Dräger Babyleo TN500 Cleaning Manual

How to clean the Dräger Babyleo TN500
Cleaning in 5 steps
Please complete all cleaning practices according to your hospital‘s guidelines. This document is for informational purposes only. Refer to the instructions for use
!
Prerequisites: There is no patient in the device.
of the device for full disassembly, cleaning and disinfecting instructions.
Starting the automatic humidifier cleaning:
1
• Open the hood.
• On the Main menu touch the
Special procedures
• Open the
• Touch the rotary knob.
• Wait until the humidifier cleaning is complete. This can take up to 60 minutes. Do not disassemble the device during cleaning.
• Switch off the device and let it cool
before continuing.
Surface disinfection cleaning for:
3 4
• Each part removed during disassembly.
• Hood and access panels from inside and outside.
• X-ray flap air ducts (1): clean by pulling a piece of cloth soaked in disinfectant through each duct.
Humidifier cleaning
On
...
tab.
button and confirm with
Please turn the page for assembling and dissambling.
Machine cleaning and thermal disinfection for:
• grommets
• fan impeller
!
1)
5
• Display, main column, trolley, handles and all outer parts.
• Drawer from outside and inside including insert piece.
Only use disinfectants as listed in the instructions for use. Make sure no liquid penetrates into the device.
Ensure all surfaces are dry before using for therapy.
91 03 697 | 17.02-1 | Marketing Communications | HQ | © 2016 Drägerwerk AG & Co. KGaA
Disassembly
Open the hood and
1
remove frame seals from both sides.
Fasten the seals on the
12 11 10 9
edges of the hood and ensure the seals are correctly positioned.
Disconnect heated mattress*
5
and scale* cables and remove mattress. Or simply remove SoftBed.
Open front and side
2 3 4
access panels.
Close front and side access panels.
Remove the mattress tray.
6 7 8
Step 1, 3, 4 and 5, please turn the page
Remove hose grommets on the sensor wall and on the front access panel (6 pieces total).
Insert hose grommets on the sensor wall and front access panel (6 pieces total).
Raise the x-ray tray and pull it out.
Remove the 2 mini-walls at both ends of the mattress tray.
Insert the 2 mini-walls at both ends of the mattress tray.
Remove the bed support.
Place mattress on the
8 7 6 5
mattress tray. Pull heated mattress* and scale* cables through grommets and plug into sensor wall.
Remove the T-bars.
9
Attach the T-bars.
4 3 2 1
* Option
Fit the mattress tray in place.
Remove the small cover
10
for the warm air duct.
Insert the small cover for the warm air duct.
Slide in the x-ray tray and
close x-ray tray aps.
Remove the large cover for
11 12
the warm air duct.
Insert the large cover for the warm air duct.
Fit the bed support and push it over the T-bars.
Raise and remove the fan impeller.
Insert the fan impeller. Ensure that it is tightly pressed down and clicks into position.
Assembly
Loading...