Direct Bikes DB50QT-16, DB50QT-5 User Manual

Introduction
Direct Bikes thanks you for purchasing your new
DB50QT-16 / DB50QT-5 scooter. We produce our
scooters using some of the most advanced
production techniques in the world.
compiled a basic manual for you that covers the
assembly out of the crate and the basic
maintenance. Please read carefully. If in any doubt
consult a suitably qualified person or our technical
department.
Proper assembly and maintenance will ensure your
safety and the long service life of the machine.
Identification
The VIN or chassis number is located on the frame of the scooter and is either under the seat or under
the clip in cover in the front of the footwell. The
engine number is located on the left side on the
bottom of engine.
Tools
Please have a selection of good quality tools ready
which include; Cutters, knife, hammer, 8, 10, 12, 13,
14, 17mm sockets and spanners, ratchet, extension
bar, flat screwdriver’s, Philip screwdriver’s, pliers,
magnetic tray, lube, multi-purpose grease and
cleaning cloths.
The Crate
Before starting check the model details against the
invoice details and any signs of damage to the box.
Please ensure you have adequate space. Using
scissors cut the nylon bands that surround the box
and discard. Cut the cardboard to reveal the steel
frame supporting the scooter. You will now need a
13mm socket on a bar or ratchet and a 13mm
spanner. Undo the front wheel from the frame.
Undo all the lower nuts and bolts securing the upper
portion of the frame. Undo the bolts securing the
handlebars and the rear carry rack.
Wearing gloves and using two people, lift the upper
part of the frame off the scooter. Be careful not to
scratch the paintwork. The scooter is now held in
by only the front spindle. Stood at the rear of the
scooter, lift it out of the frame to the right and put
the centre stand down. One person holds the back
down whilst the other person undoes the spindle
and releases the scooter from the frame completely.
Discard the metal frame. Remove all the protective
packaging and the ancillaries from the footwell.
(Illustration only)
Assembly
Screen
The screen mounting kit utilises the mirror mounts
to fix it to the scooter. Start by sliding 2 of the plastic
lugs over the L shaped chrome bars. The bars are
handed left and right. Next screw 1 nut onto the
short threaded part all the way, finger tight. Put the
mirror mount on so that the flat part faces down. Put
the other nut on finger tight. Next place the mirror
through the hole, though the spacer and screw into
the mirror mount on the handle bar. The uprights
should be on the inside. Next put the rubber pads
over the chrome screen fixings and push through
the front of screen. Put the 4 rubber washers on the
back of the screen and mount the assembly onto
the frame. Use the M6 nuts and washers to fasten
the screen. Position the screen and tighten.
Top box
The top box is supplied with a universal fitting kit.
The two long slotted bars go on the inside of the
box. Put the long M6 screws (4 of) through the slots
and line the box on the rack so that it is central. Use
the 4 smaller slotted bars underneath. Fix in place
with the nuts and washers provided. Cover with the
protective foam mat A maximum weight of 10 kilos
is recommended. The weight may also alter the
handling of the scooter.
Loading...
+ 11 hidden pages