
CedarVent™ by DCI
Installation instructions for cedar ventilation
It is important to follow each step within these instructions for proper installation of the
CedarVent™ product. Any deviation from these instructions will void any warranty writte
n
or implied by DCI Products. If you need assistance with this product installation, please
call
DCI Products Monday through Friday 8am- 5 pm est.
Our toll free number is 800-622-4455 or contact us via email
[email protected]
Benefits
• 3/8” thick, strong & cost effective solution
• Easy to cut, easy to install & non-corrosive
• Provides the necessary air for cedar to breathe behind the wall or roof surface
• Convenient 3’ foot lengths for easy handling
• Can use power nail guns, will not crush
INSTALLATION:
After the roof/wall is prepared with a vapor barrier over the decking or
plywood surface, install a strip of CedarVent™ around the perimeter1 of
the roof/wall surface.
Install CedarVent™ strips at the lower edge of the roof/wall parallel with
the ground.
Continue installing pieces, butting each piece against the other until you
reach the end.
FOR ROOFING:
Install the next parallel CedarVent™ up approximately 5” or at the next
nailing line for your cedar product that is being installed.(The CedarVent™
installs at the nail lines for your particular roof cedar product)
FOR WALL:
Cedar clapboards - Nail CedarVent™ over existing vertical studs when
installing.
For Wall shakes - Nail CedarVent™ horizontal over plywood and install
SmartRidge™ at the roof ridge for ventilation.
Your cedar roof is now properly ventilated with intake and exhaust.
1 - Perimeter CedarVent™ on walls should be 3/8” short of the corner posts and soffits to allow air to escape. For roofs, CedarVent™ can hang over
Please contact us if you would like more information regarding the various applications, usage, product safety or warranty
the 3/8” on the perimeter rake and eave areas. Please refer to diagram ***
DCI Products Inc 415 South Penn Street Clifton Heights PA 19018

CedarVent™ by DCI
Installation instructions for cedar ventilation
It is important to follow each step within these instructions for proper installation of the
CedarVent™ product. Any deviation from these instructions will void any warranty writte
n
or implied by DCI Products. If you need assistance with this product installation, please
call
DCI Products Monday through Friday 8am- 5 pm est.
Our toll free number is 800-622-4455 or contact us via email
[email protected]
Please contact us if you would like more information regarding the various applications, usage, product safety or warranty
DCI Products Inc 415 South Penn Street Clifton Heights PA 19018