Draper LCD Lift Video Projector User Manual

220 Volt Installation/Operating Instructions
LCD Lift Video Projector Lift
These Installation/Operating Instructions are available in the offi cial language of the country where you purchase the product. Please contact your distributor to request a copy. Vous pourriez demander les instructions d’installation et d’opération traduises dans la langue offi cielle du pays ou vous achetez le produit. Veuillez demander à votre distributeur. Die Gebrauchsanweisung für Installation und Konstruktion sind in der offi ziellen Sprache des Landes, indem Sie das Produkt gekauft haben, vorhanden. Fragen Sie die jeweilige Verkaufs-Abteilung.
Caution
Read instructions completely before proceeding. Follow instructions carefully. Installation contrary to instructions
invalidates warranty. Do not obstruct operation of doors or universal (fl at) closure with fi ngers or any object. Serious injury or damage could result. It is not uncommon to overheat the motor during initial installation when setting limits. The motor is thermally protected and will stop working temporarily. DO NOT physically pull the unit down when this occurs. Once it has cooled to a safe temperature, it will begin operating again. LCD Lift is designed to accommodate ceiling suspended equipment. Equipment should not be allowed to rest on doors during operation.
Unit must be installed level (use a carpenter’s level). Perform Pre-Installation Testing Procedures before beginning installation. Unit operates on 220-240 V AC current.
Note: Unit has been thoroughly inspected and tested at factory and found to be operating properly prior to shipment.
Planning
Based on screen location and projector specifi cations, determine proper position for projector installation. Confi rm that there is adequate space available above the ceiling: 49 cm for LCD Lift A; 62 cm for LCD Lift B.
NOTE: Add an additional 2 cm of ceiling space if using ceiling closure panel.
Arrange to provide service access to electrical control box.
As Soon as LCD Lift Arrives:
A. The unit itself B. Bomb bay doors or optional ceiling closure C. Controls D. Optional SMS Low Profi le Mount with Universal Bracket Follow Pre-Installation Testing Procedure.
Pre-Installation Testing Instructions
This LCD Lift was extensively tested and in perfect condition when it left our plant. To make sure that it arrived in the same condition, please use the following procedure to test the unit prior to installation. Draper does not accept back charges for labor. Make sure that this unit is operating satisfactorily before installation.
Danger! The traveling pan can exert over 30 kg of force. Do not insert any body parts or other objects into this unit while power is con nect ed.
Remove the unit from the outer carton. Remove the cover of the electrical box. Pre-wire supplied controls and make sure the switch is in the off position
and plug the unit into a 220V AC outlet. Caution: Do not touch any exposed wires while the unit is plugged in.
Inside the electrical box you will fi nd that a tem po rary plug has been connected to the terminal board. Extend this plug from the box. Replace the electrical box cover so that the cover is held loosely (so as not to crush the wires) in place.
Use the switch to move the traveling pan up and down. Removal of the access panel will allow the observation of this movement. The unit will stop automatically when it reaches the fully up or fully down po si tion. Cycle the unit in both directions until you are satisfi ed the unit is operating properly. If for any reason the unit does not seem to op er ate properly, call Draper, Inc. 765/987-7999. Do not pro ceed with installation. If the unit has been ordered with the remote control option, again verify operation of the unit by use of the hand held transmitter. If for any reason the unit does not seem to operate properly, call Draper, Inc., 765/987-7999. Do not proceed with installation. If the unit is operating satisfactorily, remove and discard the tem po rary plug. Disconnect the switch at the terminal board (terminals #1, #3, and #7). Do not discard this switch. It is to be used as the wall switch.
➉ Replace the cover on the electrical box and proceed with the installation,
referring to instructions supplied.
Hanging Unit
The LCD Lift may be installed in a variety of ways. Typically, it is re cessed above the ceiling and supported by four ½" (12.7 mm) threaded mount ing rods. The bottom of the LCD Lift should be recessed ap prox i mate ly 4 cm above the fi nished ceiling. The threaded rods should pass through mounting holes supplied in each corner and be secured by nuts above and below (see Fig. 1). The unit should then be guy wired or blocked to pre vent swinging. All installations should observe the following guide lines: Installer must ensure that all fasteners and supports are of adequate strength to securely support LCD Lift and projector.
Caution: DO NOT hang from, "ride" or pull down on the unit. This could
create a failure and cause damage and/or injury.
Fastening methods must be suitable for mounting surface, and anchored so vibrations or abusive pulling will not weak en in stal la tion. Unit should be level, with weight shared more or less equally by all four threaded mounting rods.
Bottom of unit must be unobstructed after installation. 31 cm minimum clearance is required below LCD Lift A; 37 cm below LCD Lift B.
Continued on next page
LCD Lift Dimensions
A
C
For 12.7 mm threaded rod
B
D
Bomb bay door assembly standard. Flat ceiling closure panel available.
