Front panel identification34
ELMC commissioning35
Menu user information36-37
Menu humidifier condition38
Menu changing parameter system39-40
Faults messages41
MAINTENANCE
Maintenance of the cylinder42
Cylinder maintenance guide43
Maintenance of the valves44
Maintenance sheet45
Drilling templates46-48
1
1
Page 3
ElectroVap MC
Safety information
Important
This section should be read carefully to ensure the safe and correct installation of your humidifier.
GENERAL
This manual contains all details necessary for the planning and installation of the ElectroVap MC
humidifier. In addition commissioning and maintenance details are included.
The manual is intended for use by engineers and properly trained technical personnel. Maintenance,
servicing or repair work must only be carried out by suitable skilled and qualified personnel, the
customer must be responsible for ensuring their suitability.
Any risks or hazards, especially when working from ladders or towers should be identified by a skilled
and Health and Safety representative and effective control measure put in place.
No liability will attach to the Distributor if any damage, injury or accident is attributable to inattentive,
inappropriate, negligent or incorrect operation of the machinery whether or not caused deliberately.
Always isolate all electrical and water supplied before commencing any maintenance.
Every effort has been made to ensure details contained in this manual are correct, however, in view of
the wide range of conditions experienced in air handling systems, the information provided should only
be used as a guide. Please contact your Agent if any doubt.
CORRECT USE
ElectroVap MC humidifiers are ONLY intended for use with air handling systems or direct air
humidification. ANY OTHER APPLICATION IS NOT CONSIDERED USE FOR THE INTENDED
PURPOSE. THE MANUFACTURER CANNOT BE MADE LIABLE FOR ANY DAMAGE RESULTING
FROM INCORRECT USE.
WATER
ElectroVap MC humidifiers are designed to be used with mains, demineralized R/O or softened water.
On no account attempt to introduce any other fluid or chemical into the system. Water supply should
not exceed 6.0 bar and installation should comply with local regulations.
ELECTRICITY
All work concerned with electrical installation MUST only be performed by skilled and qualified
technical personnel (eg electrician or technicians with appropriate training). The customer MUST be
responsible for ensuring their suitability.
It is the duty of the installer to ensure that suitable sized cables and MCB protection is provided.
Please observe the local regulations concerning the provision of electrical installations.
WARRANTY
Failure to specify and fit original parts and accessories will invalidate your warranty.
NOTE
Our policy is one of continuous research and development. We therefore reserve the right to amend
without notice the specifications given in this document.
Standard(s) to which EN50081-1: 1992, EN50082-1: 1992
Conformity Is declared: EN349: 1993 EN60204-1: 1993, EN292
Parts 1&2: 1991
Manufacturer’s Name and Address
DEVATEC
Rue Saint Eloi
76550 Ambrumesnil - FRANCE
Authorised Representative
Type of equipment
ELECTROVAP MC
Model Name (s) & Series:
ELMC
Year of Manufacture
2001
We the undersigned, hereby declare that the equipment
specified above conforms to the above Directive(s) and Standard(s).
Signature :
Nom : MAZIRE Michel F
Fonction : President
Date : 20.09.2001
3
3
Page 5
LCD DISPLAY
ALPHANUMERICAL
ELECTRICAL DIN RAIL
QUARTER TURN
DOOR FASTENER
TAG
IDENTITICATION
POWER LAMP
INLET VALVE
COMPONENTS
CLEANABLE CYLINDER
OUTLET VALVE
Photos non-contractuelles
Page 6
ElectroVap MC
Unit wall installation
Unit mounting
Unpack the ELMC humidifier and check for any
damage.
Damage to packing and/or unit must be reported
by registered letter to carrier within 3 working days.
Provide free space all around the unit : 1 m. to 1.20 m.
(3 to 3 ft.) from the floor to the bottom of the humidifier,
1.25 m. (4 ft.) ahead and 0.60 m. (2 ft.) on the right hand
side for allowing easy access for maintenance.
Mark the mounting holes.
Drill the holes.
Insert screws or bolts appropriate for support.
Screw the screws allowing about 10 mm (3/8 in.)
for hanging the cabinet.
Hang the cabinet. Level the cabinet with a spirit level
and tighten up all the screws.
Please refer to the following pages for the water and
electrical connections.
5
5
Page 7
Water connection
Flexible hose supplied
ElectroVap MC
Installation
A fresh mains cold water service should be used to
supply the unit. The water supply must also satisfy
the following requirements.
• Water quality: 30 to 1000 µ/cm
• Water Pressure: 1-6 bar
• Water Temp: less than 40°C
The water supply connection is under bottom of the
unit. All the ELMC are delivered with a water inlet
hose (500mm long) with a female 3/4” connection to
the cold water supply.
A check valve should be located on the mains
and cold water service connection to the unit.
The inlet valve base has a basket filter see (page
n°44 part n° 3).
Softener
The water level must be between (a)
and (b) for the maximum cylinder
capacity.
D.I. water
a
The Humidifier ELMC can run with 3 different water
qualities:
TAP WATER
The water TH should be between 0 and 40° French
grade for a conductivity between 1000 and 350 µ/s.
For the maintenance frequency of the cylinder see
the maintenance curve. The ELMC incorporates a
time counter (hours, steam KG...) and shows
maintenance messages when appropriate.
SOFTENED WATER
The ElectroVap MC humidifier may be used with
softened water : 0°<TH< 2°.
IMPORTANT: Softeners must be programmed
correctly. Failure to programme the softener
correctly may lead to excessive salt concentration in
the steam cylinder. For assistance contact the
Softener Manufacturer. The use of duplex softeners
is recommended.
