DHI External Reservoir for PPCH User Manual

Page 1
EXTERNAL RESERVOIR, P/N 402102, INCLUDES:
DESCRIPTION QTY PART NO.
Assembly, External Reservoir kit 1 402167
Tubing, PFA, 1/4 in. O.D. x 300 cm 1 101450-Z
Adaptor, 1/8 in. NPTM x 1/4 in. Swage 1 101532
Nut, SS, 1/4 in. Swage 1 100247
Ferrule, SS, front, 1/4 in. Swage 1 100248
Ferrule, SS, rear, 1/4 in. Swage 1 100249
INTRODUCTION
The External Reservoir kit is designed for use with the PPCH Hydraulic Pressure Controller. The external reservoir is provided for applications requiring more fluid than can be held in the 300 cm The external reservoir is connected in series with the internal reservoir so that internal reservoir features are still available.
3
internal reservoir.
External Reservoir
for PPCH™
4 liter capacity
P/N 402102
Instruction Sheet
NOTE: This instruction sheet is provided as a
quick installation guide. For further details, see the PPCH Operation & Maintenance Manual’s sections on use of an external reservoir.
INITIAL CONSIDERATIONS FOR INSTALLATION OF RESERVOIR
1. Internal reservoir attachments not used: When using the internal reservoir, a fill tube bracket, sight tube and funnel are mounted on the rear of the PPCH. These attachments are not used with the external reservoir. If the attachments are already installed, remove them. Be sure to close the FILL/DRAIN valve prior to removal.
2. Reservoir above the PPCH: The bottom of the reservoir must be higher than the PPCH instrument to ensure a proper gravity feed of fluid to the internal reservoir and pump. Avoid low points in the tubing between PPCH and the reservoir.
Figure 1. External Reservoir
1. Return port, 1/4 in. Swage
2. Supply port, 1/4 in. Swage
3. Mounting bracket 6. Return Tube
4. Fill cap, 1/2 in. Swage
5. Vent Plug, 10-32 x 1/8
3. Secure the reservoir: Pass throughs (5.4 mm Ø) are provided in the mounting bracket for securing the reservoir.
4. Prepare the tubes: 300 cm of 1/4 in. O.D. PFA tubing is provided for making tube connections between the external reservoir and the PPCH. The fittings on the external reservoir are 1/4 in. Swage. The ferrules need to be swaged to each end of the tubes.
5. Adaptor for Reservoir return: Use the supplied 1/8 in. NPTM x 1/4 in. Swage adaptor for the EXTERNAL RESERVOIR RETURN bulkhead on the PPCH.
To prevent accidental draining of the internal
reservoir, keep the FILL/DRAIN valve in the closed position until the external reservoir is connected.
Page 2
INSTALLATION OF RESERVOIR
Close valve: Close the reservoir FILL/DRAIN valve.
Install adaptor: Install the 1/8 in. NPTM x 1/4 in.
Swage adaptor in the PPCH EXTERNAL RESERVOIR RETURN bulkhead fitting.
Connect tubes: Connect a tube from the PPCH
EXTERNAL RESERVOIR RETURN port, to the
return port (1) on the external reservoir.
Connect tubes: Connect a tube from the PPCH
FILL/DRAIN port to the supply port (2) on the
external reservoir. The stainless steel Swage fittings are used at the PPCH FILL/DRAIN port connection.
Fill external reservoir: Fill the external reservoir
through the 1/2 in. Swage brass fitting (4) with the same fluid as is used in the PPCH. Do not fill past the top of the stainless steel return tube.
The MAX FILL label on the rear of the PPCH does
not apply when using an external reservoir.
The top of the return tube defines the fluid head
applied to the PPCH’s Q-RPT when in a VENT condition.
Enable reservoir return: Turn the PPCH
RESERVOIR RETURN valve to the EXTERNAL
position, and loosen the vent plug on top of the Reservoir – this is a 10-32 x 1/8 threaded plug.
Be sure the external reservoir is open to
atmosphere so proper system venting and zeroing can occur.
Purge overflow circuit: Purge air from the
internal reservoir and the overflow circuit:
Prepare the 1/8 in. NPT plug (that was
previously used in the external reservoir return bulkhead) for use in the OVERFLOW bulkhead fitting by wrapping the NPT threads with Teflon tape.
Slowly turn the FILL/DRAIN valve to the
OPEN position.
Plug the OVERFLOW bulkhead port when
gas-free oil begins to flow out.
Fill the reservoir return tube: Finish the purge
process by running the [PRIME] function on the PPCH to cycle fluid from the reservoir supply, through the PPCH, and back out to the External Return tube. First ensure the TEST port is plugged.
When the PPCH is vented, the system connected
to the TEST port is also connected to the External Reservoir (which is higher than the TEST port). If there is an open point in the system below the fluid level in the reservoir, fluid will run out of the system at this open point.
Document 560072 050412
DH Instruments, Inc.
4765 East Beautiful Lane Phoenix AZ 85044-5318 USA
Tel 602.431.9100
Fax 602.431.9559 dhi@dhinstruments.com www.dhinstruments.com
Loading...