02 Positioning recommendations
07 Components
10 Zones of protection
11 Pre-wall installation
12 Installation
22 Data and standards
26 Product overview
32 Checklists
Culturing Life
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Application
APPLICATION
Types of rain
Cold-water mist spray
Shower zone lights
Ambiance lights
720
90
1110 - 1290300
The recommended hight for the rotary knoband the hand shower set on the wall is 1200 mm measured from the finished
floor lever (FFL) for a person with a height of 1750 mm. The recommended distance in height between the display switch
is 300 mm. All measurements can be varied and customized according to the specific needs of the application. The horizontal and vertical distance between the control elements is 90 mm (center to center) and must not be less. The distance
between the maximum height of the tallest user and underside of the rain panel should be at least 400 mm.
Dornbracht Sensory Sky
ATT
Planning guide Page 2/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Types of rain
Application
TYPES OF RAIN
Cold-water mist spray
Shower zone lights
Ambiance lights
Dornbracht Sensory Sky
Head sprayBody sprayRain curtain
ATT
Planning guide Page 3/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Application
Types of rain
COLD-WATER MIST SPRAY
Shower zone lights
Ambiance lights
Cold-water mist spray
Dornbracht Sensory Sky
ATT
Planning guide Page 4/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Shower zone lights
Application
Types of rain
Cold-water mist spray
SHOWER ZONE LIGHTS
Ambiance lights
Dornbracht Sensory Sky
ATT
Planning guide Page 5/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Ambiance lights
Application
Types of rain
Cold-water mist spray
Shower zone lights
AMBIANCE LIGHTS
Dornbracht Sensory Sky
ATT
Planning guide Page 6/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
EXPOSED TRIM PARTS INSTALLATION
Concealed rough parts installation
Peripheral Equipment
Pre-wall installation
Exposed trim parts installation
Rain panel control
and distribution unit
+ shower board
+ lighting frame
Hand shower set +
eVALV E
Control element
display switch
Control element
rotary knob
Dornbracht Sensory Sky
ATT
Planning guide Page 7/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
Exposed trim parts installation
CONCEALED ROUGH PARTS INSTALLATION
Peripheral Equipment
Pre-wall installation
Concealed rough parts installation
Ceiling installation
enclosure for rain panel
Concealed rough parts
fo r eVA LVE
Concealed rough
parts for electronic
control elements
Dornbracht Sensory Sky
ATT
Planning guide Page 8/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
Exposed trim parts installation
Concealed rough parts installation
PERIPHERAL EQUIPMENT
Pre-wall installation
Peripheral Equipment
1 3
1 3
1 3
B6
FI
1
1
1
ON
ON
ON
2
2
2
OFF
OFF
OFF
2 4
2 4
2 4
1 2 1 23 4
12 V
12 V
12 V
120R
5 A
5 A
5 A
The fragrance modules must not
be installed directly above the
electrical installation.
Sub-distribution board
internal dimensions
min. 500 x 50 0
Fragrance modules
1000 x 210 x 140
overall dimensions
Positioning fragrance module (accessible)
– The fragrance modules must be installed outside the wet zone in an area that allows for easy access after installation.
– Ambient temperature 5-30 °C.
– The maximum distance between fragrance modules and ceiling installation enclosure for rain panel is 12 m.
– The maximum vertical height between fragrance modules and ceiling installation enclosure for rain panel is 4 m and must not be exceeded.
– The maximum distance between the fragrance modules and the closest heat source (e.g. steam generator, heating unit) must
not be less than 1 m. A heat shield has to be installed between the heat source and the fragrance modules if the required
distance of min. 1 m cannot be adhered to. The area needs to be well ventilated.
– The fragrance modules and the power supply have to be installed separate from each other.
(Distance: min. 1 m - the power supply cables can be extended on site to max. 2 m). The fragrance modules must not be installed
directly above the electrical installation.
Dornbracht Sensory Sky
ATT
Planning guide Page 9/38
Positioning
recommendations
Components
ZONES OF
PROTECTION
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Zones of protection
3
– DIN VDE 0100, PART 701 compliant safety zones. Please conform to national statutory regulations, where different.
– The power supply has to be installed outside of safety zone 2 in a sub-distribution board.
– The protection rating of the individual components has to be noted during installation and is only valid when installed
correctly.
– Control elements, hand shower set and rain panel are operated through safety extra-low voltage (SELV)
and can be installed inside safety zone 1.
Dornbracht Sensory Sky
12
ATT
Planning guide Page 10/38
Positioning
recommendations
Components
Zones of protection
PRE-WALL INSTALLATION
Installation
Data and standards
Product overview
Checklists
Pre-wall installation
An installation with a pre-wall system in front of the wall and under the ceiling is mandatory due to the minimum
installation depth and the installation method of the concealed rough parts for electronic control elements. The proper
installation of a pre-wall system enables compliance with on-site requirements with fire protection, heat and noise
insulation. Pre-wall installation systems are available from various manufacturers.
Dornbracht Sensory Sky
ATT
Planning guide Page 11/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
CONCEALED ROUGH PARTS
RAIN PANEL + HAND SHOWER SET
Water installation
Water installation - schema
Electrical installation
Concealed rough parts
rain panel + hand shower set
Electrical installation - schema
Installation pre-wall
Cutouts / anchoring points
Trim installation
The concealed rough parts for
electronic control elements are
mounted to the pre-wall at a later
time.
The ceiling installation enclosure for rain panel
has to be installed by 2 persons.
ATT
There must be sufficient structural load tolerance for the permanent fixing of SENSORY SKY
There is no means of attachment for ceiling installation included among the items supplied. The structural engineer must
choose the means of attachment for the ceiling construction. M8 threaded bolts are used for connection to the ceiling
(min. strength: 2000 N).
Dornbracht Sensory Sky
ATT
Planning guide Page 12/38
(total weight: 60 kg).