Reverse Osmosis and
b
Demineralised Water
The ElectroVap MC humidifier may be used with
Reverse Osmosis or Demineralised water. The
minimum water quality is 30 µ/s. On start-up with
new steam cylinder a tea spoon of bicarbonate of
soda must be added.
The water supply must be made without any
additional chemicals (chlorine, disinfectant,
ozone). Also some water qualities may generate
foam causing disturbances with the correct
control of the humidifier. Please refer to Devatec
technical services for further assistance.
6
6
Page 8
ElectroVap MC
DIMENSIONS
A
1
C
B
a
E
LMC 15-20-30
Dimension Steam Steam Weight Weight
mmoutlet drain empty kg full kg
A5451 135 a 1352237
B675
C270
D465
E505
F40
G110
H525
I20
E
LMC 5-8-10
Dimensions Steam Steam Weight Weight
mmoutletdrain empty kg full kg
A4701 115 a 1151523
B540
C215
D425
E425
F20
G110
H380
I20
ø
6
ø
6
Unit mounting
F
D
E
G
H
12
ab
E
LMC 90
Dimension Steam Steam Weight Weight
mmoutlet drain empty kg full kg
A10701 14 0 a 1404590
B6752 275 b 275
C2703 275 c 275
D990
E1030
F40
G110
H525
I20
E
LMC 40-50-60
Dimension Steam Steam Weight Weight
mmoutlet drain empty kg full kg
A8401 140 a 1403060
B6752 300 b 300
C270
D760
E795
F40
G110
H525
I20
123
I
7
abc
66
Photos non-contractuelles
Page 9
g = 25
ElectroVap MC
g = 25 ou 40
g = 3 x 40
Steam output
Installation
Use steam hose from our supply only.
This steam hose is able to withstand 100°C.
The humidifier should be located within 3m of the
steam distribution pipes if hose is to be used. If
the humidifier is located higher than 3m from the
steam distribution pipe/s, insulated copper tube
should be used.
The maximum recommendable length for steam
pipe, including elbows, is 6m.
IMPORTANT:
1 elbow = 1 m equivalent length of steam pipe.
There should be NO HORIZONTAL RUNS of
steam hose or pipework. All steam pipework
must fall either back toward the unit or toward the
steam distribution pipe at an angle of 15°C to
prevent condensation being trapped.
a - Vertical rise at least 500mm before the bend
b - The steam hose should be rigidly supported
c - Steam hose (radius of bend superior to 300
mm)
d - Duct work
e - Obstacle
f - A condensate separator is needed at this point
to drain condensate . Steam hose connection
g – Steam hose : make a radius of bend of
diameter 200mm with the condensate hose
(siphon)
h – Condensate hose
i – Humidifier height
g = 2 x 25
Radius of bend
ø 25 mm = 250 mm (minimal)
ø 40 mm = 400 mm (minimal)
Number of steam outlet
ELMC 5-8-10-15 = 1 x ø 25 mm
ELMC 20-30 = 1 x ø 40 mm
ELMC 40-50-60 = 2 x ø 40 mm
ELMC 90 = 3 x ø 40 mm
Permissible duct pressure (P) for a correct
working :
-P inferior to 150 mm water column
For pressures between 150 and 300 mm water column,
our optional filling cup platform mus
t be used.
8
8
Page 10
X = 100 mm
Y = 130 mm
ElectroVap MC
Condensate outlet
Installation
The following drawings show the water draining
connections that should be made.
Connection to the unit by a hose draining diam25
ELMC 5-30: 1 m hose with 3 hose clamps
ELMC 40-60: 1m+1.20m hose with 6 hose clamps.
ELMC 90: 1m+1.20m+1.80m hose with 9 hose
clamps
X = 100 mm
Y = 375 mm
X = 150 mm
Y = 550 mm
Please follow the recommendations hereafter. Drain
hose internal, diam mini
- ELMC 5/8/10/15/20/30 ø 25mm
- ELMC 40/50/60 ø 25 mm
- ELMC 90 ø 25 mm
The drain operates under gravity only. Ensure
drain pipework has a pitch of at least 15°C to
allow the unit to drain efficiently.
The Devatec recommended steam hoses should
be used for connecting the humidifier to the drain
network. Regular replacement is recommended.
The temperature of the water discharged from the
humidifier is between 60°C and 100°C. Ensure the
pipe work used is capable of withstanding such
temperatures.
The discharge hose must be free from any obstacle.
It is recommended that each steam cylinder has its
own drain pipe and tundish arrangements. This will
permit fast and easy identification of a fault within a
cylinder.
The discharged water should be offset from the
underside of the unit as shown. This will prevent
any steam and/or condensation from getting into
the cabinet.
9
9
Page 11
ElectroVap MC
Room ventilation unit
Installation
0,50 m
3 m
0,70 m
1,20 m
B
A
C
Two ventilation units permit the use of the ELMC
in direct space applications where there is no
ductwork.
The ventilation units may be top or remote
mounted. In remote mounting applications, the
distance between the ventilation unit and an
opposite wall should be no less than 3 m. Where
the output of an individual cylinder exceeds the
the capacity of a single ventilation unit, two units
should be used equally distant from the ELMC
humidifier (X). (X1=X2).
T = is suitable tee, available from supplier (see
option list). Connection of room ventilation
units to the humidifier is via terminal blocks 3
and 4 on the DIN rail (230V, 2 cores+ground).
