02 Positioning recommendations
07 Components
10 Zones of protection
11 Pre-wall installation
12 Installation
22 Data and standards
26 Product overview
32 Checklists
Culturing Life
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Application
APPLICATION
Types of rain
Cold-water mist spray
Shower zone lights
Ambiance lights
720
90
1110 - 1290300
The recommended hight for the rotary knoband the hand shower set on the wall is 1200 mm measured from the finished
floor lever (FFL) for a person with a height of 1750 mm. The recommended distance in height between the display switch
is 300 mm. All measurements can be varied and customized according to the specific needs of the application. The horizontal and vertical distance between the control elements is 90 mm (center to center) and must not be less. The distance
between the maximum height of the tallest user and underside of the rain panel should be at least 400 mm.
Dornbracht Sensory Sky
ATT
Planning guide Page 2/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Types of rain
Application
TYPES OF RAIN
Cold-water mist spray
Shower zone lights
Ambiance lights
Dornbracht Sensory Sky
Head sprayBody sprayRain curtain
ATT
Planning guide Page 3/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Application
Types of rain
COLD-WATER MIST SPRAY
Shower zone lights
Ambiance lights
Cold-water mist spray
Dornbracht Sensory Sky
ATT
Planning guide Page 4/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Shower zone lights
Application
Types of rain
Cold-water mist spray
SHOWER ZONE LIGHTS
Ambiance lights
Dornbracht Sensory Sky
ATT
Planning guide Page 5/38
POSITIONING
RECOMMENDATIONS
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Ambiance lights
Application
Types of rain
Cold-water mist spray
Shower zone lights
AMBIANCE LIGHTS
Dornbracht Sensory Sky
ATT
Planning guide Page 6/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
EXPOSED TRIM PARTS INSTALLATION
Concealed rough parts installation
Peripheral Equipment
Pre-wall installation
Exposed trim parts installation
Rain panel control
and distribution unit
+ shower board
+ lighting frame
Hand shower set +
eVALV E
Control element
display switch
Control element
rotary knob
Dornbracht Sensory Sky
ATT
Planning guide Page 7/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
Exposed trim parts installation
CONCEALED ROUGH PARTS INSTALLATION
Peripheral Equipment
Pre-wall installation
Concealed rough parts installation
Ceiling installation
enclosure for rain panel
Concealed rough parts
fo r eVA LVE
Concealed rough
parts for electronic
control elements
Dornbracht Sensory Sky
ATT
Planning guide Page 8/38
Positioning
recommendations
COMPONENTS
Zones of protection
Installation
Data and standards
Product overview
Checklists
Exposed trim parts installation
Concealed rough parts installation
PERIPHERAL EQUIPMENT
Pre-wall installation
Peripheral Equipment
1 3
1 3
1 3
B6
FI
1
1
1
ON
ON
ON
2
2
2
OFF
OFF
OFF
2 4
2 4
2 4
1 2 1 23 4
12 V
12 V
12 V
120R
5 A
5 A
5 A
The fragrance modules must not
be installed directly above the
electrical installation.
Sub-distribution board
internal dimensions
min. 500 x 50 0
Fragrance modules
1000 x 210 x 140
overall dimensions
Positioning fragrance module (accessible)
– The fragrance modules must be installed outside the wet zone in an area that allows for easy access after installation.
– Ambient temperature 5-30 °C.
– The maximum distance between fragrance modules and ceiling installation enclosure for rain panel is 12 m.
– The maximum vertical height between fragrance modules and ceiling installation enclosure for rain panel is 4 m and must not be exceeded.
– The maximum distance between the fragrance modules and the closest heat source (e.g. steam generator, heating unit) must
not be less than 1 m. A heat shield has to be installed between the heat source and the fragrance modules if the required
distance of min. 1 m cannot be adhered to. The area needs to be well ventilated.
– The fragrance modules and the power supply have to be installed separate from each other.
(Distance: min. 1 m - the power supply cables can be extended on site to max. 2 m). The fragrance modules must not be installed
directly above the electrical installation.
Dornbracht Sensory Sky
ATT
Planning guide Page 9/38
Positioning
recommendations
Components
ZONES OF
PROTECTION
Pre-wall installation
Installation
Data and standards
Product overview
Checklists
Zones of protection
3
– DIN VDE 0100, PART 701 compliant safety zones. Please conform to national statutory regulations, where different.
