DirectConnect DCRACK38U, 19929, DCRACK29U, 19930, 19931 User Manual

...
HHeellppiinngg yyoouu aacchhiieevvee yyoouurr iinnssttaallllaattiioonn nneeeeddss!!
DDiirreeccttCCoonnnneecct
t ® is one of the largest manufacturers of products
specifically for the custom installation of audio, video, security, telecom and data networking industry.
OOuurr eexxtteennssiivvee pprroodduucctt lliinne
e offers items in the categories of bulk
wire and cable, connectors, installation hardware, interconnect cables, distribution panels, a/v transceivers, cameras, media servers, baluns, mounts, tools and wall platesvirtually everything a custom installer needs!
SSiinnccee 11999966,, DDiirreeccttCCoonnnneecct
t
®
®
has offered unique products that
provide solutions to everyday installation headaches.
Houston, Texas 77027
Phone 800.531.3224
Would it make your day to know that someone is waiting to hear from you?
We are. Your DirectConnect® representative is ready to take your call.
Or if you prefer, visit us online at …
http://www.directconnecthome.com
PPrrooffeessssiioonnaall SSeerriieess RRaacckks
s
DDCCRRAACCKK2299U
U .19929
DDCCRRAACCKK3388U
U .19930
DDCCRRAACCKK4422U
U .19931
CCoommpplleettee RRaacckk wwiitthh ccaasstteerrss,, ppoowweerr ssttrriipp,
, USER MANUAL
tthheerrmmaall ccoonnttrrooll aanndd dduuaall ffaanns
s
PROFESSIONAL SERIES RACKS 29U, 38U, and 42U
DirectConnect® offers solutions for custom installers and custom system integrators with a full line of multi-use Professional Racks that deliver extraordinary capabilities in construction and performance: elegant yet secure lockable, solid steel construction; thermal system; power control; and a robust caster system.
These space saving and sturdy racks offer locking custom-designed, see-through, tempered front and vented rear doors and removable sides, which provide quick access to all your Audio/Visual, Servers, and Network equipment. The rack’s top-mounted, thermal-controlled dual fans and ventilation construction efficiently remove heat produced from your enclosed equipment. The internal numbered mounting rails are depth-adjustable to fit virtually any piece of
19” equipment. And, in addition to all the included equipment that are options on most other racks,
DirectConnect® also has a full line-up of optional accessories like rack blanks (1U-4U), extra A/C power distribution strips, standard and/or vented fixed shelving (1U-3U), and sliding (pull out) shelving.
EASY INSTALLATION: Quick and easy assembly - Four easy steps EASY ACCESS: Removable side s and reversible front and rear doors POWER ACCESS: 1U 6 outlet Power Distribution Strip with protected on/off switch UNIVERSAL MOUNTING: Numbered solid steel adjustable mounting rails COOLING: 1U Digital Thermal Controller and top loaded dual 5” Cooling Fans VENTILATION: Custom tempered glass door and vented rear door CABLE MANAGEMENT: Removable cable plates in rack’s top & base, plus space between
rails & door for 2” x 2” PVC cable management molding
SAFETY: Locking vented tempered glass front & vented rear doors, adjustable feet on all
four corners and heavy duty locking removable caster system
(six screws)
REV07/22/11
IMPORTANT: If you do not understand correct installation instructions,
please consult your installation specialist.
8 / 8
Fig. 7a
Fig. 7
TThhaannkk yyoouu ffoorr cchhoooossiinngg DDiirreeccttCCoonnnneecct
t
®
®
PPrroodduuccttss
DDeeaarr CCuussttoommeerr
Thank you for purchasing this DirectConnect® product. For optimum performance and safety, please read these instructions carefully before assembling, operating, or adjusting this product. Please keep this manual for future reference.
