Dovre 350 Installation Instructions Manual

Dovre 350 Cast Iron
Cleanburn Wood Stove
INSTALLATION INSTRUCTIONS
32
INTRODUCTION TO YOUR DOVRE STOVE Page 2
UNPACKING Page 3
GETTING THE BEST FROM YOUR STOVE Page 3
LOCATION FOR THE INSTALLATION Page 3
ASSEMBLY Page 4
INSTALLATION Page 4
CHIMNEY CONNECTIONS Page 4-5
THE CHIMNEY Page 5-6
OPERATING YOUR DOVRE STOVE Page 6
SERVICING & MAINTENANCE Page 6-7
GUIDE TO BURNING WOOD Page 7
TROUBLE-SHOOTING Page 7
WARRANTY DETAILS Page 7
Dovre 350 Cast Iron Cleanburn Wood Stove
Installation and Operating Manual
These instructions should be read
carefully and saved by the
user for future reference
We would like to thank you for purchasing a Dovre stove and we trust that it will provide you with many years of useful service.
At Dovre we have been producing cast iron stoves for over 60 years and we strive to ensure that our products meet with the highest level of performance, efficiency, safety and quality. So much so that we guarantee all Dovre body castings for 10 years.
Owning a stove might be a new experience for you. Therefore, to ensure that you get the best performance from your new Dovre, do please take a little time to read through this manual.
The 350 CB is a specially designed stove for burning wood with clean emissions. It is essential that when wood is used, it is well seasoned for a minimum of 2 years and has maximum moisture content of 20%. If unseasoned wood is used, heat outputs will not be obtained and serious damage will occur in the chimney and flueways.
The dimensions of your new stove are illustrated in fig.
1. Be careful to ensure that your fireplace is going to accept the appliance and that you have allowed for at least 225mm of hearth space in front of the stove.
WE DO RECOMMEND THAT WHEREVER POSSIBLE, YOUR DOVRE IS FITTED BY AN EXPERIENCED INSTALLER ACCUSTOMED TO THE INSTALLATION OF CLASS 1 SOLID FUEL BURNING APPLIANCES.
If you are unsure about any aspect of the installation or operation procedures, your Dovre dealer will be pleased to help.
It is important that the Installation is carried out in compliance with current Building Regulations.
Your Dovre 350 CB is constructed from high-grade quality cast iron and is therefore not light in weight. We recommend that two people are available to handle the unit.
Before taking your Dovre to its installation location, remove the outer packing. Open the appliance door.
Remove the following components:
Ashpan
Fixings pack
Cast iron grate centre
Ash rake
Log guard (part no. 770210)
Check that the following parts are in the Fixings Pack.
1 Tub 400 gm Fire Cement
Cast Iron Flue Spigot (part number 003260)
1 Plain Blanking Plate (part number 153160)
1 steel blanking plate 180mm x 20mm retaining bar .
Cast iron ash pit cover (part no 054020)
4 Leg extensions (part number 522110)
Log Guard 77 020
Operating Tool (part number SLT5/01)
Pack containing over plate remover and instruction sheet. (Part number 72301.0)
Miscellaneous fixing pack including fixing screws and door handle
Quality control ticket (IMPORTANT TO RETAIN TICKET IN CASE OF FUTURE CLAIMS)
Assemble the handle referring to fig.2 below
UNPACKING YOUR DOVRE 350CB
CONTENTS
DOVRE 350CB
FIG.1. STOVE DIMENSIONS FIG.3 SOOT DOOR LOCATIONFIG.2 HANDLE ASSEMBLY
INTRODUCTION TO YOUR NEW
GETTING THE BEST FROM YOUR DOVRE 250
There are 4 golden rules to follow:
USE GOOD FUEL - NEVER BURN UNSEASONED OR DAMP WOOD
YOU MUST HAVE A GOOD CHIMNEY DRAUGHT - NEVER USE YOUR DOVRE STOVE WITH A POOR CHIMNEY
AVOID OPERATING THE STOVE FOR LONG PERIODS ON CONTINUOUS LOW TEMPERATURE
NEVER USE SOLID FUEL ON YOUR DOVRE 350CB
4
3
2
1
The location in which your stove is to be installed will of course depend on the chimney available. If you do not have a chimney, there are a number of prefabricated flue systems available and your Dovre Dealer will be pleased to offer guidance on the subject.
Building Regulations must be observed when considering the location of your Dovre. More precise information can be found later in this manual but it is important to ensure that a suitable hearth, complying with Building Regulations, is available.
NEVER ALLOW A MECHANICAL AIR EXTRACTOR TO BE USED IN THE ROOM OR ADJOINING ROOMS AS THIS COULD CAUSE THE APPLIANCE TO EMIT SMOKE INTO THE ROOM.
LOCATION FOR THE INSTALLATION
It is essential that an access point for cleaning the chimney be incorporated in the installation. This can normally be carried out by fitting an external soot door or access plate in the flue pipe. Access for rear flue connections can be made using a tee section soot trap at the base of the flue pipe. See fig.3 below.
Your 350CB is equipped with a special top baffle plate designed to direct pre-heated secondary combustion air. It is essential that access be allowed for cleaning the topside of the baffle.
IMPORTANT - FLUE CLEANING
REAR FLUE CONNECTION TOP FLUE CONNECTION
SOOT DOOR
SOOT DOOR
SOOT DOOR
435
350
580
685
465
150
Loading...
+ 3 hidden pages