Data sheet
42" Dry Pantry
G
m
m
G
m
m
Model no:
DP1-42
(refer page 2 for metric measurements)
i
Product Dimensions
a Overall height of product
B Overall width of product
c Overall depth of product (excluding handles)
j
C
40"
DATUM: FRONT OF CABINETRY
FOR PROUD INSTALLATION
n
d
o o
PLAN VIEW
B
42"
E
q
p
DATUM: FRONT OF CABINETRY
FOR PROUD INSTALLATION
l
d Depth of front frame
e Width of front frame
f Height of outer chassis
g Width of outer chassis
h Height of inner chassis
i Width of inner chassis
j Overall depth of chassis
k Height of bottom flange
l Height of top flange
m Width of side flanges
n Depth of flange
o Width of handles
p Height of handles
q Depth of handles
r Height of door fronts
Cutout Dimensions
Overall width of cutout
Overall height of cutout
CLEARANCE: GROUND LEVEL CLEARANCE: GROUND LEVEL
0 5 10 20
FRONT VIEW
inches
Clearance Dimensions
Minimum height from ground to bottom of cutout
r
A
30 1/2"
DATUM:
BOTTOM OF PRODUCT
Fh
k
d
j
PROFILE VIEW
IMPORTANT NOTE: This datasheet shows only the proud installation option.
For full installation and clearance details please refer to our installation
manual.
INDICATES CABINETRY / PRODUCT DATUM --------------------------
INDICATES CUTOUT -------------------------------------------------------
INDICATES CLEARANCES ------------------------------------------------
DATE: 28.08.2015
IMPORTANT NOTE: Throughout this guide, dimensions may vary by ±2mm
''). Please read the installation manual for detailed information on
(3/32
installing the product. www.dcsappliances.com
Data sheet
42" Dry Pantry
G
m
m
G
m
m
Model no:
DP1-42
(refer page 1 for imperial measurements)
i
Product Dimensions
a Overall height of product
B Overall width of product
c Overall depth of product (excluding handles)
j
C
646
DATUM: FRONT OF CABINETRY
FOR PROUD INSTALLATION
n
d
o o
PLAN VIEW
B
1066
E
q
p
DATUM: FRONT OF CABINETRY
FOR PROUD INSTALLATION
l
d Depth of front frame
e Width of front frame
f Height of outer chassis
g Width of outer chassis
h Height of inner chassis
i Width of inner chassis
j Overall depth of chassis
k Height of bottom flange
l Height of top flange
m Width of side flanges
n Depth of flange
o Width of handles
p Height of handles
q Depth of handles
r Height of door fronts
Cutout Dimensions
Overall width of cutout
Overall height of cutout
741
0 100 200 400
r
CLEARANCE: GROUND LEVEL CLEARANCE: GROUND LEVEL
FRONT VIEW
millimetres
A
775
DATUM:
BOTTOM OF PRODUCT
d
j
PROFILE VIEW
Clearance Dimensions
Minimum height from ground to bottom of cutout
Fh
k
IMPORTANT NOTE: This datasheet shows only the proud installation option.
For full installation and clearance details please refer to our installation
manual.
INDICATES CABINETRY / PRODUCT DATUM -------------------------
INDICATES CUTOUT -------------------------------------------------------
INDICATES CLEARANCES ------------------------------------------------
DATE: 28.08.2015
IMPORTANT NOTE: Throughout this guide, dimensions may vary by ±2mm
''). Please read the installation manual for detailed information on
(3/32
installing the product. www.dcsappliances.com