Important Installation Notes 3
Lift Placement 4
Installation 4
Control Settings 5
Plenum Enclosure Assembly 6
Physical Installation – top mounting 7
Physical Installation – side mounting 9
Connecting Power 11
Projector Mounting 13
Cabling the Lift 13
Ceiling Closure 15
Final Adjustments 17
Specifications 17
Lift Removal 18
Maintenance and Safety 18
Emergency Operation 19
Remote Control Operation and Programming 20
Digital 9 pin Interface Schematics 29
Troubleshooting Chart 30
Warranty 31
Installation Feedback Form 32
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
2
Page 3
IP025-001 V3
IBL Lift Series Installation
Thanks for purchasing a Display Devices lift product. We’re sure your customer will
enjoy this lift for years to come. Our products are designed to be maintenance-free,
saving you future service time. If you experience any difficulties, please contact us at
303-412-0399. Thank you for your support.
Important Installation Notes
Before starting…
Read all instructions before installation.
CAUTION!
The lift is heavy! Take proper safety precautions and get adequate help
when raising the lift.
Leave metal shipping brackets in place to protect you and the lift from damage until
fully and securely mounted.
Ensure the electrical outlet is readily accessible and complies with the lift and projector
specifications for voltages and amperages.
Check above the ceiling for obstructions (i.e. water pipes, wires, cables, duct work,
extreme temperature variations, etc.) before beginning installation.
Ensure the ceiling structure is capable of holding at least four times
weight of the lift and projector. This is a minimum requirement. Follow any local or
state codes that apply to your specific area.
Organize your mounting hardware and have the necessary tools on-hand before
installation.
Attach the projector, ceiling closure system, or other items to the lift only after the lift
has been properly installed and tested.
the combined
CAUTION:
Anytime you are installing or performing maintenance on the
lift, disconnect power at the receptacle or breaker/fuse panel, program the
lift to MANUAL MODE, or activate the NO MOVEMENT switch on the side of
the control box to prevent inadvertent movement of the lift.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
3
Page 4
IP025-001 V3
IBL Lift Series Installation
Lift Placement and Location
Verify the projector’s lens offset from the center of the projector and center the lens
onto the center of the projection screen.
If your lens is offset from the center of the projector, the lift should have the same
opposing offset to center.
Ensure that the centerline of the lens remains aligned with the centerline of the screen.
If your projector does not have a zoom lens, the focal length distance and image size
from screen to lift is critical. See your specific projector manual for detail.
Verify where the front of the projector’s lens is in relationship to the lift, and
compensate accordingly.
INSTALLATION
Mounting hardware is not provided. Be sure to have all your mounting hardware and
tools readily accessible before installation. Consult your local building codes for proper
structural attachment.
Here are the tools you will need:
Safety glasses
Socket set with 7/16” socket wrench
Box wrenches
1/16” hex drive
Philips Head Screwdriver
Adjustable wrench
Magnetic torpedo level (two, if possible)
Ladders or manlift
Genie Lift, or heavy straps and pulleys (for DataLift and DataLite Models)
Knockout kit or hole saw
½” drill and/or ½” hammer drill
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
4
Page 5
IP025-001 V3
x
IBL Lift Series Installation
CONTROL SETTINGS
Prior to the physical installation, you must perform the following steps:
1. Be sure that there is no power attached when setting the DIP switches.
2. Set the DIP switches on the control box before you install the lift in the ceiling.
Refer to the chart below for proper configurations.
3. Dip switches are located under the small access panel on the Control Box
attached to the lift frame. Use a 1/16” hex drive to open.