– The power supply has to be installed outside of safety zone 2 in a sub-distribution board.
– The protection rating of the individual components has to be noted during installation and is only valid when installed
correctly.
– Control elements, hand shower set and rain panel are operated through safety extra-low voltage (SELV)
and can be installed inside safety zone 1.
Dornbracht Sensory Sky
12
ATT
Planning guide Page 10/38
Positioning
recommendations
Components
Zones of protection
PRE-WALL INSTALLATION
Installation
Data and standards
Product overview
Checklists
Pre-wall installation
An installation with a pre-wall system in front of the wall and under the ceiling is mandatory due to the minimum
installation depth and the installation method of the concealed rough parts for electronic control elements. The proper
installation of a pre-wall system enables compliance with on-site requirements with fire protection, heat and noise
insulation. Pre-wall installation systems are available from various manufacturers.
Dornbracht Sensory Sky
ATT
Planning guide Page 11/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
CONCEALED ROUGH PARTS
RAIN PANEL + HAND SHOWER SET
Water installation
Water installation - schema
Electrical installation
Concealed rough parts
rain panel + hand shower set
Electrical installation - schema
Installation pre-wall
Cutouts / anchoring points
Trim installation
The concealed rough parts for
electronic control elements are
mounted to the pre-wall at a later
time.
The ceiling installation enclosure for rain panel
has to be installed by 2 persons.
ATT
There must be sufficient structural load tolerance for the permanent fixing of SENSORY SKY
There is no means of attachment for ceiling installation included among the items supplied. The structural engineer must
choose the means of attachment for the ceiling construction. M8 threaded bolts are used for connection to the ceiling
(min. strength: 2000 N).
Dornbracht Sensory Sky
ATT
Planning guide Page 12/38
(total weight: 60 kg).
Positioning
recommendations
Components
Zones of protection
INSTALLATION
Data and standards
Product overview
Checklists
Pre-wall installation
Water installation
Concealed rough parts rain panel +
Hand shower set
WATER INSTALLATION
Water installation - schema
Electrical installation
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
DN 20
DN 20
min. 900
DN 20 KW
DN 20 WW
DN 15Z
The following components (scope of delivery) have to be positioned to be accessible at all times:
– 4 x Shut off for hot and cold water pipes (DN 20)
– 2 x Filter for hot and cold water pipes (DN 20)
– 2 x Backflow preventer Type BA according to EN 1717 for hot and cold water pipes
- With a circulation pipe, the minimum distance to the eVALVE of the hand shower set must be 900 mm.
- The nominal diameter (DN 20) has to be adhered to for both pipes and fittings.
SEE PLANNING INFORMATION
Dornbracht Sensory Sky
ATT
Planning guide Page 13/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
WATER INSTALLATION - SCHEMA
Electrical installation
Water installation - schema
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
EN 1717
max. 60˚ C
Installation example according to DIN EN 1717. Please conform to national statutory regulations, where different.
Legend (see page 15)
Dornbracht Sensory Sky
ATT
Planning guide Page 14/38
EN 1717
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Legend
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
WATER INSTALLATION - SCHEMA
Electrical installation
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
Main water supply
Main shut off
Water meter
Backflow preventer with drain
Main shut off with gauge
Main water filter (back-flushable)
Pressure reducing valve
Filter
Shut off with drain
Shut off
Drain
Safety valve
Backflow preventer
Thermometer
Circulation pump
Manometer
Backflow preventer Type BA
according to EN 1717
Water installation - schematic page 14
Dornbracht Sensory Sky
ATT
Planning guide Page 15/38
Boiler
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
ELECTRICAL INSTALLATION
Electrical installation
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
Connecting cable
Connecting cable
The installation of the connecting cable and concealed rough
parts for electronic control
elements has to occur at the
same time that the pre-wall is
closed.
