
STEP 3:INSTALL FIRE RATED BOLT
1.Insert bolt and use the provided screws to secure bolt.
2.3/16” x 1/2” flat head machine screws and 3/16” x 5/8” flat head,
self-tapping machine screws for metal door use.
3.5/32” x 3/4” flat head wood screws for wood door use.
STEP 4:INSTALL STRIKE HOLE PLUG
1.Insert hole plug into the 1” hole in strike door leaf.
FIRE RATED BOLT
F1000V LBR
2.Self adjusting tabs on the hole plug will lock in place to secure
the plug.
STEP 5:REVIEW INSTALLATION
1.Close both doors and verify fire rated bolt and strike hole are lined up.
2.Be sure the door gap directly in front of the fire rated bolt is not covered with a door edge guard or
any other similar type of device.
REMARKS:
1.Refer to F1000V devices Installation Instructions for further details.
2.Before installing head cover,insert head cover plug into bottom side of head cover first.
INSTALLATION INSTRUCTIONS
A
IDENTIFICATION OF PARTS
HEAD COVER PLUG
STRIKE HOLE PLUG
(FOR STRIKE DOOR)
PLASTIC CAP
BOLT
HEAD COVER PLUG
(Packed with LBR device)
HEAD COVER
HEAD COVER PLUG
INSTALLED
3/16” x 1/2”
FLAT HEAD
MACHINE SCREWS
B
TOOLS REQUIRED
FLAT HEAD,SELF TAPPING
3/16” x 5/8”
MACHINE SCREWS
5/32” x 3/4”
FLAT HEAD
WOOD SCREWS
METAL
5/32”3/16”-24
2017.04

C
IMPORTANT NOTES - READ BEFORE INSTALLING
1.The bolt will keep the doors in alignment during a fire when the pin extends from the bolt case into the strike hole in
the opposite door.For the pin to extend into the strike hole,the plastic cap visible on the face of the bolt and the strike
hole plug must melt.Therefore,do not cover the door gap directiy in front of the bolt with a door edge guard or any other
similar type of device.
2.A double door application consists of two LBR devices and one fire rated bolt.The fire rated bolt should be installed in
the inactive door to maintain fire listing.
3.The fire rated bolt is only for use with F1000V LBR devices. F1000V LBR devices come with a standard top strike,
which must be utilized to maintain fire listing.
4.Refer to the F1000V devices Installation Instructions for further details on the F1000V LBR devices.
D
INSTALLATION PROCEDURES:
STEP 1:PREPARE FIRE RATED BOLT DOOR LEAF
1.Mark horizontal centerline 6”[152 mm] from the bottom of door.
2.Mark vertical centerline at center of door thickness.
3.Drill a 7/8”[22 mm] diameter by 3-7/16”[87 mm] deep hole in the auxiliary fire bolt door leaf.
4.Insert fire rated bolt in hole,keeping it parallel to face of door. Mark outline of bolt face plate and
remove bolt.
5.Chisel 7/64”[2.8mm] deep or until bolt face plate is flush with door edge.
5.The following parts and screws of F1000V device are
ROD CONNECTOR (1 PCS)
THRU BOLTS
FLOOR STRIKE ROD GUIDE (1 PCS)
(2 PCS)
not necessary
BOTTOM
LATCH
UNIT
when installing F1000V LBR device:
BOTTOM ROD
ROD GUIDE
INSERT (1 PCS)
STEP 2:PREPARE STRIKE HOLE PLUG DOOR LEAF
1.Transfer horizontal centerline from bolt door leaf.
2.Mark vertical centerline at center of door thickness.
3.Drill a 1”[25mm] diameter by 1-3/4”[44mm] deep hole in the strike plug door leaf.
[25]
1/4
[6]
C
DOOR
L
1
C
L
1 3/4
[44]
HOLE
DEPTH
[25]
C
DOOR
L
5/32 DRILL
[4]
4 PLACES
1
5/8
[16]
5/8
[16]
1/4
[6]
R1/8
[3]
1 25/32
[45]
7/8
[22]
3 7/16
HOLE DEPTH
7/64
[2.8]
[87]
C
L
1/4” x 1” (3 PCS)
ANCHOR
5/32” x 3/4” (3 PCS)
FLAT HEAD
WOOD SCREWS
(SS material)
1/4”-20P x 3/4” (2 PCS)
ROUND HEAD
MACHINE SCREWS
(SS material)
1/4”-20P x 3/4” (2 PCS)
ROUND HEAD
MACHINE SCREWS
1/4”x 1” (2 PCS)
ROUND HEAD
WOOD SCREWS
(SS material)
14#x1 1/2” (2 PCS)
FLAT HEAD
SELF TAPPING
MACHINE SCREWS
8# x 5/8” (2 PCS)
ROUND HEAD
SELF TAPPING
MACHINE SCREWS
(SS material)
1/4”x 1 1/4” (2 PCS)
ROUND HEAD
WOOD SCREWS
STRIKE HOLE PLUG
DOOR LEAF
6
[152]
FROM
BOTTON
OF DOOR
FIRE RATED BOLT
DOOR LEAF