4. Set the 12-volt trigger and AC Trigger based on your system design.
AC Configuration
DIP Switches
ON OFF
SW1 Aux AC Trigger (see SW2 below) Aux AC Trigger is on all the time
SW2 Aux AC Trigger upon going down Aux AC Trigger at show position
SW3 12V out turns off upon going up 12V out turns off at top position
SW4 12V out turns on upon going down 12V out turns on at show position
OFF
ON
1 2 3 4
Edge of Control Bo
NOTE: Dip Switch SW1: configuration only works in automatic mode.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
5
Page 6
IP025-001 V3
IBL Lift Series Installation
PHYSICAL INSTALLATION
Plenum Enclosure Assembly
This assembly is shipped as a kit. Layout all components as follows and assemble
based on the steps below.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
6
Page 7
IP025-001 V3
IBL Lift Series Installation
PHYSICAL INSTALLATION
TOP-MOUNTING
Top mounting is typically used when installing the lift into a false ceiling (grid tile) or an
exposed unfinished ceiling.
We recommend you install mounting hardware into a structural channel.
Example – Top Mounting
Structural channel provides flexibility for adjusting the lift front-to-rear and side-to-side.
• All hardware should be at leastin 3/8” (M10) diameter.
• You should use angled stabilizers if threaded rods extend 2’ (60 cm) or more
between structural channel and the lift.
• You should also leave the threaded rods slightly loose to ease in alignment and
leveling after installing the lift.
• You need to make sure all hardware is securely tightened at the end of your
installation.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
7
Page 8
IP025-001 V3
IBL Lift Series Installation
PHYSICAL INSTALLATION
TOP-MOUNTING
1.)
2.) Before you begin, be sure the threaded rods have a nut and split washer above
3.) Raise the lift into position and add hardware. Follow the hardware order below
Note:
installation! Use a torpedo or bubble level to level the top frame of the lift. You may
want to use more than one.
Plenum installations
- attach the plenum enclosure to the 8 studs on the lift’s
the lift frame, and a flat washer and nut below the frame. These can be
temporarily held in place with tape or chewing gum.
to ensure stability and accuracy when leveling the lift.
Nut
Flat Washer
Nut
Lock Washer
Flat Washer
IBL Upper lift frame
The following are some of the most important steps in proper lift
1. Level the lift from the rig ht-front to the left-front.
2. Level the lift from left-front to left-rear.
3. Level the lift from left-rear to right-rear.
4. Recheck.
5. Tighten all hardware.
4.) If you are using the plenum enclosure, adjust the height by loosening the (4)
Philips Head Screws, slide the enclosure box to the proper vertical height, and
retighten.
5.) Determine the best location for power, control and signal cables to enter the lift
enclosure. Use a knockout tool or drill holes in the enclosure for cables. We
recommend using flex conduit to the enclosure.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
8
Page 9
IP025-001 V3
g
IBL Lift Series Installation
PHYSICAL INSTALLATION
SIDE-MOUNTING
Side-mounting is typically used when installing the IBL-1522 lift between 16” on-center
floor joists.
NOTE for Retrofit installations with the IBL-1522:
Cut hole opening – 21”l x 14.5”w.
1.) Determine the top height of lift/enclosure and mark the top position on the
joists. Mark the front and rear position of the lift on the joists – both the left and
right sides.
2.) For installations which need the plenum enclosure, attach the plenum enclosure
to the 8 studs on the lift’s upper frame. Add flat washer, split lock washer and
7/16” nuts – tighten. Retrofit installations in sheetrock ceilings often require the
plenum enclosure to be removed.
3.) Determine the best location for power, control and signal cables to enter the lift
enclosure. Use a knockout tool or drill holes in the enclosure for cables. We
recommend using flex conduit to the enclosure.
Mounting Bracket
Mountin
Bracket bolts
4.) Install the four mounting brackets to the floor joists using ¼” x 1 ¼” lag screws
and washers. The brackets mount to the joist.
6.) Raise the lift into position between the mounting brackets. Attach lift to
mounting brackets reinstalling the ¼”x 20 bolts. Do not tighten yet.