E
F
Egout
X1
X2
15°
B
Egout
T
Model
CVMC 139019516533035
CV 2520 26035036035
Model Weight Db Max steam M3/H Compatible
CVMC 14,63510150 ELMC 5/8/10
CV 2123820300 ELMC 15/20
ABCE F
mm
mmKG KG/ST/H with model
Photos non-contractuelles
10
Page 12
See drill
template
ElectroVap MC
Steam distribution pipe
Installation
Steam from the cylinder enters the duct via a
steam distribution pipe. In order to obtain optimum
performance of the humidifier, it is recommended
that these instructions are adhered to as far as
possible.
steam distribution pipe
selection
This table shows the number and the diameter of
the pipe(s) per unit.
ELMC model5-8-10-1520-3040-50-6090
Number of
pipes
Diam. Stea m
condensate
1123
25
8
40
8
40
8
40
8
Short steam pipe B110
For the ductwork of widths less than 300 mm,
shorter distributor, ref. B110 is available in either
diameter.
Where multi-cylinder units are used, it is
recommended that the steam distribution pipes of
differing lenghts are used, Positioned them as
indicated below.
L = length 290 - 590 - 790 - 1000 - 1250 - 1500
mm.
S = hole for support, if necessary ø 5 mm.
K = cut-out for insertion into the duct (see
template).
R = 4 holes ø 5 mm.
H1 = 140 mm mini
H2 = H1 + 140 mm mini
H3 = H2 + 140 mm mini
H4 = 300 mm mini
11
11
Page 13
ElectroVap MC
Steam pipe positioning
Installation
Positioning the recommended template
profile for cut-out in DUCT/AHU (at the end
of the brochure)
A minimum distance of 300mm between the
center of the steam distribution pipe and the top
of the duct should be allowed. Where the
distribution pipe is installed at an angle of
between 30°C and 45°C, this may be reducted
to 150mm.
d: Minimum distance between the steam
distribution pipe and any obstacle in the duct
(filter, bend, constriction. etc) should as far as
possible, be no less than 2000 mm.
In the case where a steam pipe is installed after a
bend, it should be positioned in the main air flow.
In vertical ducts where air flow is upward or
downwards, the steam distribution pipe should be
mounted at an angle of 15°C from vertical.
12
Page 14
0
0
ElectroVap MC
Calculation of the evaporation distance
Installation
In order to determine the evaporation distance, the
enclosed calculation table can be used with :
RH1 = relative humidity of the air before humidification
Before or after ventilation area
After expansion or before constriction
Vapor trail = 0.5 D
Before control sensor allow
3 – 5D for evaporation
RH2 = Relative humidity of the air after humidfication in %
RH Max = maximum difference between RH1 & RH2
HOW TO USE THE CALCULATION
TABLE
Determine the difference between the relative humidity
after the humidification (RH2) and the relative humidity
(RH1) before humidification. The intersection between the
deducted maximum RH value and RH2 gives the
evaporation distance in meters (or in inches).
The tables show the D distance (in meter/inches) that
should be between the steam pipe and the first obstacle
(s.a. pipe positioning drawings on the lelft hand side).
If the require distance cannot be obtained on site, it is
possible to install two pipes in parallel to have a better
steam distribution.
NOTA : the evaporation distance shown in the
enclosed tables are for temperature between 10°C (50°F)
and 25°C (77°F) and for an air velocity of 2.5 m/s (8.20
ft/s).
If accurate values cannot be reached, a distance of 2 m.
(78 ft) should be considered as a minimum distance
between pipes & obstruction.
Before / after filter depending on filter type
VAPOR TRAIL IN METER / RH MAX=RH2-RH1 in %
4
13
13
----
---
--
--
-
-
APOR TRAIL IN INCHES / RH MAX=RH2-RH1 in %
11.8 15.7 19.7 23.6 27.5 31.5
4
15.7 19.7 23.6 27.5 31.5 35.4 39.4
50
15.7 19.7 23.6 27.5 35.4 39.4 43.3 47.2
60
19.7 23.6 27.5 35.4 39.4 47.2 51.2 59
19.7 27.5 35.4 39.4 47.2 55.1 63 70.8 77.7
80
23.6 31.5 39.4 47.2 55.163 70.8 77.7 90.5
85
27.5 39.4 47.2 55.1 67 77.7 90.5 98.4
90
39.4 55.1 67 77.7 98.4
95
114.2
----
---
126
137.8 153.4 169.3
--
--
-
-
110.2 118.1
Page 15
ElectroVap MC
Optional temperature control sys
tem
INSTALLATION
For sanitation : this system holds the water in the cylinder at a temperature of 65°C
(150°F) to prevent bacteria or mold from forming in the cylinder if there is no humidity
demand.
For fast boiling : when there is a demand for humidity, the water boils more quickly than
with cold water. This produces a faster response to the humidistat and more accurate
control.
For freeze protection : can prevent freeze-up if the humidifier is subject to cold
environments. (Additional protection required for the water feed and drain lines). The
optional temperature control system overrides the automatic pre-set draining time where
the cylinder(s) is (are) drained after x hours of stop.
Note : the humidifier temperature must be switched on for this system to operate.
Set supplied in parts :
T° sensor, X4 connector, stainless steel tube x
Ø40mm or Ø25mm (according to ELMC model) &
clamps.
300mm
The electrical wiring of the temperature sensor is
made on terminals n° 15 & 16 of the X4 connector of
the main board ref : 500100/03.
For boards with reference inferior to 1_22963
(programm : V2-11-), a 5,11 K.ohm resistance should
be put between terminal 15 & 17 of the X4 connector.