2x 12V
Ø 32 mm
max. 12 m
230V/
Signal line
2x Ø 32 mm
max. 1 m
max. 12 m
1 2 1 23 4
12 V
5 A
Ethernet
Ø 32 mm
1 3
1 3
1 3
B6
FI
1
1
1
ON
ON
ON
2
2
2
OFF
OFF
OFF
2 4
2 4
2 4
12 V
12 V
5 A
5 A
3x Fragrance tube
Ø 32 mm
max. 12 m
1 3
1 3
1 3
B6
120R
1 2 1 2 3 4
FI
1
1
1
ON
ON
ON
2
2
2
OFF
OFF
OFF
2 4
2 4
2 4
12 V
12 V
5 A
12 V
5 A
5 A
120R
Please note the individual
cable length (see next page).
Part of the cable and tubing
length is needed to make the
connections. Max. distance
between ceiling installation
enclosure for rain panel and
sub-distribution board: 12 m;
max. distance between the
fragrance modules and
sub-distribution board: 1 m.
– Only connect to the electricity supply when the device is turned off
– The customer must provide the following circuit-breakers and electrical components:
Earth leakage circuit breaker (30 mA, 2-pin, type A), safety cutout (6 A, type B), 3 x circuit breaker (16A, Type 1S)
ATT
– A network outlet according to TIA 568A is necessary to connect SENSORY SKY
to a network.
The local network has to be behind a router with firewall.
– Electrical installation must be carried out by a professional specialist, in accordance with VDE 0100.
– Please conform to national statutory regulations, where different.
SEE PLANNING INFORMATION
Dornbracht Sensory Sky
ATT
Planning guide Page 16/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
Electrical installation
Electrical installation - schema
ELECTRICAL INSTALLATION
- SCHEMA
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
15 m
15 m15 m
15 m
on site
15 m
T
on site
12V5A12V
12V
5A
5A
(to be extended to max. 2m
15 m
1 m
on site)
5 m15 m15 m
0,6 m
7,5 m
0,6 m2 m
0,6 m
The cable length shown here are the delivery status. Cables to be provided on site by the customer are marked as such.
The length of the ductwork for cables has to be shorter (see page 16).
= Connecting cable
= 12 V line
= Equipotential bonding 4 mm²
= Fragrance tube
= Ethernet cable
Dornbracht Sensory Sky
ATT
Planning guide Page 17/38
= 230 V AC line (NYM 3 x 1,5 mm²)
= Signal line fragrance module
= Hot water supply
= Cold water supply
= Terminator
T
min. 185 mm
min. 185 mm
Positioning
recommendations
Components
Zones of protection
INSTALLATION
Data and standards
Product overview
Checklists
Pre-wall installation
Installation pre-wall
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
Electrical installation
max. 140 mm
Electrical installation - schema
INSTALLATION PRE-WALL
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
min. 139 mm
max. 164 mm
min. 7 mm
max. 35 mm
min. 139 mm
1 3
1 3
1 3
B6
FI
1
1
1
ON
ON
ON
2
2
2
OFF
OFF
OFF
2 4
2 4
2 4
1 2 1 23 4
12 V
12 V
12 V
120R
5 A
5 A
5 A
The ceiling installation enclosure for rain panel is to be framed with a metal frame.
Max. distance between mounting bracket of the ceiling installation enclosure for rain panel and the metal frame
of the ceiling structure: 140 mm (center-to-center).
No strain must be transferred from the ceiling structure to ceiling installation enclosure for rain panel.
Dornbracht Sensory Sky
ATT
Planning guide Page 18/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
Electrical installation
Electrical installation - schema
Installation pre-wall
CONCEALED ROUGH PARTS FOR
ELECTRONIC CONTROL ELEMENTS
Cutouts / anchoring points
Trim installation
Concealed rough parts for electronic
control elements
max. 140 mm
The installation of the connecting
cable and concealed rough par ts for
electronic control elements has to
occur at the same time that the
pre-wall is closed. Wall thickness in
front of the wall panelling:
min. 7 mm - max. 35 mm
– The drywall for the ceiling has to meet quality stardard Q3 (no visible gaps and closed pores).
– The on-site panelling has to be screwed to the mounting bracket of the ceiling installation enclosure for rain panel.
– The weight of the panelling of the ceiling must not put any strain on the mounting bracket of the ceiling installation
enclosure for rain panel. The mounting brackets are only meant to stabilize the rain panel.
– It is recommended to use screws with a drill head to install the panelling to the mounting brackets of the rain panel.
– The mounting brackets have to fall in line with the metal frame of the ceiling structure.