NOTE for Retrofit installations: Raise the lift on an angle – get one end of the lift
above the sheetrock, then lift the opposite end up above the ceiling. Level and attach
mounting brackets reinstalling the ¼”x 20 bolts. Do not tighten yet.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
9
Page 10
IP025-001 V3
IBL Lift Series Installation
7.) Be sure the lift is centered left-to-right, then tighten the mounting bracket
hardware.
8.) If you are using the plenum enclosure, adjust the height by loosening the (4)
Philips Head Screws, slide the enclosure box to the proper vertical height, and
retighten.
9.) Raise the enclosure up into and through the ceiling hole. While holding the
enclosure, insert power, signal, and control cables through the access hole you
just made and affix the flex conduit with strain relief/cable clamps. Slide the
enclosure into position and reinstall the (8) bolts to securely hold the enclosure
to the lift.
10.) Install the strain relief/cable clamps in the panels that are knocked out.
• It may be convenient to put the cables through at this time, depending upon the
ceiling’s finish and accessibility.
• Accessibility should not be a problem in a drop-tile ceiling.
• If it is a finished sheetrock or other solid material, you may need to feed the cables
through the cable holes before you reinstall the enclosure.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
10
Page 11
IP025-001 V3
IBL Lift Series Installation
Lift Connections / Connecting Power
1.) Verify voltage at the outlet/power source for the projector/lift. You can now
connect the lift’s power cord to a properly rated electrical circuit in the ceiling
near the lift.
2.) Plug the remote control unit cable into either of the two 9 pin control remote
ports on the side of the control box.
3.) Tighten the cable clamps / strain relief connectors, if required.
4.) If using the 12V trigger and/or AC Trigger, plug in the provided 1/8” mono mini
plug on the sides of the control box at this time. Be sure the cable won’t
interfere with the lift mechanics. Do not use a stereo mini connector (Tip / Ring /
Sleeve).
Be sure the cables will not sag into the lift mechanism during its operation.
5.) You are now ready to cut the tie. Be sure to remove all tie wraps on both sides
of the lift.
6.) After following these precautions, you are now ready to turn on the power switch
on the lift control box.
7.) On the side of the control box, you will find the small black switch labeled NO
MOVEMENT. The lift is shipped from the factory with the NO MOVEMENT swi tch
in the ON position.
8.) Flip the NO MOVEMENT switch to the OFF position. The LED will then blink twice.
If the NO MOVEMENT switch is on, the STATUS LED on the control box and the
remote control will be on solid, not blinking.
9.) Remove the two galvanized metal shipping brackets between the lower and
upper frames on the front and rear of the lift.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
11
Page 12
IP025-001 V3
gg
IBL Lift Series Installation
Caution!
Make sure all tools, cables, and body parts are clear of the lift before pushing
the UP button.
10.) With the hand-held remote control, press the UP button to send the lift to its
fully UP, home position. Refer to the Remote Control Operation and Programming
section for details on how to operate program the lift’s functions.
For this installation, here is a guide to the LEDs on the control box and the remote, and
what the blinking means:
If the LED… It means… Fix it by…
Is Continuously On The NO MOVEMENT switch on
the side of the control box is
activated. This disables all
movement of the lift.
Blinks twice (after unit is
powered up, LED then stops
blinking)
Blinks three times NA NA
Blinks four times Motor is not moving Check the power to the motor
Blinks five times Low AV line voltage Check circuit voltage
Blinks six times Cables off the drum Re-cable the drum(s)
Blinks seven times Lower limit safety switch
The lift is operational
activated
Moving the switch to the OFF
position
or for a mechanical
obstruction on the lift
Follow steps on page 25 of
the remote instructions
Circuit
Breaker
AC Configuration
DIP Switches
AC Input
Remote
Control
Input Ports
No Movement Switch
12VDC Out
Main Power Switch
12VDC In
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
12
AC Tri
er
Page 13
IP025-001 V3
IBL Lift Series Installation
Projector Mounting
1.) The lift is shipped with the projector mounting adapter attached. Remove it from
the lower frame of the lift, if you have not already done so.