X4
17
16
15
14
Page 16
ElectroVap MC
Electrical installation
15
x All works concerned with the electrical installation must be carried out by
skilled and qualified personnel (eg electrician with appropriate training). The
customer is responsible for ensuring their suitability. Please observe local
regulations concerning the provision of electrical installations.
x After about 50 hours of operation, all the screws of the power terminals must
be retightened.
x Take care : the ELMC electronic components are very sensitive to electrostatic
shocks. Appropriate steps must be taken before any operation.
14
Page 17
ElectroVap MC
p
Connection of the unit and its options
Electrical installation
Connection for ventilation units
(terminal block 3-4).
Connection to mains.
Connection to ground
Connection to on/off hygrostat
(safety & room ventilation unit)
(Terminal block 1-2).
This allows the selection of the suitable
regulation. Configure dip switch S1 as
follows :
Devatec sensor 0-10 V
0-10 V/2-10 V regulator
0-5 V sensor
1-5 V sensor
4-20 mA sensor
0-20 / 4-20 mA regul.
Ɣ
ƔƔ Ɣ
ƔƔ
ƔƔ
ƔƔ
ƔƔ
Red lamp of
High water level
0-20 V regulator
4-20 v regulator
Terminal block X5 : connect the control
signal wires here (pins 19 & 20)
! Mind the
olarities
Ɣ
ƔƔƔ
1 2 3 4
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
16
Page 18
ElectroVap MC
Steam capacity
Electrical installation
The 2 tables under indicate the nominal value of the steam capacity in steam Kg per hour, the
electrical power and the intensity according to the different power supplies.
886.0215.38.88.58
10107.5232.719.11110.610
151511.328.716.515.915
20201538.22221.220
303022.62 x 28.7 3331.830
404030.12 x 38.2 2 x 22 2 x 21.2 2 x 20
505037.63 x 31.9 2 x 27.5 2 x 26.5 2 x 25
606045.13 x 38.2 2 x 33 2 x 31.8 2 x 30
886.027.66.15.95.1
10107.529.67.67.36.4
151511.314.311.5119.6
20201519.115.314.712.7
303022.628.722.92219.1
404030.12 x 19.1 2 x 15.3 2 x 14.7 2 x 12.7
505037.62 x 23.9 2 x 19.1 2 x 18.3 2 x 16
606045.12 x 28.7 2 x 22.9 2 x 22 2 x 19.1
909067.73 x 28.7 3 x 22.9 3 x 22 3 x 19.1
This table enables to determine the steam quantity produced by the ELMC according to the
intensity measured.
2x230 V 3x230 V 3x400 V 3x415 V3x440 V 3x460 V 3x575 V 3x600 V 3x690 V
0.611.051,821,892,002,092,622,733,14
1.532.624,554,725,005,236,546,827,85
3.065.239,109,4410,0110,4613,0813,6515,69
3.676.2810,9211,3312,0112,5515,6916,3718,83
4.597.8513,6514,1615,0115,6919,6220,4723,54
6.1210.4618,1918,8820,0120,9226,1527,2931,39
7.6513.0822,7423,6025,0226,1532,6934,1139,23
8.2614.1224,5625,4827,0228,2535,3136,8442,37
9.1815.6927,2928,3230,0231,3939,2340,9447,08
9.7916.7429,1130,2032,0233,4841,8543,6750,22
11.3219.3533,6634,9237,0338,7148,3950,4958,06
12.2420.9236,3937,7540,0341,8552,3154,5862,77
17
Page 19
ElectroVap MC
Wiring Characteristics
Electrical installation
The below table indicates the electrical supply of the ElectroVap MC units. In all cases, the
control circuit must be in single phase 230V.
2 x 230 V
50/60 Hz
3 x 230 V
50/60 Hz
3 x 400 V
50/60 Hz
3 x 415 V
50/60 Hz
3 x 440 V
50/60 Hz
External
ELMC model
circuit in A
the control
protection of
Wire control
External
section mm²
circuit
the power
protection of
Kw
Power maxi in
power maxi in
522.54.317.6
822.56.7
1022.58.234.8
1522.512.2
2022.516.1
3022.524
4022.532
See drawing p 18
5022.539.9
6022.547.8
9022.5
71.6
A
3 x 460 V
50 / 60 Hz
A
power maxi in
10,56,265,7
16,59,79,38,8
20,51211,610,9
30,617,817,116,2
40,723,522,721,4
2 x 30,4 35,133,632
2 x 40,5 2 x 23,4 2 x 22,7 2 x 21,3
3 x 33,6 2 x 29,1 2 x 28,1 2 x 26,5
3 x 40,5 2 x 35,1 2 x 33,6 2 x 32
3 x 575 V
50 / 60 Hz
A
power maxi in
3 x 35,1 3 x 33,6 3 x 32
3 x 600 V
50 / 60 Hz
A
power maxi in
A
power maxi in
3 x 690 V
50 / 60 Hz
External
ELMC model
protection of
the control in A
mm²
Section of the
control cable in
External
protection of the
power circuit in A
P maxi
522.54.3
822.56.7
1022.58.2
1522.512.2
2022.516.1
3022.524
4022.532
See drawing p 18
5022.539.9
6022.547.8
9022.5
71.6
in Kw
in A
Maximum courant
5,44,44,33,8
8,46,86,65,8
10,58,48,17,1
15,512,51210,5
20,516,515,813,8
30,624,623,520,5
2 x 20,4 2 x 16,3 2 x 15,7 2 x 13,6
2 x 25,4 2 x 20,4 2 x 19,5 2 x 17
2 x 30,6 2 x 24,6 2 x 23,5 2 x 20,5
3 x 30,6 3 x 24,6 3 x 23,5 3 x 20,5
Courant maxi in A
Courant maxi in A
Courant maxi in A
18
Page 20
Electrovap MC
Electrical connections
Electrical Installation
19
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
18
Page 21
ElectroVap MC
Electrical Connection
When neutralis not available
Electrical installation
19
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
20
Page 22
ElectroVap MC
Electrical connections
Electrical Installation
Terminal blocs on
the Din rail
Connection onto the board
Connection onto the board
Connection onto the board
21
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
Page 23
ElectroVap MC
Wiring cables for remote Information system
Electrical installation
21
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
22
Page 24
ElectroVap MC
The ELMC steam humidifiers can be run as a master and slave system. You have to connect the regulator
signal on (Connector x5 terminals 18-19-20) and servo control (terminals 1-2) to a master unit ( ex: the closer to
the regulation system ) and to send back this wiring on the other units (slaves).