– Any strain from the panelling has to be carried by the metal frame of the dry wall.
– The thickness of the wall covering (tile, stone etc.) in front of the dry wall panelling (gypsum cardboard) around the rough
parts for electronic control elements is min. 7 - max 35 mm.
Dornbracht Sensory Sky
ATT
Planning guide Page 19/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
Electrical installation
Cutouts / anchoring points
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
CUTOUTS / ANCHORING POINTS
Trim installation
A
B
102±1
C
740±1
42±1
R max. 6
1
±
42
R max. 3
R max. 6
1
±
1160
A
510±1
1
±
800
150±1300±1
90±190±1
1
±
CB
1
±
42
1110 - 1290300
– Please note the individual cutouts.
– The concealed rough parts for electronic control elements require a
Ø 56 mm in the dry wall panelling.
The concealed rough parts for electronic control elements are covered by tiles/stone and require a hole
of 42 x 42 mm.
Dornbracht Sensory Sky
ATT
Planning guide Page 20/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
INSTALLATION
Data and standards
Product overview
Checklists
Trim installation
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
Electrical installation
Electrical installation - schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
TRIM INSTALLATION
720
24015090
720
740
240
1110 - 1290300
10 mm gap around the edge.
Dornbracht Sensory Sky
ATT
Planning guide Page 21/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Installation
DATA AND STANDARDS
Product overview
Checklists
Planning information
Plumbing
PLANNING INFORMATION
Technical data
PLUMBING
Electrical
Because small quantities of a fragrance are added to the
water emerging from SENSORY SKY
obliged to inform you that the water that emerges from Sensory Sky is not drinking water.
Water supply (HW + CW) 2x DN 20 – G1/2" to be connected via concealed rough for eVALVE (hand shower set).
The pipe diameter has to be adhered to for both pipes and
fittings.
The following components (scope of delivery) have to be
positioned to be accessible at all times:
– 4 x Shut off for hot and cold water pipes (DN 20)
– 2 x Filter for hot and cold water pipes (DN 20)
– 2 x Backflow preventer Type BA according to EN
1717 for hot and cold water pipes
A pressure reducing valve and a main filter have to be provided by the customer (installed after the water meter).
A min. distance for a circulation pipe (DN 15) of 900 mm
from the eVALVE (hand shower set) is required if a hot water
circulation system is installed.
Calculate the piping according to DIN 1988, EN 806.
Pressure test (mandatory) the entire installation up to the
ceiling installation enclosure for rain panel including concealed rough parts for eVALVE (hand shower set) with 1.5
times of the maximum operating pressure.
Please refer to the current pressure test guidelines depending on the pipe material used (e.g. EN 806-4 / DIN 1988-2).
Compile a test report.
The complete installation including the ceiling installation enclosure for rain panel and concealed rough parts for eVALVE
(hand shower set) has to be flushed with clean water, e.g.
EN 806-4 / DIN 1988-2).
Compile a flushing report.
Flushing has to occur prior to installing the trim installation
and initial start-up.
ATT
, we are legally
Hot water storage
For the optimum choice of hot water storage device – taking
into consideration additional drawing-off points and parallel
usage – you need to assess the specific demand (e.g. according to DIN 4708-2).
A thermostatic mixer as to be installed after the boiler if the
hot water temperature of the boiler is set to more than 60 °C.
A manual or automatic bypass if the thermostatic mixer has
be installed if regular thermal disinfection is required.
Continuous-flow water heaters cannot be used to supply
hot water for SENSORY SKY
Floor drain
A specific calculation that takes into consideration the flow
rate of all the outlet points in the shower is required for
optimum floor drain sizing (calculated according to
e.g. DIN 1986).
Recommendation: connected rating 1.5 l/s.,
drainage pipe DN 75.
ATT
.
Application area
The products are not meant to be used outside.
Consult with Dornbracht if you plan to use the product in
steam, chlorine or saline enviroments.
Water hardness
Recommended water hardness: 5-6 °e.
If your water is harder, install a water softening system into
the feed pipes.
Dornbracht Sensory Sky
ATT
Planning guide Page 22/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Installation
DATA AND STANDARDS
Product overview
Checklists
PLANNING INFORMATION
Technical data
Planning information
Electrical
Only connect to the electricity supply when the device is
voltage-free.