(supplied by others)
14.3 mm dia.
mounting holes
A
C
Copyright © 2008 Draper Inc. Form LCDLift220V_Inst08 Printed in U.S.A.
A B C D Travel Lift (cm) (cm) (cm) (cm) (cm) Capacity
LCD Lift A 60 45 46 28 29 30 kgs LCD Lift B 73 57 58 41 42 30 kgs
Figure 1
If you encounter diffi culties installing or servicing your LCD Lift, call your dealer or Draper, Inc., Spiceland, Ind., (765) 987-7999; or fax (765) 987-7142.
220V LCD Lift by Draper
9
Access should be provided to electrical control box in case service is required.
Do not use unit to support adjacent ceiling, light fi xtures, etc.Do not complete the ceiling below unit until electrical connections have
been completed and unit has been operated successfully. We recommend safety cables be attached to LCD Lift for added security.
Threaded rod for
unit suspension
Page 2 of 4
Ball chain for
bomb bay doors
Electrical Connections
Unit operates on 220-240V AC, 50 Hz. current. Opening electrical control box exposes terminals for fi eld con nec tions. Unit is shipped with internal wiring complete and control switch(es) boxed. Wire con nect ing unit to switch(es) and to power supply should be furnished by in stall er. Con nec tions should be made in accordance with wiring di a gram, and wiring should com ply with national and local elec tri cal codes. All op er at ing switches should be “off” before power is con nect ed. LCD Lift should be operated and checked prior to installing bomb bay doors, universal (fl at) ceiling closure or projector.
Operation
When unit is fi rst operated, be cautious. If doors or closure panel do not begin to open mo men tari ly when switch is fl ipped “down”, return switch to “off ” and free doors and/or recheck electrical con nec tions before pro ceed ing. Cycle unit down and up several times to confi rm satisfactory operation. 220 V Single Sta tion Control (CE Approved)—3-position UP-OFF-DOWN switch per mits op er a tion to be stopped at any point. Factory set limit switch es au to mat i cal ly stop lift when fully down or fully up.
220 V Multiple Station Control (Not CE Approved)—Switches are similar in ap pear ance to Single Station Control. Lift stops when switch is re leased and may be re start ed in either direction. Factory set limit switches stop lift au to mat i cal ly when fully up or fully down.
24 V Control (CE Approved)—Three-button UP-STOP-DOWN switches stop at any point desired, operate in any sequence. Factory set limit switch es au to mat i cal ly stop lift when fully up or fully down. Wire less con trols—whether infrared or radio fre quen cy—interface with low voltage control box.
Key Operated Switching (Not CE Approved)—Two kinds of key-operated switches are op tion al ly available with this unit. The key-operated power supply switch controls power to the lift and switches. When it is “off”, the switches will not op er ate lift. Key may be removed from the switch in “on” or “off” position. A three-position key switch permits the lift to be op er at ed directly by key. In this case, the lift’s operator must have a key.
If your LCD Lift is equipped with an optional ceiling closure system, it can be used as is, or in conjunction with a piece of existing ceiling tile. If installing with ceiling tile, you may need to cut tile so that its overall dimensions are the same as (or slightly less than) the closure panel. Place tile into trim frame. Lay closure panel on top (back side) of ceiling tile, and tighten screws to hold in place. If installing large closure, attach brackets to bottom of projector plate (see drawing at right).
Attach 5/16" threaded rods to slots in projector plate or brackets. ➃ Run unit “up” until bottom pan stops at highest position. Mark po si tion on
5
pan if convenient).
Run unit “down” until bottom pan stops at “show” position. Attach closure to lower end of 5/16" rods by slipping into four corner slots
and secure with nuts above and below slots. Run unit “up” again to highest position. Measure distance by which panel fails to reach required “closed” height for sur round ing ceil ing. Run unit “down” then re-adjust mounting of 5/16" rods in traveling grid to raise panel required distance.
Test unit operation to confi rm that panel will stop in closed position just before touching ceiling.
could create a failure and cause damage and/or injury. NOTE: Immediately upon completion of the surrounding ceiling, unit should
be operated to confi rm that optional ceiling closure panel stops just short of touching ceiling in closed position.
Threaded rod to
ceiling closure panel
Universal Closure Bomb Bay Doors
Figure 2
Installing Optional Ceiling Closure
/16" rods even with ceiling level and cut rods to length (removing from
Caution: Make sure nuts are completely tightened.
Caution: DO NOT hang from, "ride" or pull down on the unit. This
LCD Lift—Required Space Above Ceiling
LCD Lift A LCD Lift B Bomb Bay Closure (cm) 47 60 Universal (Flat) Ceiling Closure (cm) 49 62
Installing Bomb Bay Door Closure
Attach closure to LCD Lift frame with factory supplied hardware. Bomb bay doors should be hanging straight down. Lower unit until traveling pan is approximately 10 cm above its lowest position. Install supplied ball chain to connectors attached to the eye bolts threaded into angles on traveling pan (See Fig. 2).
