
DL9118 Operating Instructions
Figure 1 DL9118 Overview
- 2 -

DL9118 Operating Instructions
Figure 2 Earth Continuity/Insulation Measurement
Figure 3 Voltage measurement using test probes
- 3 -

DL9118 Operating Instructions
Figure 4 Voltage, RCD, Zs and line impedance measurement at a
mains outlet
Figure 5 Voltage, RCD, Zs, Ze and line impedance measurement at a
distribution board
- 4 -

DL9118 Operating Instructions
Figure 6 Phase to phase impedance/PSC measurement
Figure 7 Phase rotation
- 5 -

DL9118 Operating Instructions
Limited Warranty & Limitation of Liability
DI-LOG Test Equipment guarantees this product to be free from
defects in material and workmanship under normal use and service for
a period of 2 year. The period of warranty will be effective at the date of
purchase.
(c) Copyright 2016
All rights reserved. Nothing from this edition may be multiplied, or
made public in any form or manner, either electronically, mechanically,
by photocopying, recording, or in any manner, without prior written
consent from DI-LOG. This also applies to accompanying drawings and
diagrams.
Due to a policy of continuous development DI-LOG reserves the right
to alter the equipment specification and description outlined in this
publication without prior notice and no part of this publication shall be
deemed to be part of any contract for the equipment unless specifically
referred to as an inclusion within such contract.
- 6 -

DL9118 Operating Instructions
Table of Contents
Limited Warranty & Limitation of Liability ............................................... 6
Table of Contents .................................................................................... 7
Introduction ............................................................................................. 9
1 User Notes ........................................................................................ 10
2 Safety Notes ...................................................................................... 11
3 Accessories ....................................................................................... 12
3.1 Standard Accessories ................................................................ 12
3.2 Optional Accessories ................................................................. 12
4 Unit Description ................................................................................ 13
4.1 Identifying parts of the unit ........................................................ 13
4.2 LCD display ............................................................................... 14
5 Using the DL9118 ............................................................................. 16
5.1 Power On ................................................................................... 16
5.2 Battery Health Check ................................................................. 16
5.3 Remote probe ............................................................................ 16
5.4 Continuity Tests ......................................................................... 16
5.5 Insulation Resistance Tests ....................................................... 18
5.6 Voltage Measurement ................................................................ 19
5.7 High Current Earth Loop Impedance / Line Impedance ........... 19
5.8 Non trip Earth Loop Impedance / Line Impedance ................... 21
5.9 Auto RCD Test Sequence .......................................................... 22
5.10 RCD Trip Time Tests ........................................................... 2524
5.11 RCD trip current (Ramp) Tests ................................................ 26
6 Electrical Specifications .................................................................... 28
6.1 Earth Continuity ......................................................................... 28
6.2 Insulation Resistance ................................................................. 28
6.3 Earth Loop Impedance .............................................................. 28
6.4 Line Impedance ......................................................................... 28
6.5 RCD ........................................................................................... 29
6.6 Voltage/Frequency Measurement ............................................. 29
7 Environmental Conditions ................................................................. 30
8 Maintenance ...................................................................................... 31
8.1 Preparing to work on the DL9118. ............................................ 31
8.2 Securing the DL9118 ................................................................. 31
8.3 Cleaning ..................................................................................... 31
8.4 Battery Replacement ................................................................. 32
8.6 Service and Calibration. ............................................................ 33
8.7 Spare Parts. ............................................................................... 34
Appendix A ............................................................................................ 35
- 7 -

DL9118 Operating Instructions
Disposal of Old Product
This product has been designed and manufactured with high quality
materials and components that can be recycled and reused.
Please familiarise yourself with the appropriate local separate collection
system for electrical and electronic products.
Please dispose of this product according to local regulations. Do not
dispose of this product along with normal waste material. The correct
disposal of this product will help prevent potential negative
consequences for the environment and human health.
- 8 -

DL9118 Operating Instructions
Introduction
The DL9118 is a hand held, battery powered, multi-function electrical
installation test instrument capable of performing a comprehensive
range of tests, including:
Earth Continuity @ 200mA
Insulation Resistance at 250V, 500V and 1000V
Voltage
Frequency
Phase rotation
RCD Trip Time at ½I∆n, I∆n and 5xI∆n
RCD Trip current
Non trip Zs and PFC measurement on RCD protected circuits
High current Ze and PFC on non RCD protected circuits
Phase to neutral impedance and PSC
Phase to phase impedance and PSC
Power socket wiring polarity
- 9 -

DL9118 Operating Instructions
1 User Notes
This instrument and its operating instructions are intended for use
by adequately trained personnel.
The following symbols are used in these operating instructions and on
the DL9118.
Warning of electrical danger!
Indicates instructions must be followed to avoid danger to
persons.
Important, follow the documentation! This symbol indicates
that the operating instructions must be adhered to in order to
avoid danger.
- 10 -

DL9118 Operating Instructions
2 Safety Notes
This DL9118 is fully compliant with the requirements of:
BS EN 61010-1: 2010
BS EN 61010-2-30:2010
BS EN 61557 part 1, 2, 3, 4, 6, 7 and 10.
In order to ensure safe operation of this instrument, all notes and
warnings in these instructions must be observed at all times.
The DL9118 has been designed to make measurements
in a dry environment.
The DL9118 may be used to test circuits with a maximum
over-voltage Category III, 300 V AC/DC with reference to
earth.
High voltages are present at the probe tips of the DL9118
during insulation resistance measurement. Always hold
test probes above the hand guards.
The DL9118 and all associated cables and leads must be
checked for signs of damage before equipment is
operated.
Prior to any resistance measurement, always ensure that
the circuit under test is electrically isolated.
Where safe operation of the DL9118 is no longer possible it should be
immediately shut down and secured to prevent accidental operation.
It must be assumed that safe operation is no longer possible:
- if the instrument or leads show visible signs of damage or
- the instrument does not function or
- after long periods of storage under adverse environmental conditions.
If the DL9118 is used in a manner not specified by this
document then the protection provided by the equipment
may be impaired.
- 11 -