IMPORTANT:
All the units must have the remote circuit board built-in.
WITH A REGULATION 0 – 10 V
With a 0-10V signal, the number of the units is limited by the regulator power only.
High level safety
-
Régulator
0 – 10 V
+
All the units must be to set in 0 – 10 V
regulation signal ( dip-switch S1 and
software 0 – 10 V)
The output signal must be connected
on all units to connector x5 (terminals
19 and 20) on the main board.
1
2
O 18
O 19
O 20
O 36
O 37
Ref 100501/05
1
2
O 18
O 19
O 20
X5
X5
X22
master
Dip-switch S1 0 – 10V
S1
1 2 3 4
Regulator selection
REGULT 0 – 10 V
SLAVE 1
Dip-switch S1 0 – 10V
S1
1 2 3 4
on
on
Terminal block 1-2 of the master unit
must be connected and terminals 3637of connector x22 to terminal 1-2 of
the slave unit and so on. Should a unit
fail, all the units are stopped.
23
O 36
O 37
Ref 100501/05
To terminals 1 and 2 of the following slave
unit ( 0 – 10 V commissioning )
X22
Regulator selection
REGULT 0 – 10 V
Page 25
ElectroVap MC
With a regulation 0– 20 V
The wiring diagram is the same as that of a 0 – 10 V regulation.
Only dip-switch S1 ( 0 – 20 V ) should be set on and the software ( code 2.3.4 ) "CHOICE REGULATION "
adjusted for "REGULT 0 – 20 V"
WITH A REGULATION 4 – 20 mA
With a signal 4 – 20 mA, only one slave unit can be run because the power regulator is not powerful enough to
supply all links
The master unit must be commissioned in 4 – 20 mA and the slave 0 – 10 V to save energy.
High safety limit
-
Asservissement
REGULATOR
4 – 20 mA
+
-
Ref 100501/05
O 18
O 19
O 20
O 36
O 37
1
2
X5
X22
1
2
Dip-switch S1 4 – 20mA
S1
1 2 3 4
Regulator selection
REGULT 4 – 20 mA
SLAVE 1
Dip-switch S1 0 – 10 V
MASTER
on
The output signal from the
regulator must be connected to all
unit on terminalq 19 and 20 of
connector x5 ( + in 20 & – in 19 )
Terminal block 1-2 of the master
unit must be connected and
terminals 36-37of connector x22 to
terminal 1-2 of the slave unit and
so on. Should a unit fail, all the
units are stopped.
O 18
O 19
O 20
X5
Ref 100501/05
S1
1 2 3 4
1 2 3 4
Regulator selection
REGULT 2 – 10 V
on
24
Page 26
ElectroVap MC
ELMC 5-2 wiring diagram
Electrical Installation
25
Application date : 06-11-06
From unit S/N : 100120
Through the door
Through the divider
Through unit depth
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
Page 27
ElectroVap MC
ELMC 5-3 wiring diagram
Electrical Installation
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
26
Page 28
ElectroVap MC
E
LMC 8-10-15-20 WIRING DIAGRAMS
Electrical Installation
27
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
Page 29
ElectroVap MC
ELMC 30 wiring diagram
Electrical Installation
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
28
Page 30
ElectroVap MC
ELMC 40 wiring diagram
Electrical Installation
29
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
Page 31
ElectroVap MC
ELMC 50-60 wiring diagram
Electrical Installation
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
30
Page 32
ElectroVap MC
ELMC 90 wiring diagram
Electrical Installation
31
All works concerned with electrical installation must be carried
out by a skilled and qualified personnel.
24
Page 33
Electrovap MC
Final inspection prior to commissioning
Installation
General
1. Visualy inspect the entire installation for loose or unconnected
cables and for any disconnected pipework.
2. Check the steam cylinders are located correctly in the drain
valve.
3. Check electrode cable connections on the top of the steam
cylinder/s.
4. Inspect all pipework including internal hoses in the humidifier
for any disconnection or leaks.
5. Before making the final connection to the humidifier, flush the
water pipework to waste to remove any dirt, debris, or flux.
Electrical supply
1. Check all power supply cables including neutral and ground
are correctly secured in appropriate terminals.
2. Check operation of local isolators.
Controls
1. Check that the control options have been wired correctly and
secured in appropriate terminals.
2. Check that the correct dip switchs setting have been made for
the control signal being used.
Note: If no safety control interlocks have been fitted to terminals
1&2, a link will be required to enable commissioning.
