25 Ton Ram Operating Instructions
Section 5
Converting from Swaging to Expansion
Dixon Valve & Coupling Company
800 High Street • Chestertown, MD 21620
ph: 800•355•1991 fax: 800 •283•4966
www.dixonvalve.com
25 Ton Ram Instruction Manual Converting from Swaging to Expansion
Before you begin make sure the Ram is fully
retracted. Remove the 25PUSH400
(also referred to as the pusher hat) from the main
pusher plate, if installed on the Ram.
Loosen the keeper plate bolts, and remove all die
holders.
1
2
Install the retaining bolt with washer into hole of
the main Ram pusher plate (25T5).
Laying the 25IXATTACH on it’s side, move the
guide plate to the center. Slide the retaining collar
up until it contacts the guide plate. Tighten the set
screw in the retaining collar.
Stand the 25IXATTACH up so that the end with the
slot is on top.
3
4
customer service 800•355•1991
1Section 5