Table of Content
1.0 Hardware List ……………………….……… 3
2.0 Features ……………………………………… 4
3.0 Package Contents…………………………… 4
4.0 Installation Guide ………………………….… 5
4.1 Un-packaging 2 of 3 & Installation Guide. 5
4.2 Un-packaging 1 of 3 & Installation Guide…. 5
4.3 Un-packaging 3 of 3 & Installation Guide..... 6
4.4 Installing the Doors and Panels …………..… 6
5.0 Operation and Adjustment…………………... 7
SAFETY WARNING:
1. These DirectConnect® Professional Series Racks are intended for use only within the maximum weights indicated. See apparatus instructions. Use with products heavier than the maximum weights indicated may result in instability, causing possible injury.
2. Do not climb on, rock, shake, stand on, or tilt your Professional Series Racks.
3. Someone with good mechanical aptitude, who has experience with basic building
construction, & who fully understands this manual, should install this product.
4. Safety gear and proper tools must be used. A minimum of two people could be required for this installation. Failure to use safety gear can result in property damage, serious injury or death.
5. This product contains small items that could be a choking hazard if swallowed.
Keep these items away from young children.
6. Never exceed the Maximum Load Capacity.
7. Do to the height and weights of the Professional Series Racks do not move by
yourself assistance is required. Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
8. Tighten screws firmly, but do not over-tighten. Over-tightening can damage the
items, greatly reducing their holding power.
IMPORTANT: If you do not understand correct installation instructions,
please consult your regular installation specialist
*DirectConnect® is a registered trademark.
5.0 OPERATION AND ADJUSTMENT
1) The DirectConnect® Professional Series mounting rails (A & B) 10-32 pre - threaded holes and the (J & K) 10-32 square knockout holes (as shown in Figure 7) are labeled in EIA standard rack space increments allowing for easy equipment alignment.
a) Using threaded mounting rails (A & B) for front - Select the location that the equipment is to be mounted and screw down the equipment with 10-32 bolts (H). The mounting rails
(A & B) have pre-threaded 10-32 holes just screw equipment directly into desired position.
b) Using square knockout mounting rails (J & K) for front - Select the location that the equipment is to be mounted and insert the supplied 10-32 snap nuts (I) by pressing on either side of the nut, then insert the clamp side into the square hole, and release into the mounting rails (J & K) where the equipment is to be mounted. To completed screw down the equipment with 10-32 bolts and 10-32 snap nuts (H & I) into desired position
c) If the equipment has mounting with hooks, j ust hook the bracket into position for any equipment that has mounting brackets with hooks
2) The DirectConnect
®
Professional Series Racks are equipped
with locking heavy duty casters (D) to move the rack easily. There are four (4) adjustable locking feet (C) on the base of the rack, use a wrench to adjust the feet until the legs are lowered enough that the wheels are slightly off the ground and lock with nut to base. Also they ensure that the rack does not tip forward when a heavy drawer is pulled out.
(
CAUTION - feet may damage flooring if rack is moved when loaded with equipment)
3) Determine the type of optional shelves - Fixed or Sliding
a) Fixed Shelves - secured to the mounting rails (A & B or J & K) using supplied 10-32 bolts (H). Short
shelves use 10-32 bolts (H) to attach into place to the front mounting rails (A & B or J & K) of the rack. Deeper shelves determine the desired height that you want to install the shelf at, and then fasten the shelf with the provided 10-32 bolts (H) to the front of the mounting rails (A & B or J & K).
b) Sliding Shelves - Determine the desired height to install the shelf then line up with the holes on the mounting rails (A & B or J & K) use 10-32 bolts (H) to fasten sliding shelf’s guides.
CAUTION:
To avoid damage to your components due to overheating, ensure that there is adequate space between each unit
for proper airflow. It is important to maintain an operating tem perature inside of the rack that does not exceed 104°F (40°C).
4) Attach the 1U Power Strip (6) at desired location using supplied 10-32 bolts (H) or 10-32
bolts and snap nuts ( H & I). Plug power strip’s A/C cord into A/C outlet.
5) Attach the 1U Thermal Control unit (7) at desired location using supplied 10-32 bolts (H) or 10-32 bolts and snap nuts ( H & I). Connect the thermal power cord (8). Plug A/C cord from dual fans in Fan Top Assembly (4). Locate the thermal control unit’s thermal sensor at desired location. See Thermal
6) The DirectConnect® Professional Series Racks are designed to accommodate other optional accessories like 2 x 2” PVC cable management molding between the door frames (1 & 2) and the racks mounting rails (A & B or J & K) as shown in Figure 7a.