3. Check the polarity of the control signal.
Water Supply
1. Inspect and check operation of isolating valve and non-return
valve on water supply to the humidifier.
2. Measure and keep a record of water pressure to the
humidifier.
3. Measure and keep record of the feed water quality to the
humidifier. This should include: a) Conductivity (micro
Siemens/cm) b) Hardness (mg/L)
Drain
1. Inspect the drain installation to ensure the following :
a) each steam cylinder drains into its own individual tundish.
b) the tundish/s and drain pipework are of the correct size.
c) the tundish/s is/are offset and not located directly under the
unit.
26
32
Page 34
Electrovap MC
Final inspection continued
Installation
Steam Distribution Hose/Pipe
1. Inspect the steam distribution pipe and ensure there are no
horizontal runs.
2. If flexible steam hose is used check the overall length is less
than 3m.
3. If copper pipe is used check the effective length is less than
6m..
4. Check the steam distribution hose/pipe is the correct size.
5. Inspect the flexible steam hose fittings and ensure they are
secured and they will prevent the hose from sagging..
6.Check copper pipe is insulated.
7. Check there is at least 500mm of straight steam hose on the
outlet of the humifier.
8. Check hose clips have been fitted and secured.
Steam Distribution Pipe
1. Check the location of steam distribution pipes have been
positioned in accordance with the dimensions shown in the
installation section.
2. Check that steam distribution pipes have been positioned in
accordance with the dimensions pipes over 290mm long have
been supported adequately.
Condensate Hose
1. Visually inspect the condensate hose to ensure the
following:
a) The condensate hose is secured firmly to the condensate
outlet on the steam distribution pipes.
b) There is a trap in the condensate hose.
c) There is a fall of 45° away from the steam distribution pipe.
d) The condensate hose ends to waste waters.
FAN DISTRIBUTION UNIT
1. Check the correct clearances have been observed around
the unit.
2. Check the correct electrical connection has been made
inside the humidifier electrical connection.
33
27
Page 35
ElectroVap MC
Front panel identification
Software assistant
Alpha digital display
Changing program
Scrolling program
Scrolling program
Manual draining
Steam production light
ON/OFF Switch
Power light
Identification tag
30
34
Page 36
ElectroVap MC
ELMC commissioning
Software assistant
Checking and Switching on
1 - After completion of the installation inspection,
switch on the water supply to the unit.
2 - Switch on the main power supply.
3 - The power lamp must be illuminated.
4 - Switch on the main power supply I/0 on I.
The display will default to show the rate of steam
produced.
The ELMC unit offers 3 main menus:
.
USER INFORMATION
The User Information menu (Humidifier Status)
provides information on the operation status of
the unit. No parameter can be changed from
within this menu.
35
HUMIDIFIER CONDITION
(Humidifier Configuration) menu provides
information only regarding the unit set up. No
parameters can be changed from within this
menu.
CHANGING PARAMETER
The changing parameter System menu
allows all operating parameters to be
adjusted. An access code is required to gain
entry (2 3 4).
34
Page 37
ElectroVap MC
V
A
V
Menu user information
Software assistant
Roll up or down the menu in pushing on keys
This shows the ELMC model
This shows the Amps consumption
If external proportional regulation
If regulation :
ON/OFF
2 steps
3 steps
4 steps
ACTUAL CONTROL
SIGNAL Y : XX
Signal of the regulation in case with an
external regulation
, press the select button
MENU
HUMIDIFIER STATUS
STEAM HUMIDIFIER
ELMC XX 3X400
STEAM PRODUCED
ACTUAL CURRENT
If proportional regulation incorpored + sensor
Alpha digital status
SET POINT : %
RH MEASURE : %
Indicates the Rh from the sensor in case
of incorporated proportional + Devatec
sensor
to change menu.
This indicates the nominal steam
production of the ELMC
This shows the steam demand in the
installation from 20 to 100 %.
NO
YESNO
Display indication
In the menu : changement parameter system, if the selection option is yes or no T°C will be at 65°C.
Display indication
WATER TEMP. KEPT
STEAM DEMAND %
YES
In the menu : changement
parameter, if yes or no has been
selected (draining if long stop).
OR
TEMP. SENSOR
°
MISSING
DRAINING AFTER XXX HR STOP
36
Page 38
ElectroVap MC
g
/V
Menu user information
Software assistant
Roll up or down the menu in pushing on keys , press the select button to change menu.
This indicates the steam production
between the two maintenance periods
These indicate the number of kg
produced between two maintenance
This shows the power consumed by the
ELMC in KW
PRODUCT BEFORE
1
CLEAN KG
NEXT SERVICE DUE
2
H
HOUR METER
3
H
STEAM METER
4
KG
MINERAL
CONCENTRATION
ELECTRICAL POWER
KW
This indicates the steam production time
before maintenance – it allows to plan
the cleaning intervention
These indicate the time running period
between two maintenance periods
This indicates that the water is normally
concentrated or bein
concentrated
37
1-2
3-4
Back to the first menu page
The counting up (Hr or Kg/St). To 0, the display indicates
“Maintenance: drain valve + Cylinder”.
The reset of the counting up is made by pushing on the drain buttom.
The time counter and steam can be reseted in pushing on drain
buttom following up to push on the changing program push buttom.