Electrical installation must be carried out by a professional
specialist, in accordance with VDE 0100. Please conform to
national statutory regulations, where different.
The installation of the connecting cable and concealed
rough parts for electronic control elements has to occur at
the same time that the pre-wall is closed.
Combine the devices only with original Dornbracht
components.
Space required for all components in the sub-distribution
board: approx. 500 x 500 mm (internal dimensions).
Space required for 3 fragrance modules: 1000 x 210 x 140
(overall dimensions). We recommend installation using xGrid
track art. no. 12 320 970 90
The fragrance modules and the power supply have to be
installed seperate from each other. The fragrance modules
must not be installed directly above the electrical
installation.
See page 16/17 for cable length and length of ductwork.
Part of the cable and tubing length is needed to make the
connections.
The maximum distance between fragrance modules and
ceiling installation enclosure for rain panel is 12 m.
The maximum vertical height between fragrance modules
and ceiling installation enclosure for rain panel is 4 m
and must not be exceeded.
Max. distance between the ceiling installation enclosure for
rain panel and the sub-distribution board: 12 m.
Max. distance between the fragrance modules and the
sub-distribution board: 1 m. Power supply cables can be
extended to max. 2 m on site.
The distance between the fragrance modules and the
closest heat source (e.g. steam generator, heating unit)
must not be less than 1 m.
The customer must provide the following circuit-breakers
and electrical components:
- Earth leakage circuit breaker (30 mA, 2-pin, type A)
- Safety cut-out (6 A, type B).
- 3 x circuit breaker (16A, type 1S)
- Equipotential bonding busbar in subdistribution board
- Equipotential bonding (4 mm²) for concealed rough part
eValve (hand shower set)
Plumbing
ELECTRICAL
The usage and the connection of equipotential bonding
(4 mm²) as shown on page 16 is mandatory. A mere connection to metal piping is not permissable
Dornbracht Sensory Sky
ATT
Planning guide Page 23/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Installation
DATA AND STANDARDS
Product overview
Checklists
Technical data
Planning information
TECHNICAL DATA
PLUMBING
ELECTRICAL
General
Plumbing
Flow at 3 bar flow pressure (max.)
- Head spray 11,7 l/min.
- Body spray 12,2 l/min.
- Rain curtain 12,2 l/min.
- Cold-water mist spray 0,7 l/min.
- Sprays combined 35,7 l/min.
- Hand shower 8,0 l/min.
Flow choreographies
- READJUST(4:50 min.): max. 90 l
- RELEASE (5:00 min.): max. 104 l
- REJOICE (4:35 min.): max. 104 l
Flow pressure
Measuring point: concealed rough parts for eVALVE
(hand shower set)
Minimum flow pressure 2,5 bar
Maximum flow pressure 4,0 bar
Maximum difference in flow
pressure between hot and cold water 1,0 bar
Recommended flow pressure 3,0 bar
Permissible operating temperatures
Measuring point: concealed rough parts for eVALVE
(hand shower set)
Hot-water temperature range 50-60 °C
Thermal disinfection (3-10 min.) 75 °C
Cold-water temperature range 5-20 °C
Anti-scald factory setting 43 °C
Rough-in depth rain panel, control elements, concealed
rough parts for eVALVE see page 18
Electrical
Ceiling installation enclosure for rain panel
Electricity supply (input voltage)
in the sub-distribution board 100-240 V AC
Electricity supply (input voltage)
in the ceiling installation enclosure for rain panel 12 V DC
Input frequency 50-60 Hz
Maximum power consumption 180 W
Output voltage 12 V DC
Output current 3x 5 A
Power consumption (when not in use) < 5 W
Power consumption (in use) 160 W
System of protection IP 54
Equipotential bonding 4 mm²
Installation depth min. 185 mm
Control elements
Display switch + rotary knob
Input voltage 12 V DC
System of protection IP X4
Hole diameter concealed box 56 mm
Installation depth min. 139 mm
Concealed rough parts for eVALVE
(hand shower set)
Input voltage 12 V DC
System of protection IP 66
Equipotential bonding 4 mm²
Installation depth min. 139 mm
max. 164 mm
Fragrance module
Input voltage 230 V AC
Input frequency 50-60 Hz
Maximum power consumption 30,6 W
(for 3 modules)
Dornbracht Sensory Sky
ATT
Planning guide Page 24/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Installation
DATA AND STANDARDS
Product overview
Checklists
Technical data
General
Planning information
TECHNICAL DATA
Plumbing
Electrical
GENERAL
Weight
Rain panel 60 kg
3 tubes fragrance module - rain panel
Length per tube 15 m
Ambient temperature
Max. rain panel 55 °C
Min. rain panel 5 °C
Max. control elements 35 °C
Min. control elements 5 °C
Max. storage 35 °C
Min. storage 5 °C
Max. fragrance module 30 °C
Min. fragrance module 5 °C
Storage dust-free and dry!