2.) Invert your projector and attach the mounting adapter to the bottom of the
projector with the proper hardware.
3.) Find the projector’s center of g r avity using a dowel.
4.) Attach the adapter to the lift with the projector’s center of gravity under the
vertical wire rope of the lift. Use the enclosed ¼”-20 hardware.
Cabling the Lift
The IBL Series lifts accommodates a limited number of cables. We recommend
ExtronTM Superflex Mini HR cable.
signal and / or control cable is not recommended on Display Devices lifts.
Large, bulky cables have too large of a bend radius to allow them to fit in the cable
management clips mounted on the scissor assembly.
Caution
:
Using large diameter RGB and other
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
13
Page 14
IP025-001 V3
IBL Lift Series Installation
Attaching the Cables
1.) Using the hand-held remote, lower the lift down to the MAINTENANCE position.
See the enclosed remote control instructions for information about how to
program this position. The signal, power, and control cables can now be routed
into the cable management clips on sides of the scissor assembly.
2.) The lift is shipped with a sample cable in the clips. Attach your cables in a
likewise manner. Small cable tie wraps are supplied for securing the cables into
the clips.
3.) Carefully route the projector cables starting at the bottom scissor towards the
front of the lift and work towards the top front of the lift. Please note that the
cables alternate inside-to-outside on the scissors. Be careful to avoid
twisting the cable.
NOTE:
It is common practice to keep the signal cables (audio, video, RGB) separate from the
projector power and control cables to prevent signal interference. Utilize the clips on
both sides of the lift for isolation.
4.) Raise the lift to its home position with the UP button (in MANUAL mode) slowly,
carefully, and intermittently. Carefully observe the cables rigged to the sides of
the lift and watch for any problems.
5.) Lower the lift down with the DOWN button again watching for any problems and
ensuring proper overall operation. Repeat this process several times.
6.) If you did not set the 12-volt trigger and AC configuration, revisit Part 1 and set
the Dip Switches for your system design. You are now ready to attach the
ceiling panel closure.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
14
Page 15
IP025-001 V3
IBL Lift Series Installation
Ceiling Closure
1.) If you are using a 2424 model, attach the CTB Sliders to the front and rear of the
lower lift frame. Use ¼-20 hex head bolts, flat washer, split washer and nut.
Do not tighten.
2.) Attach the left and right CTB Brackets to the CTB Sliders using ¼-20 hex head
bolts, flat washer, split washer and nut. Do not tighten.
3.) Determine the length of the threaded rod and cut to length needed. Be sure to
leave the rod long enough to have an airspace between the projector and the
closure panel.
4.) Use the enclosed closure rods. Remove the nylock ¼”-20 nut, washer, spring
and plastic grommet.
5.) Insert the threaded rod into the closure panel mounting points.
6.) Slide the plastic grommet and spring on the threaded rod from the underside of
the threaded rod. Add the washer and compress spring. Replace the ¼”-20
nylock nut and tighten. Do not overtighten.
7.) Insert the ceiling material inside the frame. NOTE: Depending upon the finished
ceiling, you may insert a 3/8” board into the closure frame as a backer board for
the finish material to attach to the underside of the closure frame.
8.) Raise the closure panel to the projector and insert the threaded rods into the 4
mounting points on the lift.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
15
Page 16
IP025-001 V3
g
IBL Lift Series Installation
9.) Raise the lift up – keep a close eye as t he lower frame enters the enclosure/hole.
Center the closure panel left-to-right and front-to-rear. Tighten the CTB Bracket
and Slider hardware when completed.
Closure Frame Rod
upper detail
No longer than 2”
Cut rods to length
for projector
Closure Frame Rod
lower detail
NOTE:
• Prepare the ceiling closure panel by painting it to match the existing ceiling.
• Carefully raise the lift using the remote control.
• Finally, adjust the rods so that the ceiling closure panel fits flush with the ceiling.
