3
Tools and Materials required for the Installation
Tools required fort he Installation
3-2 Preproofer – HW Installation manual
.
3 Tools and Materials required for the Installation
3.1 Tools required fort he Installation
• Standard Screwdriver set
• Allen keys set
• Set of spanners 10-15 mm
• Phillips Screw driver set
• Measurement Tape
• Cordless drill to unpack the boxes
• wrench
3.2 Materials required for the Installation
• Local Power cord (not supplied)
• Ethernet cable to connect the ShuffleBox the PC (not supplied)
3.3 Unpacking the Boxes
Make sure the following parts are available, after unpacking the cases:
Large case:
• 2 side Legs
• 2 Shelves
• 2 or 3 Cross beams
• 2 side media guides for roll media
• Power supply with international plug
• Software package with hardware dongle
• Bag if screws, rectangular End plugs, circular end plugs, Printer locking devices
Small case:
• Curver
• 1 anti-curling device + rod
• Upper media deflector
• ShuffleBox + Control panel wires + Y-motor wires
2 Step ladder
All packaged items must be inspected at the customer's site before unpacking begins. The following steps are
taken when there has been damage:
1.) Record the observations on the delivery documentation.
2.) Inform the carrier, shipping agent and insurance agent.
Units may be removed from their box only by an approved engineer or representative. Do not proceed with
unpacking when there has been a damage report until authorized by the shipping and insurance agents.