To be provided by the customer:
Space required for all components
in the sub-distribution board
(internal dimensions): min. 500 x 500 mm
Space required
for fragrance modules: 1000 x 210 x 140
(overall dimensions)
Earth leakage circuit breaker 30 mA, Type A
Safety cutout 6 A, Type B
3 x circuit breaker 16A Type 1S
Ductwork (for power supply) from
sub-distribution board
to ceiling installation enclosure
for rain panel and concealed rough
part eVALVE (hand shower set)
respectively Ø 32 mm max. 12 m
Ductwork (for ethernet cable) from
sub-distribution board
to ceiling installation enclosure
for rain panel Ø 32 mm max. 12 m
Ductwork (fragrance tubing) from
ceiling installation enclosure
for rain panel to fragrance modules Ø 32 mm max. 12 m
2 x Ductwork (for signal line and power supply)
from sub-distribution board
to fragrance modules Ø 32 mm max. 1 m
Equipotential bonding for ceiling installation
enclosure for concealed rough part
eVALVE (hand shower set) 4 mm²
A pressure reducing valve and main filter to be provided by
the customer (installed after the water meter).
The following components (scope of delivery)
have to be positioned to be accessible at all times:
4 x Shut off for hot and cold water pipes (DN 20)
2 x Filter for hot and cold water pipes (DN 20)
2 x Backflow preventer Type BA according to EN 1717
for hot and cold water pipes
Mark
Self-certification
Dornbracht Sensory Sky
ATT
Planning guide Page 25/38
Positioning
recommendations
Components
Zones of protection
Pre-wall installation
Installation
Data and standards
PRODUCT OVERVIEW
Checklists
ATT
SENSORY SKY
Rain panel
Hand shower set
Control elements
Fragrance modules
Sensory Sky
41 260 979 SENSORY SKYExposed trim parts Brushed stainless steel / platinum matt 41 260 979-89
- Rain panel for ceiling installation (three-piece)
- Complete hand shower set with cover plate
- eVALVE electronic valve for regulating water
temperature and volume
- Electronic control elements (SMART TOOLS)
- Fragrance modules
35 260 970 90 SENSORY SKYConcealed rough parts
- Ceiling installation enclosure for rain panel
- Concealed rough parts for eVALVE (hand shower set)
- Concealed rough parts for electronic control elements (SMART TOOLS)
- 4 x Shut of f for hot and cold water pipes (DN 20)
- 2 x Filter for hot and cold water pipes (DN 20)
- 2 x Backflow preventer Type BA according to EN 1717 for hot and cold water pipes
Brightly polished stainless steel rain panel (85)
Chrome complete hand shower set with cover plate (00)
Chrome electronic control elements (00)
ATT
SENSORY SKY
41 260 979-89:
Brushed stainless steel rain panel (86)
Platinum matt complete hand shower set with cover plate (06)
Electronic control elements platinum matte (06)
- Connecting cable with preinstalled plugs for
concealed rough parts for electronic control elements,
concealed rough parts eVALVE, control module fragrance (1x 15 m, 1x 7,5 m, 1x 5 m, 4x 0,6 m)
Electronic control elements (SMART TOOLS)Exposed trim parts
- 2x Twist-action control elements with electronic control for
temperature and volume, each 60 x 60 mm
- 3x Display switch control elements with electronic control for rain modes,
complete hand shower set, cold-water mist, choreographies,
fragrance and light, each 60 x 60 mm
- Electricity supply: 12 V DC via ceiling installation enclosure for rain panel
- Preset temperature and volume
- Button lock for cleaning
- Pause function
- Update capability
- Service displays
- IP X4
60
60
M 34x1
M 34x1
40
60
10
60
Concealed rough parts for electronic control elements (SMART TOOLS)Concealed rough parts
- 5x Concealed box for pre-wall installation mounting
- 5x Anti-water packing
- Hole diameter 56 mm
- Min. recess depth 75 mm
Concealed rough parts for electronic control elements
(SMART TOOLS)
Use this checklist to verify that you have all the information you need from your SENSORY SKY consultations.