• When adjusting the Closure Panel, the springs should compress about 1/8” to
1/4”.
¼-20 Rod Nut
Plastic Sleeve
Sprin
Flat Washer
¼-20 Nylock Nut
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
16
Page 17
IP025-001 V3
IBL Lift Series Installation
Final Adjustments
Operate the lift up and down several times to verify all adjustments and ensure proper
operation.
Raise the lift to its home position with the UP button (in MANUAL mode) slowly,
carefully, and intermittently. Observe the cables rigged to the sides of the lift carefully
and watch for any problems.
Bring the lift down with the DOWN button, and again watch for any problems. Adjust
the closure system as needed.
Operate the lift up and down several times.
Place the lift in automatic mode. (OVERRIDE + STOP).
If you did not set the 12-volt trigger and AC configuration revisit Part 1 and set the Dip
Switches for your system design.
The lift is now installed and ready for operation.
Operating Temperature Range 32° – 104°F / 0° – 40°C
Horsepower 1/15 – 110V60Hz or 220V 50Hz
Current Draw 2.0A @ 110V
1.0A @ 220V
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
17
Page 18
IP025-001 V3
IBL Lift Series Installation
Lift Removal
1. Disconnect all cables from the projector. It may be necessary to remove all
cabling
2. from the cable management clips on the side of the lift if disconnects were not
installed.
3. Remove the Ceiling Closure Panel.
4. Remove the projector from the lift.
5. Raise the lift into the closed position.
6. Disconnect the AC power and remote control cables.
7. Support the lift with an appropriate support system.
8. After the lift is secured, remove the mounting hardware.
9. Caution: mounting hardware may fall when removed.
10. Lower the lift from the ceiling, and crate for transport.
Maintenance & Safety
All Display Devices lifts are virtually maintenance free.
Annual safety checks are suggested to insure continued reliability and safe operation.
1. Inspect lifting cables for wear.
2. Inspect drive chain for any wear.
3. If equipped with safety strap(s), verify that they are drawing smoothly in and out
of the clutch area, and that there is no sign of wear and tear. Also check them
for proper locking operation with a quick tug on the strap(s).
4. Check motor and bearings for any leakage.
5. Verify limit switch operation.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
18
Page 19
IP025-001 V3
IBL Lift Series Installation
Emergency Operation
If your lift has traveled below the service position, and activated the lower limit safety
switch, you will need to refer to the Remote Control Operation and Programming
section and/or follow the steps below:
1. Remove the back cover of the handheld remote control case, or remove the
switch plate from the wall box.
2. Press and hold the EMERGENCY button in the circuit board, press the UP
button and release, then release the EMERGENCY button. The Lift should travel
upward.
3. Verify operation and reprogram positions if necessary.
Front Back
If the above steps do not resolve the problem, call Technical Support at 303.412.0399
during normal business hours, or E-mail Display Devices, Inc. at
tech@displaydevices.com
UP
DOWN
STOP
EMERGENCY – accessible only
with back cover removed
SET
These two bottoms are accessed with a small point
OVERRIDE
.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
19
Page 20
IP025-001 V3
IBL Lift Series Installation
Hand-held Remote Control Unit
Model # S10018
The Display Devices Hand-held Remote Control Unit is a versatile, multi-functional
programmable remote for lift operation.
The UP button moves the lift to the home position in AUTOMATIC mode, and raises the
unit intermittently on command in MANUAL mode.
The DOWN button lowers the lift to its SHOW position in AUTOMATIC mode, and
lowers the unit intermittently on command in MANUAL mode.
The SET and OVERRIDE buttons on the back of the unit are used in combination with
the three command buttons on the front to program the remote control to run the lift.
The EMERGENCY button is only to be accessed only in the unlikely case of the lower
limit switch being activated. This will be discussed later.
* It is recommended to keep the handheld 9-pin remote attached to the control box in addition to any control system for easy maintenance override or in case of control
system failure.
