Diamond Bidex 500 Installation Instructions Manual

INSTALLATION INSTRUCTIONS
Step 1 Location
Select a location in a cavity beneath a kitchen cupboard ensuring the area is clean and level. Care should be taken not to store perishable goods in the cupboard directly above the heater unit
Supply should be through a 2 pipe pumped central heating system
Step 3 Electrical supply
Warning: This application must be earthed A fused (5amp) electrical spur with a switch should be fitted in an easily accessible
position
.
Note: Electrical installation must comply with local or national regulations
1
Step 4 Preparation
This product is normally fitted directly onto the floor.Once the position has been
decided, mark out and cut
the plinth to the dimensions as shown below
.
AB3203
320mm 100 mm
A= Width of cutout B= Height of cutout
• Floor mounting
• Plinth mounting
Step 5 Water Connections
Fit the valve end of the flexible hoses to the Plinth Heater and the other ends to the central heating flow and return pipe work. Note the direction of flow arrows on the valves are not important in this application
System
y
pipe work
Flexible hoses
Isolating Valves
2
Loading...
+ 5 hidden pages