
BAND CLAMP TOOL
C2
Jack-type tool
For applying 3/8" and 5/8" width clamps
Operating Instructions for the C2 Installation Tool
1
Pull strapping from carton and cut off. Slide clamp 
on strap and bend end under at ear side of clamp. 
Bring opposite end of strap around object twice, 
each time passing under clamp bridge.
2
Raise ball handle to forward position and insert 
strapping. Slide tool forward.
3
Slide cutter handle forward for alignment. Jack ball 
handle to reach desired tension.
4
Retract cutter handle and raise to 90-110°. To cut 
strapping, rotate cutter handle. Increase locking 
bend by rotating tool forward. Apply thumb pressure 
on tab as you remove tool. Bend ears with hammer.

Part Identification for the C2 Installation Tool
For applying 3/8" and 5/8" band clamps
Qty
Per Tool
1 
2 
2 
1 
1 
1 
1 
1 
1 
3 
1 
1 
1 
1 
1 
1 
2
Part
Description
Holding dog 
Puller links 
Puller links 
Puller link pin 
Pulling dog 
Pulling dog spring 
Pulling dog pin 
Ball handle assembly 
Pusher puller assembly 
Retaining rings 
Cutter 
Crescent ring 
Cutter handle 
Holding dog pin 
Holding dog spring 
1/8" x 3/8" roll pin 
3/16" x 5/8" roll pin
Part #
C-207 
FX-211A 
FX-211B 
C-212 
FX-214 
FA-217 
F-233 
FA-220 
CA-231 
F-242 
EXP-201 
F-232 
C-200 
F-233 
F-217 
C-243 
C-236
Illustrations are not in correct proportion to one another.
C-207 FX-211A FX-211B C-212
FX-214 FA-217 F-233 FA-220
CA-231 F-242 EXP-201 F-232
C-200 F-233 F-217 C-243
C-236
Sliding Jack Replacement Kit
 F205K
(Kit fits the F100, F175 and C2 Tools)
FX-214 FA-217 FX-211A FX-211B
Dixon Valve & Coupling Co.
800 High Street 
Chestertown, MD 21620
877.963.4966 
Fax: 800.283.4966
www.dixonvalve.com
© 2007 DVCC C2 - INHOUSE0407