Front Back
UP
DOWN
STOP
EMERGENCY – accessible only
with back cover removed
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
20
Page 21
IP025-001 V3
IBL Lift Series Installation
HOW DO I?
Program the lift to MANUAL MODE
1. Use a small point (straightened paperclip) to press and hold the OVERRIDE button
then press the UP button. Release UP, then release OVERRIDE.
2. Test the unit by pressing the DOWN button. It should move only when the button
is depressed. The lift will stop when the button is released.
.
Front Back
UP
DOWN
STOP
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
21
Page 22
IP025-001 V3
IBL Lift Series Installation
HOW DO I…
Set the SHOW position
This is the intermediate level for “on screen” projection.
1. Program the remote to MANUAL MODE - Press and hold the OVERRIDE button
then press the UP button. Release UP then release OVERRIDE.
2. Lower the lift with the DOWN button to its desired projection position.
3. To program the remote to the SHOW position: press and hold the SET button then
press the UP button. Release UP then release SET.
4. To return the remote to the AUTOMATIC MODE, press and hold the OVERRIDE
button, followed by the STOP button. Release STOP, then OVERRIDE.
5. Return the lift to the HOME position by pressing the UP button once.
6. Test the operation of the lift to verify it has accepted your program.
7. Press the DOWN button once. The lift will travel to its programmed position. If the
lift does not travel to the position just programmed, repeat this process.
* Remember, the remote must be in AUTOMATIC MODE for the commands to operate
correctly.
Front Back
UP
DOWN
STOP
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
22
Page 23
IP025-001 V3
IBL Lift Series Installation
HOW DO I?
Set the SERVICE / MAINTENANCE position
This is lower than the SHOW setting, bringing the lift to a level making maintenance,
service, lamp and filter changes, and projector adjustments easier.
1. Program the remote to MANUAL MODE - Press and hold the OVERRIDE button
then press the UP button. Release UP, then release OVERRIDE.
2. Lower the lift with the DOWN button to its desired position for the easiest
access for maintenance and repair.
3. To program the remote to the SERVICE/MAINTENANCE position, press and hold
the SET button, followed by the STOP button. Release the STOP, then SET
buttons.
4. To return the remote to the AUTOMATIC MODE, press and hold the OVERRIDE
button, followed by the STOP button. Release the STOP, then OVERRIDE
buttons.
5. Return the lift to the HOME position by pressing the UP button once.
6. Test the operation of the lift to verify it has accepted your program, press and
hold the OVERRIDE button, followed by the DOWN button. The lift will travel
to its programmed position.
Remember, the remote must be in AUTOMATIC MODE for the programs and
operations to operate correctly.
Front Back
UP
DOWN
STOP
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
23
Page 24
IP025-001 V3
IBL Lift Series Installation
HOW DO I?
Program the remote to AUTOMATIC MODE
1. Press and hold the OVERRIDE button, followed by the STOP button. Release the
STOP then OVERRIDE buttons.
In the AUTOMATIC MODE, the lift will automatically descend to the proper show level,
rise to the HOME position, and descend to its lower limit service and maintenance.
Front Back
Clearing Errors
To clear errors, press and hold the STOP button for 10 seconds and release. If the
same error occurs, call Display Devices technical support.
UP
DOWN
STOP
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
24
Page 25
IP025-001 V3
IBL Lift Series Installation
HOW DO I…
Recover Lift from LOWER LIMIT SWITCH ACTIVATION
When the Lift is lowered beyond its lower limit or Service/Maintenance position, a small
trip lever activates a safety shut-off on the lower limit switch. It is located on the
between the control box and scissors. If the lift will not respond to any command
buttons and the LED on the remote and control box blinks seven times proceed with the
following:
1. Remove the back cover of the remote control with a small Phillips-head
screwdriver. Now you have access to the EMERGENCY OVERRIDE button on
the circuit board.