Install ball chain to connectors attached to bomb bay doors. Raise unit to highest position. Doors should close com plete ly. If the doors do not close completely, lower unit and adjust the eye bolts until
doors close completely. Once “closed” position has been accomplished, lock eye bolts into place with hex jam nuts. Adjust the LCD Lift to the height of the fi n ished ceiling.
www.draperinc.com
Figure 3
(765) 987-799
220V LCD Lift by Draper
9
Installing Projector
The video projector should be suspended from the trav el ing pan ac cord ing to projector manufacturer’s instructions or using optional SMS Low Profi le Mount, and using rec om mend ed standard ceiling mounting hardware (“Z” brackets are attached to bottom side of traveling pan for easier installation).
If SMS Low Profi le is used, remove aluminum adaptor bracket from LCD Lift. Use SMS Low Profi le to mark hole locations on aluminum adaptor bracket, drill holes, attach SMS Low Profi le Mount, then slide adaptor bracket, with SMS Low Profi le Mount attached, back into Z brackets.
NOTE: Draper Inc. provides an optional aluminum adaptor bracket or an optional mount for your projector. Please consult the instruction sheet packed with the adaptor bracket for installation information.
The LCD Lift has a grounded 220-240V AC, 50Hz outlet for pro jec tor power supply. Power is supplied to this outlet when unit is in “fully down” po si tion. An AC current sensor has been factory installed and will not allow the projector to rise into the LCD Lift until the pro jec tor has been cooled by its ventilation fan(s). When the fan(s) stop op er at ing, the LCD Lift will raise the projector into its stored position.
Knockouts are provided for passage of signal and control cables.
Unit and projection system should be operated, checked and ad just ed as necessary at this time.
Warning: Keep fi ngers and other objects away from automatic doors and traveling pan when unit is operating. Serious injury or damage could result.
Dimensions of Traveling Pan
A
C
45 cm
C
B
67 mm
35 mm
67 mm
Z brackets and
adaptor plate for
mounting projector.
35 mm
A B C LCD Lift A 46 cm 32 cm 3 mm LCD Lift B 58 cm 45 cm 5 cm
SMS Low Profi le with Universal Bracket
124 mm
Page 3 of 4
A
Yellow/ Green
Duplex Outlet Switched on only in the fully down position
White
Black
Receptacle Limit Switch LS1 NO
Black
Receptacle Lmt switch (LS4) NC
Down Travel Limit Switch LS2 NC
Wiring Diagram—Single Station Control
Motor
Black - Down
Red - Up
White - Neutral
Capacitor
Black
Black
BlackBlack
Red
Red
Red
White
White
White
1 2 3 4 5
Yellow
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TB2
Yellow/ Green
Red
Black
Up Travel Limit Switch LS3 NC
Red
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
White
Black
Black
Black
AC Current Sensor
Red
Yellow
Black Black
TB1
Red - Up
5
Black - Common
6 7
Yellow - Down
Wall Switch
Black
5A
Black
5A
White
Yellow/ Green
SPDT Center Off
TB1
1
2
3
Dashed wiring by electrician
L1
NEU
GND
220 V AC Supply
www.draperinc.com
(765) 987-799
220V LCD Lift by Draper
9
Black
Limit Switch
LS1 NO
Limit Switch
LS2 NC
Black
Receptacle
Receptacle Lmt
switch (LS4)
NC
Down Travel
White
Yellow/
Green
Duplex Outlet
Switched on only in
the fully down position
TB2
Wiring Diagram—
IR or RF Remote Control
Yellow/
Green
Page 4 of 4
Red
Up Travel
Limit Switch
LS3 NC
1 2 3 4 5
Sensor
AC Current
BlackBlack
Black
Black
Red
Red
White
White
Black
Black
Black Black
Ye l l o w
Red
Black
Red
White
Black
Low voltage wiring by others
Dashed wiring by electrician
Yellow/
Green
Capacitor
3
White
5A
White
2
Black - Down
Red - Up
White - Neutral
1 2 3 4 5 6 7 8 9 10
Black
1
5A
TB1
Motor
1 2 3 4 5 6 7 8 9 10
Red
Ye l l o w
Black
7
TB1
5
6
GND
L1
NEU
220 V AC
Supply
www.draperinc.com
Wiring for Remote
Mounting of LVC.
Hot
220V AC
Supply
Neut
Yellow
Black
White
Green-Ground
(765) 987-799
Brown
Red
Splice
Aux Por t for connecting additional
LVC-III modules (up to six total-
connect from Aux to Eye)
UP - Red
3 Button Wall Switch
DOWN - Black
COM - White
Eye Port for IR Eye, RF Receiver or LED
Switch. If more than one of these three is
used with one LVC-III, a splitter is required.
Loading...