DAXOM Navidens 50, Navidens 125, Navidens 70, Navidens 145 User Manual

DAXOM boilers provide following sufficiency Gas Appliances Directive 2009/142/EEC Boiler Efficiency Directive 92/42/ECC Electromagnetic Compability Directive 2004/108/CE Low Voltage Directive 2006/95/CE
CONTENTS
1.SECURITY INFORMATIONS AND WARNINGS .......................................................................................... 4
1.1 Warnings ......................................................................................................................................... 4
1.2 Warnings .......................................................................................................................................... 4
2 GENERAL INFORMATIONS ...................................................................................................................... 5
2.1 General Information ................................................................. Hata! Yer işareti tanımlanmamış.
2.2 Giving Information to Customer While Deliver the Device ............................................................ 5
2.3 Description ...................................................................................................................................... 5
2.4 Device Dimensions .......................................................................................................................... 6
2.5 Boiler Installation Distances ............................................................................................................ 8
2.6 Inside Structure Of the Device ........................................................................................................ 9
2.7 Technical Specificitions .................................................................................................................. 10
3 INSTALLATION....................................................................................................................................... 12
3.1 Installation ..................................................................................................................................... 12
3.2 Plumbing ........................................................................................................................................ 12
3.3 Natural Gas Line ............................................................................................................................ 12
3.4 Electrical Installation ..................................................................................................................... 13
3.5 Pipe Line ........................................................................................................................................ 13
4 SAMPLE INSTALLATION DIAGRAMS...................................................................................................... 15
4.1 Heating System with Boiler ........................................................................................................... 15
4.2 Cascade Heating System Diagram with Solar System ................................................................... 16
5 PIPE IMPLEMENTATIONS ...................................................................................................................... 17
6 ELECTRICAL PROJECT ............................................................................................................................ 18
7. ACCESORIES ......................................................................................................................................... 21
8 FIRST OPERATION ................................................................................................................................. 23
8.1 Heating Mode Selection ................................................................................................................ 23
8.2 Setting Time Programme ............................................................................................................... 23
8.3 Setting Room Temperature ........................................................................................................... 23
8.4 Mannual Using ............................................................................................................................... 23
8.5 Reset .............................................................................................................................................. 23
9 MAINTENANCE ..................................................................................................................................... 23
9.1 Periodic Controls that Users Must Be Made ................................................................................. 24
9.2 Service Maintenance Prosedures .................................................................................................. 24
9.3 Maintenance Warning Codes ........................................................................................................ 25
1. SECURITY INFORMATION AND WARNINGS
1.1WARNINGS
- This user manual is inseparable piece of your device Please keep it in a place near the device that is immediately got. In case of any lost or damage, please supply new one with Isı Cihazları Company.
- DAXOM / Naviels wall hung condensing boiler must be installed by authorized person according to the closing rules.
- Boiler must not be used except production purpose. Manufacturer Company rejects responsibilities of injuries and economic damages cause from wrong installation of boiler, wrong setting or not maintenance timely.
- When you open the packet box of the device, firstly control if any damage at the device or not. In case of any problem contact with the seller company.
- Before making the installation of the device, firstly be sure that plumbing is cleaned. Dirtiness that is occurring inside the heating cycle causes low efficiency and noise operation.
- Please careful about leaving min space while making installation for interfere the system.
- Control the water level periodically from water level indicator occurs at the boiler. Indicator must be over 1 bar.
- If you observe water leakage at the boiler, close the water valve immediately and contact with authorized service.
- If the boiler will not be used for a long time, cut off the electric supply and gas inlet of the boiler. If there is freezing risk at water installation or boiler system, you need to discharge water inside the plumbing.
- Control the operation of the air conditioner of the place that the boiler is placed at regular intervals.
-Boiler is designed for using at interior place. It is not suitable for using at open environment places.
- Because of boiler is condensing type, be careful that the condensing discharge line is connected and not blocked.
- Make the authorized service maintenance your boiler at least once a year.
1.2 Warnings
- If gas or smoke smell are sensed, do not operate any electrical devices in case of gas leakage, ventilate environment by closing gas valve and contact with authorized people. Do not smoke at the environment in no sense.
- Do not touch cover of boiler with wet hands or bare foot?
- Do not certainly pull and twist or force cables connected to boiler even it is no energy.
- Freezing prevention system occurs at the boiler Because of this, do not cut off electric and close the gas valve of boiler when the external environment is cold.
- Do not absolutely start boiler cleaning before cut off main electric supply.
- Do not keep flammable or explosive materials at the boiler room.
- Do not certainly interfere safety device occurred on the boiler. Do not deactivate for short term or continuously.
-Be sure that pipe fitting is made correctly and not leak gas to the environment.
-Do not certainly operate heater without water inside plumbing.
2 GENERAL INFORMATION
2.1 General Information
-The user manual which is given with condensing boiler is inseparable piece of the device. Because of this, it must be kept carefully and it must be kept in a place near the device that is immediately got. In case of any lost or damage, it must be supplied from DAXOM Company.
Any person except authorized person or person who had education from authorized service must not interfere to device.
Considering warnings inside the manual is important for both your safety and safe operation of the device.
Device must be operated by installing stated inside the manual under necessary conditions of safety and operating. Under these conditions DAXOM trade mark boiler is less than 2 years warranty cover by Manufacturer Company.
Using the device out of its purpose, using different from conditions stated inside the manual, interfere by unauthorized person and problems which cause because of external factors such as (gas, electric and etc) are evaluated as out of warranty.
The lifetime of the device determined by Ministry of Customs and Trade is 10 years in case of obey to user instructions. In the meantime manufacturer and Seller Company obliged to meet service and spare parts of user.
The first operation and controls of boiler must be done by authorized service and product guarantee must be done. Devices which are using before doing warranty start by authorized service will be no warrantable.
2.2 Giving Information to Customer While Deliver the Device
Tell consumer about operation of the device, significant points that must be careful before operation of the system or during operation of system, importance of periodic maintenance in
terms of performance and efficiency of device and inform about maintenance agreement.
Explain user that necessary services contact information is found inside user manual.
Deliver the user manual to consumer and tell him / her that are needed to keep near the boiler.
2.3 Description
DAXOM Navidens boilers are condensing boilers that are used by installing wall are designed as heating water inside heating system with NG or LPG and also meet the need heat demand of a boiler through this water.
DAXOM Navidens condensing boilers are also enable for coupled solar energy to boiler system. On the other hand, they have necessary substructure for heating swimming pools.
There is burner inside the boiler which provides Combustion with aluminum casting hot bulb and premix technology.
There is flow meter gas valve on the boiler which determines and stops quantity of gas that obtains necessary energy for heating. There are sensors at the system for following inlet and outlet water temperatures for the aim of determination of boiler operation capacity.
On the other hand, for the aim of security control of the system there are bottom water pressure control wind pressure switch, drain valve, safety thermostat and pipe gas temperature sensor. Boilers’ ignition, flame monitoring, capacity control, safety device and operation functions occur by electronic control card. It can be operated as connected external room thermostat. By the LCD panel on the boiler information can be followed concerning to operation of the system. (Instant operation capacity, boiler inlet, outlet temperatures, etc)
2.4 Dimension of Device
Navidens 50-70
Navidens 125-145
a: Safety Valve Outlet b: Plumbing Return c: Gas Inlet d: Plumbing Exit e: Condensing Outlet f: Cable Entry
2.5 Boiler Installation Distances
Loading...
+ 17 hidden pages