2. Hold in the EMERGENCY button, followed by the UP button. The lift will return
to its HOME position in the ceiling, allowing the lift to reset its memory.
3. Put the cover back on the remote.
4. Put the lift into MANUAL MODE (OVERRIDE + UP).
5. Press the OVERRIDE and SET buttons at the same time. This allows you to set
a new SERVICE / MAINTENANCE position for the lift.
6. Press and hold the DOWN button until the striker plate foot (on the upper
scissor arm) is ½ inch from tripping the lower safety switch when it reaches its
desired SERVICE/MAINTENANCE position (but not so low as to activate the
safety switch again!)
Lower Limit
Striker plate
Adjustment foot
Lower Limit Switch
1/2” gap
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
25
Page 26
IP025-001 V3
IBL Lift Series Installation
7. Press both the OVERRIDE and SET buttons at the same time. This will reset the
electronic lower limit switch.
8. Return the remote to AUTOMATIC MODE (OVERRIDE + STOP).
9. Press the UP button, and allow the lift to travel up to its home position.
*Hold in the EMERGENCY OVERRIDE button (the LED will stop blinking). Keep the
EMERGENDY OVERRIDE button held, then press and hold the UP button. Keep both
buttons held until the lift has moved six inches. Allow the lift to travel all the way to the
home position.
Front Back
UP
DOWN
STOP
SET
These two bottoms are accessed with a small point
OVERRIDE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
26
Page 27
IP025-001 V3
IBL Lift Series Installation
Summary of the Remote Control Functions
The OVERRIDE and SET buttons are hidden on the back of the remote control. The
lower button is OVERRIDE and the top button is SET. A straightened paper clip or
similar device will be needed to activate them.
When using the OVERRIDE and SET buttons, these buttons must be pressed first and
released last in the sequence.
To set the normal show position, press and hold SET, press and release UP, and then
release SET.
Automatic Mode:
UP moves lift to the top position, DOWN moves lift to show position, and STOP stops
the motion of the lift.
UP, DOWN, and STOP are functional while the lift is moving.
Manual Mode:
UP and DOWN buttons move the lift only while the buttons are depressed. Unit will stop
at the top limit switch.
STOP stops the motion of the lift at the current position.
OVERRIDE & DOWN from the show position moves the lift to the maintenance position.
OVERRIDE & UP from any position will place the lift into the manual mode.
OVERRIDE & STOP terminates the manual mode and returns the lift to automatic mode.
SET & UP sets show position and only works in manual mode.
SET & STOP set the maintenance position and only works in manual mode.
When in the automatic mode, press and hold OVERRIDE, then press STOP & UP
together to place the unit into test mode. This will continually cycle the lift between
home and show positions, pausing at each position. To terminate, press stop.
The NO MOVEMENT switch is located on the control box mounted to the lift frame and
disables all movement of the unit. Remote control buttons become inactive.
EMERGENCY & UP raises the lift only after the lower safety switch has been triggered.
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
27
Page 28
IP025-001 V3
)
j
)
p
IBL Lift Series Installation
SETTING MAINTENANCE AND SHOW POSITIONS
Put the Lift into
Manual Mode
Press OVERRIDE & UP
Press DOWN to lower lift
to desired Maintenance
position (lift will stop
when button in released
Set Maintenance position
Press SET & STOP
Return to AUTO mode
Press OVERRIDE & STOP
Press UP button, lift
should travel to home
Press DOWN to lower lift
to desired Show position
(lift will stop when button
is released
Set Show position
Press SET & UP
Return to AUTO mode
Press OVERRIDE & STOP
Press UP button, lift
should travel to home
To test: Press OVERRIDE
& STOP buttons, lift
should travel to position
ust set and then stop
If yes, press UP
and lift is ready for
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
If no, press UP and
start again
28
If no, press UP and
To test: Press DOWN
button, lift should travel
to position just set and
then sto
start again
If yes, press UP
and lift is ready for
Page 29
IP025-001 V3
–
–
–
R
R
IBL Lift Series Installation
SAFETY O/
Digital Remote
Interface Schematic
22 AWG for cable runs up to 100 feet
20 AWG for cable runs that are 100 to 500 feet
DOWN UP STOP
O/
SET
LED
UP (5ma draw)
1 Black
2 Red - DOWN (5ma draw)
3 Green - STOP (5ma draw)
O/R (5ma draw)
6 White - (Ground)
5 Yellow
4 Blue - SET (5ma draw)
LED (20ma draw)
9 Brown +5V
7 Purple
9 Orange - Safety Switch O/R (5ma draw)
NOTE:
O/R = OVERRIDE
Do not connect or short any wires to Pin 8 or 9 except Safety Override Button
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
29
Page 30
IP025-001 V3
g
g
box
IBL Lift Series Installation
Troubleshooting
Chart
YES: Does the lift
NO: Call DDI for brake
Call DDI
travel upward?