The following items are particularly important:
A pre-wall system is required, recess depth concealed rough parts for eVALVE (hand shower set)
min. 139 mm - max. 164 mm
Suspended ceiling structure, adapted to ceiling installation enclosure for rain panel: min. 185 mm to bottom edge of
the ceiling
Max. distance between mounting bracket of the ceiling installation enclosure for rain panel and the metal frame of the
ceiling structure: 140 mm (center-to-center)
No strain must be transferred from the ceiling structure to ceiling installation enclosure for rain panel
Place the mounting brackets into the correct slot of the installation enclosure depending on the thickness of the
panelling (12.5 or 20 mm)
Use screws with drill head (min. 3.5 x 25 mm) to mount ceiling panelling to the mounting bracket of the installation
enclosure
Fixation material for the ceiling panel has to be chosen based on the ceiling construction. Min. strength: 2000 N
Conform to re protection regulations
Calculate the piping (e.g. according to DIN 1988-3 / EN 806-3)
Calculate optimum choice of hot water storage device (e.g. according to DIN 4708, DIN 1988-20)
A pressure reducing valve to be provided by the customer (installed after the water meter according to DIN 1988)
Main water filter (back-flushable) to be provided by customer (e.g. according to DIN 1988)
The following components (scope of delivery) have to be positioned to be accessible at all times:
– 4 x Shut off for hot and cold water pipes (DN 20)
– 2 x Filter for hot and cold water pipes (DN 20)
– 2 x Backflow preventer Type BA according to EN 1717 for hot and cold water pipes
Hot-water temperature range during operation 50 - 60 °C
Use this checklist to verify that you have all the information you need from your SENSORY SKY consultations.
The following items are particularly important:
Maximum difference in flow pressure between hot and cold water 1.0 bar
Water supply (HW + CW) 2x DN 20 – G1/2" to be connected via concealed rough for eVALVE (hand shower set).
The pipe diameter (DN 20) has to be adhered to for both pipes and fittings
A min. distance for a circulation pipe (DN 15) of 900 mm from the eVALVE (hand shower set) is required if a hot water
circulation system is installed
Leaktest after rough installation according to EN 806-4 / DIN 1988-2
Pipe flushing after rough installation according to EN 806-4 / DIN 1988-2
Calculate optimum floor drain sizing, connected rating 1.5 l/s., drainage pipe DN 75
(calculated according to e.g. DIN 1986)
Use this checklist to verify that you have all the information you need from your SENSORY SKY
The following items are particularly important:
Maximum distance between fragrance modules and ceiling installation enclosure for rain panel: 12 m
Maximum vertical height between fragrance modules and ceiling installation enclosure for rain panel: 4 m
Max. distance between the fragrance modules and the sub-distribution board: 1 m
Max. distance between the ceiling installation enclosure for rain panel and the sub-distribution board: 12 m
The fragrance modules have to installed outside the wet zone in an accessible area. They must not be installed above
the sub-distribution
Space required for frangrance modules: 1000 x 210 x 140 mm (overall dimensions). We recommend installation using
xGrid track art. no. 12 320 970 90
Space required for all components in the sub-distribution board: approx. 500 x 500 mm (internal dimensions)
ATT
The ethernet cable from the SENSORY SKY
to TIA 568A is necessary to connect SENSORY SKY
is to end up in the sub-distribution board. A network outlet according
ATT
to a network. The local network has to be behind a router with
rewall.
The customer must provide ductwork acording to the planning guide
Equipotential bonding 2 x 4 mm² for ceiling installation enclosure for rain panel and concealed rough part eVALVE
(hand shower set) have to be provided by the customer
The total length of all connecting cables (from ceiling installation enclosure for rain panel to concealed rough part eVALVE
to control elements until the control module fragrance in the sub-distribution board) must not be longer than 30 m
Install the terminating resistor on the last element in the loop connected via connecting cables
consultations.