IMPORTANT: Do not force the bolt into the hole, which may damage equipment and injure of person. Do
not use electric drill to fasten any bolts.
TThhaannkk yyoouu ffoorr cchhoooossiinngg DDiirreeccttCCoonnnneecct
t
®
®
PPrroodduuccttss
IMPORTANT: If you do not understand correct installation instructions, please consult your installation specialist
* This DirectConnect® is a registered trademark.
2 / 8
7 / 8
Using eight (8) M6x12 screws (G) attach the Back Assembly (2) as unpacked from carton 1 of 3 and attach to the left and right assemblies (3) as shown in Figure 3.
2.0 FEATURES
This high-performance DirectConnect® Professional Series Racks have many benefits and features that enable it to perform in a superior manner. Among those benefits and features you will find:
Quick and easy to assemble design allows for flat shipment 1U Digital Thermal Controller (LCD display menu) and top loaded dual 5” Cooling Fans 1U 6 outlet Power Distribution Strip with protected on/off switch and long ground power cord Adjustable numbered 2.5mm (11 gauge) heavy duty threaded (2) and square knockout (2)
mounting rails to fit virtually any piece of 19” equipment.
Robust locking (2 ) six screw heavy duty caster system Four adjustable (one in ea ch corner of base) heavy duty locking feet Removable Cable Knockouts on rack’s top and bottom Heavy-gauge steel tops & bottoms, seamless steel sides, and rails Locking, removable, & reversible custom designed tempered glass front door Locking, removable, & reversible vented rear door Heavy duty and durable black textured powder coat finish Cable channel molding option between rails and doors for 2” x 2” PVC” cable management 19” equipment width rail size for the 29U, 38U, and 42U racks 29U Rack Dimensions: (H x W x D) 57.5” x 23.75” x 23.75” (1,460 .5 x 603.3 x 603.3mm ) 38U Rack Dimensions: (H x W x D) 70.86” x 23.75” x 23.75” (1,8 60.5 x 603 .3 x 603.3 mm) 42U Rack Dimensions: (H x W x D) 78.75” x 23.75” x 23.75” (2,057.4 x 603 .3 x 603.3 mm)
3.0 PACKAGE CONTENTS
Before attempting to use these DirectConnect® Professional Series Racks, please check the packaging and make sure the following items are contained in the shipping carton:
(Total of 3 cartons)
Front, back, and two (2) side assemblies Top assembly with dual fans Two (2) left and two (2) right mounting rails Base assembly 1U digital thermal controller Four (4) base cable plates 1U 6 outlet power distribution strip Power cord for PDU strip Adjustable locking feet – four (4) Four (4) locking casters DirectConnect
®
User's Manual Keys –two (2) sets of two (2)
42 - M5x10mm bolts
for assembly
42 - M6x12mm bolts
for assembly
38 10-32 bolts
for mounting rails
Note: Please retain the original packing material in case you need to return the unit. If you find any items missing, contact DirectConnect® immediately (800.531.3224). Please have the model number, serial number, and invoice available for reference when you call.
IMPORTANT: For optimum performance and safety, please read these instructions carefully before
assembling, operating, or adjusting this product. Please keep this manual for future reference. If you
don't understand correct installation instructions, please consult your regular installation specialist
*DirectConnect® is a registered trademark.
4.0 INSTALLATION GUIDE
We are not responsible for any personal injury or product damage due to mishandling, incorrect mounting, incorrect assembly, or incorrect use of this product
CAUTION: These DirectConnect
®
Professional Series Racks are intended only with the maximum weights indicated. See apparatus instructions. Use with products heavier than the maximum weights indicated may result in instability, causing possible injury.
Step 1: Unpacking Carton 2 of 3, removing transit parts, and side assemblies.
(Two
(2)
Side Assemblies, Left
(2)
& Right
(2)
Mounting Rails)
Remove the small mini shipping screws (2) opposite of side door releases on both the left & right side of side rack assembly (3) to
remove side panels to start rack assembly.
