
"
B
Side Elevation
H
D
Dimensions
E
Dimension A (O.D.) 163/8" Dimension B (O.D.) 8 Dimension C (O.D.) 14 Dimension D (O.D.) 6 Dimension E (O.D.) 11" Dimension F (I.D.) 14 Dimension G (I.D.) 6 Dimension H (I.D.) 10 Suggested Rough Opening 7" x 14
PROJECT:
5
/8"
7
/16"
3
/4"
5
/16"
5
/8"
7
/8"
3
/4"
Copyright © 2004 Draper Inc. Form Vid-Conf-CameraBox_Sub04 Print ed in U.S.A.
ARCHITECT:
CONTRACTOR:
SUPPLIER:
DATE: REVISED:
Loading...