Page 39
ElectroVap MC
g
V
Menu humidifier status
Software assistant
Scroll the menu up or down by pushing on
This Indicates all possible control modes
that can be used:
ON/OFF, 2-3-4 steps, proportional :
(0-10V, 0-20V, 0-20mA, 1-5V, 2-10V,
4-20mA, Sensor (Devatec, 0-10V, 0-5V,
4-20ma), slave regulation.
keys, press the select buttonto change menu
HUMIDIFIER
CONFIGURATION
CONTROL SIGNAL IN
0/10
TOTAL STEAM PROD.
KG
TOTAL STEAM
PRODUCED HR
TOTAL HOURS RUN
XX H
Total steam production since
the commissionin
Diposable cylinder
Tap water (EV), soft water (EA), DI water
(ED), cleanable cylinder, tap water (EV),
soft water (EA), DI water (ED)
This indicates the maximum electrical
power needed for the ELMC.
WATER QUALITY :
CYLINDER USED :
POWER SUPPLY (V)
MAXIMUM POWER
INSTALL KW
Back to the first menu page
Water used: tap water (EV)
Soft water (EA), partial DI water, DI
water (ED), supplying the unit.
Indicate the voltage selected for the
power circuit.
32
38
Page 40
ElectroVap MC
y
Menu configuration changing
Software assistant
Scroll the menu up or down by pushing on keys
With the humidifier switched on, press the
key until the Change System Parameters
menu is displayed. Press thekey and the
first digit will flash. Using the and key
enter the first digit of the access code and
press to confirm, The next digit will start to
flash. Repeat for a second and third digit of
the access code.
Access Code = 234
If proportional control
incorporated + senso
, press the select button
Menu : CHANGING UNIT
CONFIGURATION
DIAL ACCESS CODE
XXX
Enter your access code
CONTROL SIGNAL IN
STEAM CAPACITY LIMIT
If ON/OFF, stepped or external
r
proportional control is used.
Unit supplied in ON/OFF control –
An upgrading kit to proportional
control is also available.
This allows to restrict the steam
production capacit
ADJUST SET POINT
ADJUST PROP BAND
This allows to set the time estimated
before cylinder maintenance.
Alpha digital status
%
MAINTENANCE FREQUENCY
KG/S
MAINTENANCE INTERVAL
FOAM /SCALE CONTROL
This allows to set the quality
of steam estimated before
maintenance of the cylinder
This enables to set the time of a small
drain at each time the unit takes water
39
35
Page 41
ElectroVap MC
X
Menu configurations changing
Software assistant
Scroll the menu up or down by pushing on keys, press the select buttonto change menu.
This selects how unit responds to the
variations in control signal - if evaporation is
selected water is boiled off in response to a
decrease in the control signal. This is best
used on units supplied with water of low
conductivity. If draining is selected the water
in the cylinder is drained as the control
signal decreases. This might be used with
water of hight TDS or where close control is
required.
This enables to give a number to the ELMC
when drived by an automate or GTC.
POWER OFF IF
DRAINING YES
ADJUSTMENT STEAM BY :
EVAPORATION DRAINING
CYLINDER SELECT
CONFIGURATION
IDENTIFICATION OF ELMC
SPEED DATA
9600 b/s
SETTING TEMP °C
WATER 65°C X/
This allows to switch the contactor off
when draining, avoiding current
leakage.
This selects the suitable cylinder
(disposable / cleanable for tap water,
soft or DI.)
This is the speed of the computer
when RS422 or 485 is used. Protocol
jbus or Mod bus.
The unit will drain if there is no
demand for humidity after the
selected time,
Factory setting : Yes
Option : Yes/No
This allows the time for the
above to be selected,
Factory setting : 72 hr
Options : 12-168 hr in 12 hr
intervals
Indication on the alpha digital display
DRAIN AFTER SHUNT
DOWN
YESNO
Indication on the alpha digital
display
DRAIN AFTER
HR
Back to the first menu page
36
40
Page 42
ElectroVap MC
ElectroVap MC
ElectroVap MC
Electrical features
Electrical features
Electrical features
Software assistant
P ALERTS TROUBLECAUSES / ACTIONS OPTION
P0 ALERT
P1 ALERT
P2 ALERT
P3 ALERT
P4 ALERT
P5 ALERT
A power phase is missing
Unit on steam demand
and contactor still on
Idle demand and
contactor still off
Inlet valve constantly
open
Cylinder is not filling
correctly
Cylinder not draining
correctly
Check power supply, fuses
or power circuit breaker
(general power switchboard)
F1 fuse (2A) or contactor
coil failure.
CHANGE FUSE OR
CONTACTOR
CHANGE CONTACTOR Standard
Check correct water inlet
pressure (1 to 6 bar).
CHANGE INLET VALVE
Water supply failure or low
water pressure. Drain valve
failure.
CHANGE INLET VALVE –
CLEAN DRAIN VALVE
Blockage at the drain valve.
Drain valve coil failure.
CLEAN or CHANGE DRAIN
VALVE – REPLACE COIL-
CHANGE or CLEAN
CYLINDER
Power phase
detection device is
required
Standard
Standard
Standard
Standard
P6 ALERT
35
41
Water leakage in cylinder
part
Cylinder leaking at the
gasket.
CHANGE GASKET or
CYLINDER
Water leakage
detection device is
required
Page 43
ElectroVap MC
Cylinder maintenance
Maintenance
The ElectroVap ELMC is delivered with disposable cylinder(s) in standard which
can be replaced by cleanable ones, however, without any modification, according
to the choice of the user. Drain the steam cylinder using the manual drain key.
When the cylinder is fully drained switch off the unit and isolate the power. The
steam cylinder may be very hot. Allow it to cool down before removing.
Remove front panel from the humidifier to access the cylinder compartment.