Installing Left (A) and Right (B) threaded mounting rails or Left (J) and Right (K) square knockout mounting rails on Left and Right Side Assembly
Using M6x12 screws (G) (six (6) p er rail) and M6 snap nuts (I) (six (6) per rail) attach the left (A) and right (B) mounting rails as shown in Figure 1.
Step 2: Unpacking Carton 1 of 3 and assembly Front & Rear Assembly to sides.
Using eight (8) M6x12 screws (G) attach the Front Assembly (1) as unpacked from carton 1 of 3 and attach to the Left (A or J) and Right (B or K) assemblies as shown in Figure 2.
Installing the Back Assembly (2) to Left (3), Right (3), & Front (1) Assemblies
IMPORT ANT: Do not
force the bolt into the hole, which may damage equipment and injure of person.
4 / 8
5/ 8
Fig.2
Fig.3
Fig.4
Fig. 5a
Fig.6
Step 3: Unpacking Carton 3 of 3 and assemble Top & Base Assembly to rack.
Installing the Top with dual fans and Base Assemblies, Casters, Legs, and Base Cable Plates (as needed) to rack assembly.
Using six (6) M5x10 screws (F) attach the Top Assembly with dual fans (4) as unpacked from carton 1 of 3 and attach to Rack Assembly as shown in Figure 4.
Using four (4) M5x10 screws (F) attach the Base Assembly (5) as unpacked from carton 1 of 3 and attach to Rack Assembly as shown in Figure 4.
Using six (6) M5x10 screws (F) (six per
caster) attach two (2) Locking Casters (D)
onto the bottom Front Assembly (1) and two (2) Standard Casters (D) onto the bottom Back Assembly (2) as shown in Figure 5a.
Using a wrench attach two (2) of the Adjustable Locking Feet (C) onto the bottom Front Assembly (1) the bottom Back Assembly (2) as shown in Figure 5a.
Installing the four (4) (as needed) Base Cable Plates (E) to the Rack Assemblies
C
AUTION:
Do to the height and weights of the Professional Series Racks do not move and/or stand up by yourself
assistance is required. Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
Stand up the completed rack assemblies. Using two (2) M5x10 screws (F) for each of the (as needed) Base Cable Plates (E) (Fig.5b) attach each to the top side of Base Assembly (5) as shown in Figure 5a.
Step 4:
Attaching the doors and panels to the Rack Assemblies
Attach the Custom Tempered Glass Door (1), the Vented Back Door (2), and the left & right Side Panels (3) to the completed rack assemblies as shown in Figure 6.
Installing & Adjusting the Front (1) & Back (2) Doors.
1) The Front Door (1) and the Back Door (2) are removable at any time. Just pull down on the top tap while holding the door. The top of the door will then fall out of place, then pull up on the bottom tab and lift the door out of the frame.
2) There may be times when the door may need to open to the other directions. The door’s opening direction can be changed. Remove the door and turn it so that the handle is on the other side. Insert the tabs into the holes and close the door.
.
1.0 HARDWARE LIST:
Actual parts appearance and quantity may differ from illustration.
ID
Quantity
Description
ID
Quantity
Description
1 1 Front Assembly
A 1 Left Threaded Mounting Rail
2 1 Back Assembly
B 1 Right Threaded Mounting Rail
3 2 Side Assembly
C 4 Adjustable Locking Feet
4 1 Fan Top Assembly
D
4
Heavy Duty Casters
(2- standard / 2 - locking)
5 1 Base Assembly
E 4 Base Cable Plates
6 1 1U Power Strip
F
42
M5x10mm bolt
(assembly)
7 1 1U Thermal Control
G
42
M6x12mm bolt
(assembly)
8
1
Power Cord
(Thermal)
H
38
10-32 bolt
(mounting rails)
9 4 Keys
I
38
10-32 nut
(mounting rails)
10 1 Manual
J 1 Left Knockout Mounting Rail
K 1 Right Knockout Mounting Rail
3 / 8
6 / 8
Fig.5b
Loading...