Dixon C2 User Manual

BAND CLAMP TOOL
C2
Jack-type tool
For applying 3/8" and 5/8" width clamps
Operating Instructions for the C2 Installation Tool
1
Pull strapping from carton and cut off. Slide clamp on strap and bend end under at ear side of clamp. Bring opposite end of strap around object twice, each time passing under clamp bridge.
2
3
Slide cutter handle forward for alignment. Jack ball handle to reach desired tension.
4
Retract cutter handle and raise to 90-110°. To cut strapping, rotate cutter handle. Increase locking bend by rotating tool forward. Apply thumb pressure on tab as you remove tool. Bend ears with hammer.
Part Identification for the C2 Installation Tool
For applying 3/8" and 5/8" band clamps
Qty
Per Tool
1 2 2 1 1 1 1 1 1 3 1 1 1 1 1 1 2
Part
Description
Holding dog Puller links Puller links Puller link pin Pulling dog Pulling dog spring Pulling dog pin Ball handle assembly Pusher puller assembly Retaining rings Cutter Crescent ring Cutter handle Holding dog pin Holding dog spring 1/8" x 3/8" roll pin 3/16" x 5/8" roll pin
Part #
C-207 FX-211A FX-211B C-212 FX-214 FA-217 F-233 FA-220 CA-231 F-242 EXP-201 F-232 C-200 F-233 F-217 C-243 C-236
Illustrations are not in correct proportion to one another.
C-207 FX-211A FX-211B C-212
FX-214 FA-217 F-233 FA-220
CA-231 F-242 EXP-201 F-232
C-200 F-233 F-217 C-243
C-236
Sliding Jack Replacement Kit
F205K
(Kit fits the F100, F175 and C2 Tools)
FX-214 FA-217 FX-211A FX-211B
Dixon Valve & Coupling Co.
800 High Street Chestertown, MD 21620
877.963.4966 Fax: 800.283.4966
www.dixonvalve.com
© 2007 DVCC C2 - INHOUSE0407
Loading...