proceed to beginning
release adjustments –
control box
replacement
NO: Call DDI for
call DDI
mechanical problems,
YES: If the lift has any
YES: Reset breakers
– proceed to beginning
correct call DDI for
YES: Verify wiring if
replacement control
NO: Is the remote
control connected?
NO: Correct wiring to
match schematic
NO:
Hook up power –
proceed to beginning
7 BLINKS: Safety
switch is triggered –
instructions
see manual for
YES:
Are the circuit
override process
breakers tripped?
into control box?
sound
Indicated by click
YES: Is the brake
releasing properly?
sound?
NO: Does the lift
make a click of hum
control box –
NO: Plug motor into
proceed to beginning
YES: Is the motor
unit is ready to use
2 BLINKS: Normal –
– proceed
to beginning
SOLID LED: no
blinks – Turn No
Movement Switch off
volatile memory
3 BLINKS: Non-
replacement parts
corrupted. Call for
connector plugged
NO: Does the lift
NO: Are the safety
problems?
have any mechanical
frame engaged?
switches on the top
4 BLINKS:
jumper past the
YES: Release or
switch, rest power,
proceed to beginning
box
slot. Call DDI for
YES: Plug in the
replacement parts
YES:
Is the slot sensor
Does the lift move?
NO: Call DDI for
replacement control
unplugged?
wheel damaged or
voltage. Verify low
5 BLINKS: Low AC
box
NO: Call DDI for
replacement control
innin
be
YES: Turn lift off,
restore power, turn
lift of and proceed to
line voltage
call DDI for
6 BLINKS: Safety
switch triggered –
YES:
Blinks?
Number of LED
after 10 second
UPON POWER UP?
IS THE LED ACTIVE
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
30
NO: Is the unit
receiving power?
Verify w/ voltmeter
Page 31
IP025-001 V3
IBL Lift Series Installation
Warranty
This product is warranted against defects in material and labor for 12 months from the
date of shipment from Display Devices, Inc. Unit must not exhibit previous alterations
or repairs except those performed by an authorized Display Devices dealer, distributor
or factory service center.
Exclusions:
Routine maintenance, normal wear and tear, misuse, improper operation or installation,
neglect, abuse or acts of nature.
Fax or mail to:
Display Devices, Inc.
5880 N. Sheridan Blvd.
Arvada, CO 80003
(v) 303-412-0399
(f) 303-412-9346
Company Information:
Name:
Address:
City/State/Zip:
Phone:
Fax:
Dealer purchased through:
Date purchased:
Model #:
Serial #:
Comments:
07/05 Thor/Sales Info/Installation Materials/IBL Li ft
31
Page 32
IP025-001 V3
IBL Lift Series Installation
Help us help you!
We value your feedback about our products. Any input you can provide will help us
design and build better products for you. Please take a few minutes to answer the
following questions. Use a 1 to 10 scale with 1 being poor to 10 being excellent.
When complete, fax it back to us at 303-412-9346.