Disconnect the steam hose from the top of the steam cylinder. Remove power and
high water level electrodes from top of the steam cylinder.
Lift the cylinder upwards until it is clear of the drain valve. Ensure that the gasket
remains in the drain valves. The disposable cylinder will be merely replaced by
new ones.
Cleanable cylinder:
Mark the edge of the cylinder halves so the can be matched up when
reassembled.
Note:
The constant heating and cooling of the cylinder may cause distortion.
Consequently the cylinder halves must be assembled in the same relative position.
Remove nuts and bolts around the centre of the cylinder. Open up cylinder. It is
important that the strainer in the bottom half of the cylinder is also cleaned.
Clean the electrodes by scraping off the mineral deposits. Alternatively, this can be
done using weak descaling solution. Rinse the electrodes and the body of the
cylinder. IT IS IMPORTANT TO AVOID DISTORTION THE CYLINDER IN
ATTEMPTING TO REMOVE ANY MINERAL DEPOSITS FROM IT. Relocate the
strainer in the cylinder base. Replace the cylinder gasket on the rim of the bottom
half of the cylinder and then locate the upper half of the cylinder on the gasket,
TAKING CARE THAT THE MARKS ARE ALIGNED. Refit the nuts and bolts.
Clean the O-ring on the drain valve and if necessary, change it. (every 2-3 cylinder
cleanings). Locate the steam outlet of the cylinder in the retaining clip.Position the
base of the cylinder over the drain valve and push downwards. Reconnect the
power cables.
General:
The humidifier requires regular maintenance to ensure efficient operation and to
prevent breakdown.
The exact maintenance frequency is variable and will depend on water quality,
hours run and level of demand for humidification.
New installations should be inspected / serviced every 2 to 4 weeks. This may be
too frequent, but it will enable a suitable maintenance routine to be established.
Routine inspection:
The following is a guide to work that should be undertaken in a routine inspection.
1 - Inspect water and steam installation for leaks and damage.
2 - Inspect electrical installation for any loose cables and or damages.
Components.
3 -Inspect the steam cylinder for scale deposits. If the scale in the cylinder ishalf way up the stainer in the lower half of the cylinder it should be replaced / cleaned (see changing steam cylinder).
4 -Inspect the inlet valve. The drain valve may become blocked with scale from the steam cylinder. This will cause water to continually run to drain.
36
42
Page 44
ElectroVap MC
Maintenance guide of the cleanable
cylinder for tap or hard water
X= humidifier steam output in kg/h
Maintenance
Working hours
¾ The water tightness is indicated in French grade, the said value is the water hydrotimetric
content (TH).
¾ The water quality is to be mentioned on your request so that to fit the most appropriate steam
cylinder for the best working of the humidifier.
Lenght of the genuine stainless steel electrodes :
ModelELMC 5ELMC 8-10ELMC 10 single phELMC 15 to 90
Length (mm)135110270250
During cylinder maintenance, it is recommended to measure the length of the electrodes.
The latter should be replaced when the length is shorter than 1/3 or 1/2 of the original
length (s.a. above table).
36
43
Page 45
ElectroVap MC
e
m
e
t
e
m
e
Valves maintenance
Maintenance
Drain valv
To be made at each cylinder
maintenance
aintenanc
Drain the steam cylinder fully and remove it from the
humidifier. Isolate power and water supply before
attempting to carry out any maintenance.
• Remove the cap from, the end of the solenoid valve 1
• Remove the coil from the valve stem 2
• Unscrew and remove the valve steam from the valve
body 3
• Clean the valve stem with fresh water 3
• Clean the valve seat and the piston (taking care not to
loose the spring 7
• Remove the O ring and drain valve collar from the top of
the valve body 4
Note
Grease the O ring with high temperature silicone
grease before replacing. Remove the filling cup hose from
the valve body. Remove the two screws that secure the
valve body to the drain cup 5. Remove the drain valve
body from the drain cup and rinse with clear water
ensuring any scale deposits are removed. Pay particular
attention to the piston seat 6. Assemble in reverse order.
Inle
To be made every six months
valv
aintenanc
Drain the steam cylinder fully and remove it from the
humidifier
Isolate power and water supply before attempting to
carry out any maintenance.
• Remove the water inlet hose from the valve. 1 Remove
the solenoid coil in pushing and turning 2
•Remove the basket filter from the base of the valve with a
pair of long nose pliers. 3
•Wash the basket filter under clean water to remove any
dirt and debris. 3 Change the O ring if necessary 4
•Assembly in reverse order.
Note
Do not forget to fit the washer when attaching the water
inlet hose.
37
44
Page 46
ElectroVap MC
Follow up and maintenance file
Model : ELMC
MAINTENANCE WORKS EFFECTED
Model:ELMC
INTERVENTION
DATE
Maintenance
NEXT
INTERVENTION
45
38
Page 47
ElectroVap MC
Drilling template
46
Page 48
ElectroVap MC
Drilling template
47
Page 49
ElectroVap MC
Drilling template
48
Page 50
devatec
CS
76550 Ambrumesnil - France
Export division: tel. +33 (0)2 35 83 06 44
or +33(0)2 35 83 03 86
fax. +33(0)2 35 85 36 72 - export@devatec.com
ELMC tech Rev.6.1 - 20-02-08 edition
devatec reserves the right to change specifications
or design of the equipments described in this brochure
without prior notice.
International certification
Our units ELMC or FogSystem are listed or in conformity with:
Canada:
USA : UL
Europe : C.E.
Distributed by:
A
LR 94104-2