Hole diameter 56 mm for concealed rough parts for electronic control elements
The installation of the connecting cable and concealed rough parts for electronic control elements has to occur at the
same time that the pre-wall is closed
Fasten Connecting cables in the pre-wall (via cable ties) Be sure to leave enough cable in front of cable tie for later
connection
The customer must provide the following circuit-breakers and electrical components
- Earth leakage circuit breaker (30 mA, 2-pin, type A)
- Safety cutout (6 A, type B),
- 3 x circuit breaker (16A, Type 1S)
- Equipotential bonding busbar in subdistribution board
- Equipotential bonding (4 mm²) for concealed rough part eVALVE (hand shower set)
Electrical installation in accordance with VDE 0100. Please conform to national statutory regulations, where different
Use this checklist to verify that you have all the information you need from your SENSORY SKY
The following items are particularly important (details: see planning advice):
Checked installation and level for ceiling installation enclosure for rain panel
Checked connection of suspended ceiling and ceiling installation enclosure for rain panel
Checked fastening and level installation for concealed rough part eVALVE (hand shower set)
Anti-water packing installed
Checked min./ max. rough-in depth for ceiling and wall
ATT
consultations.
Checked water supply lines for hot water, cold water and circulation line (min. distance 900 mm)
Flushed pipes with clean water according to EN 806-4 / DIN 1988-2, wrote ushing report
Checked for leaks according to EN 806-4 / DIN 1988-2, wrote test report
2x back ow preventer DN 20 Type BA according to EN 1717 (1x hot water, 1x cold water) installed in accessible area
Separate cutoff for the hot and cold water pipes installed
Filter for hot and cold water installed
Pressure reducing valve and main filter installed after the water meter
Use this checklist to verify that you have all the information you need from your SENSORY SKY
The following items are particularly important:
Adhered to max. distances and max. vertical height
Installed three power supply units, fragrance control module, DC Filter and AC lter in sub distribution board
ATT
Installed Ethernet cable (coming from SENSORY SKY
) in sub-distribution board
2x power supply cables coming from ceiling installation enclosure for rain panel installed in sub-distribution board
Installed equipotential bonding 2 x 4 mm² for ceiling installation enclosure for rain panel and concealed rough part
eVALVE (hand shower set)
Installed connecting cables between ceiling installation enclosure for rain panel, hand shower set, control elements
and fragrance control module in sub-distribution board
Fastened Connecting cables in the pre-wall (via cable ties)
consultations.
Installed all cables without damage to the cables
ATT
Checked electrical protection for SENSORY SKY
:
- Earth leakage circuit breaker (30 mA, 2-pin, type A)
- Safety cutout (6 A, type B),
- 3 x circuit breaker (16A, Type 1S)
- Equipotential bonding busbar in subdistribution board
- Equipotential bonding (4 mm²) for concealed rough part eVALVE (hand shower set)
Electrical installation in accordance with VDE 0100. Please conform to national statutory regulations, where different
Use this checklist to verify that you have all the information you need for the trim installation and initial start-up of SENSORY SKY
The following items are particularly important:
Flushed pipes prior to trim installation
Checked power supply in sub distribution board
Checked parts supplied for trim installation are complete
Installed product immediately after opening the box
ATT
Installed complete SENSORY SKY
: rain panel, hand shower set, control elements, fragrance modules
ATT
.
Installed fragrance modules in accessible area
Installed power supply cables (NYM 3 x 1.5 mm²) in sub-distribution board
Checked power supply at the fragrance modules (230 V AC)
Checked power supply (output) at the ceiling installation enclosure for rain panel (12 V DC)
Installed the terminating resistor (Terminator) on the last element in the loop connected via connecting cables
(fragrance control unit)
Installed specication label in sub distribution board (e.g. door electrical cabinet)
Installed three power supply units, fragrance control module, DC Filter and AC lter in sub distribution board
ATT
Installed Ethernet cable (coming from SENSORY SKY
) in sub-distribution board
Shutoff for the hot and cold water pipes opened all the way
Turned on power supply
Installed three fragrance bottles, lled pumps manually for start-up until tubes are completely lled (installed reserve