Dinolift 135T, 150T, 180T Quick Start Manuals

QUICK GUIDE
135T - 150T - 180T
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
2 1 0 1 2 3 4 5 6 7 8 9 10
m
18
11 12
19
(80 kg)
(80 kg)
(120kg)
135T 150T 180T
Weight
1635 kg 1675 kg 1840 kg Transport height 2,16 m 2,24 m 2,18 m Transport width 1,78 m 1,78 m 1,78 m Support width 3,8 / 4,2 m 3,8 / 4,2 m 3,8 / 4,2 m Lifting capacity 215 kg 215 kg 215 kg
LIFT FUNCTIONS
Left
Right
Boom rotation: continuous Basket rotation: 90°
Basket
levelling
Boom lifting / lowering
Driving device
Hand brake
Basket
rotation
Boom
rotation
Notice! Outreach depends on the platform load.
Telescope
UCB
LCB
Mains switch
NOTICE! This quick guide is a brief summary of the use of DINO access platform and does not replace the operating instructions for the device.
Read the operating instructions and make sure that you understand all of the instructions and warnings before using the device.
DAILY INSPECTIONS
• Check the condition of the work platform, boom and chassis structures
• Check the air pressure in the tyres and signs of damage
• Check the operation and condition of the lights
Check hydraulic oil level and the condition of hydraulic hoses, pipes and ttings
• Check the safety limits function
• Check the emergency descent, emergency stop and sound signal
• Check that all adhesive tapes and plates are in place, intact and legible
• Check that the lift includes operating instructions and that they are legible.
55 kg
MAX 215 KG
P
D
POWER SOURCES
Choke
Engine start / stop
Emergency descent system start-up. (UCB + LCB)
Sound signal (UCB)
WORK SAFELY
Mains power
Petrol engine
(option)
Controls for safety devices:
Forward
Right
Left
Please note information related to power sources:
• The aggregate does not start if the lift is connected to the mains
• Maximum cable length in mains network 25 meters (2,5m2 cable), fuse 10 A.
• Make sure that the batteries have time to charge
sufciently with aggregate or mains power.
• A timer automatically disconnects the supply voltage 1 hour after last operation of the electric or combustion engine. Re-activate by pressing the start button
• If the engine does not start, make sure that none of the emergency stop buttons has been pressed down.
Back
LIFT SUPPORT
OPERATING THE LIFT FROM PLATFORM CONTROL CENTRE (UCB)
1234
0
o
Automatic fuse (basket rotation)
Emergency stop (UCB + LCB)
• Max support force on the outriggers
135T: 11300 N (1150 kg)
150T: 12800 N (1300 kg)
180T: 16800 N (1700 kg)
V
1 2
0 3
1
V
1 2
0
3
1
OPERATING THE LIFT FROM CHASSIS CONTROL CENTRE (LCB)
V
1 2
0
3
2
V
1 2
0
3
3
Indicator lights:
Boom movements can be used from chassis contor center after the outriggers are on the ground.
P
D
Battery-operated
emergency descent
P
D
• This quick guide does not replace the operating instructions. Read the operating instructions before using the lift
• The lift operator must be over 18 years old
• The use of a faulty lift is strictly forbidden
• The use of the lift is forbidden if the temperature is below -20oC and/or the wind speed over 12,5 m/s
• The lift must not be used as a crane
• Make sure the work area is free
• The maximum permissible load must not be exceeded
• Never add load while in the upper position
• Maximum permitted lateral force load of 400 N
TOWING AND USING THE DRIVING DEVICE WITH THE LIFT IN THE TRANSPORT POSITION
Towing the lift
• Connect the ball-coupling and cable
• Connect the power line and check the lights
• Release the parking brake
• Lift up the jockey wheel
• Make sure that the driving device is not connected
The lift may only be moved in the transport position
• The boom lowered on the boom support
• The cover of the platform control centre closed
• Outriggers fully up
• No objects on the platform or the chassis
• Make sure that the electrical cable is disconnected or the cable is long enough
Driving with the driving device
• The selector switch must be set to "1"
• Switch the driving device to the driving position
• Release the hand brake
• Drive the lift with the drive controls
• Beware of obstacles and power lines
Positioning and levelling:
• Make sure the ground is even and sturdy enough. If necessary, use additional support plates.
• Lower the front support outriggers
• Lower the rear support outriggers
• Level the lift. The air bubble in the level gauge must be located inside the inner ring.
• Make sure that the tyres are properly off the ground
NOTICE! Support outriggers movements do not operate if the boom is not on the boom support.
The outrigger legs are supported and use of the boom is permitted.
Overload or the load at the outreach range limit
Indicator lights:
The load is within outreach range.
Overload or the load at the outreach range limit
NOTICE! The boom movements do not operate if the support outriggers are not rmly on the ground
Before use
• Perform daily maintenance procedures
• Check that the lift is properly supported in a level position
• Check the emergency stop and the emergency descent system
• Check the work area
Telescope in / out
Boom up / down
Boom rotation
Basket rotation
Basket levelling
The control panel symbols:
While in operation
• Monitor the danger area
• Beware of high-voltage power lines
• Do not climb onto the platform railing
• Do not drop objects from the platform
• If the overload indicator lights up, retract the telescope until the platform is back in working range.
Loading...