Daystar KU70038BK-1 User Manual

Page 1
TOOLS NEEDED
BILL OF MATERIALS
Press or vice ( Daystar tool KU70091)
Retaining clip pliers
Floor jack
Jack stand (s) 4
Wheel chock
3/4 drive ratchet
10” 3/4 extension
13/16 wrench and 13/16 socket
7/18 wrench and 7/8 socket
Measuring tap
21mm wrench and 21mm socket
Jeep JK Products
KJ09138 3/4” Front & rear lift
KJ09137 1 3/4” Front & rear lift
KU09059 EVS Foam bump-stops
KU09060 EVS Foam bump-stops
KU70034 Ft lower control arms
KU70033 Rear upper control arms
KU70037 Rear lower control arms
KU70091 poly flex tool
KU11005 Poly lube gun
Part # Description Qty S11097 S11100
BU70037 M00492 M00494 S11085 S10617 S10135
S10212 S10205 S10818 P10027
P11183
Control arm lower 2
Rod end 2
Hardware kit 1
Bushing 4 Bushing 4
Steel Ball 4
C-clip 8
Washer 8
9/16 Bolt 4
9/16 Nuts 4
1-14 Jam nut 2
Grease 1
Thread lock 1
KU70037
2007 to Current Jeep JK control arm kit
Hells gate, Moab UT
www.Daystaproducts.com
Tech Support Contact Info
Tech@DaystarWeb.com
Phone: 623.907.0081
Fax: 623.907.0088
841 South 71
st
Avenue
Instruction Sheet P11239 2007 Daystar Products International Inc.
Page 2
Thank you for choosing Daystar Products
Daystar recommends a certified technician install this system . In addition to these instruction , professional knowledge of disassemble/reassembly proce­dures as well as post instructions checks must be known. Attempts to install this system without this knowledge and expertise may jeopardize the integrity and/or operating of the vehicle.
Please read all the instructions before beginning the installation. Check the kit hardware against the parts list. Be sure you have all the needed parts and under­stand where they go. If anything is missing , do not proceed with the installa­tion, Call Daystar Products to obtain needed items.
As a general rule, the taller a vehicle is the easier it will roll. We strongly recom­mend , because of rollover possibility, that Seat belts and shoulder harness be worn at all times. Avoid situations where a side rollover may occur.
Braking performance and capabilities are decreased when significantly large/ heaver tires and wheels are used. Take this into consideration while driving, Also , speedometer recalibration is necessary when larger tires are installed.
Do no add, alter, or fabricate any factory or after-market parts which increase vehicle height over the intended height of the Daystar Product purchased. Mixing component brands, lifts, and/or combining body lift with suspension lift voids all warranties. Daystar makes no claims regarding lifting devices and excludes any and all implied claims. We will not be responsible for any products that are al­tered.
Product Use Information
12.
Apply the thread lock to the jam not at the wheel alignment and lube the joint at this time.
13. Check all bolt after 500 miles and at oil changes and after off
road use.
Notice to Dealer and Vehicle Owner
Any vehicle equipped with any Daystar Product must have the “Warning to driver” decal installed on the sun visor or dash. The decal is to act a constant re­minder for whoever is operating the vehicle of its uniq ue h a ndl i n g cha ract eri st i cs. INSTALLING DEALER— Its is your responsibility to install the warning decal and forward these instructions on too the vehicle owner for review and to be kept in the vehicle for service life.
After installation occurs, a qualified alignment facility is required to align the vehicle to factory specs.
Moab UT, Rusty nail
Page 3
8.
Install the Daystar lower control arm using the two 9/16 bolt per arm. With the front bolts coming from the outside in and the rear going inside out.
Front Bolt Rear bolt
9.
Tighten the bolts to 75ft lbs.
10. Repeat step on other control arm.
11. You will need a wheel alignment to the control arm to the right length.
Installation steps
Poly Flex joint assembly
1. Using a retaining clip pliers install the C-clip (1) into the Steel shell (4) then place the washer (2) into the shell (4).
2. Put a small amount of poly-lube over the poly-flex bushing (3) then install it over the steel washer (2)in the steel tube.(4)
3. Put a small amount of poly-lube over the steel ball (5) and then in-
stall it in the steel tube (4) then install the other poly-flex bushing (6 ) over the steel ball (5) .
1
2
6-M00494
5-S11085
4– ref
3-M00492
1- S10617
2- S10135
4. Using the poly-flex joint tool.( KU70091) Place the assembly (2) into the large tool (1)and the place the washer (3 ) and C-clip (4) over opened end off the assembly (2).
5. Place the small tool (5) over the washer (3) and push the 7/16 bolt (6) threw the assembly(2) and thread on the 7/16 nut.
6. With a 5/8 wrench and 5/8 ratchet on the bolt and nut tighten them down so you can install the c-clip (4) using a c-clip pliers.
7. Repeat step's on the other threaded rod end.
3 5
6
2
4
1
Page 4
Control arm assembling steps
Installation steps
1. Thread on the 1-14 jam nut (1 )onto the rod end assembly.
1
2. Thread on the rod assembly (1) into the control arm assembly.(2)
2
3. Set the length of the arm to stock length if not lifted. If lifted add
a .250 to the length over 2.0 of lift. This is only a starting length. You will need a wheel alignment to get the arms set to the right length.
4.
Raise up the jeep and place floor jacks under the frame. Place wheel chocks behind the rear wheels
5.
Remove the wheels and place the jack under the rear axel and support it.
6.
With a 21mm wrench and remove the rear lower control (3) arm bolts (4).
7.
Remove the lower control arm. One side at a time.
Center hole to center hole
Loading...