Davis 6345 Installation Manual

Wireless Leaf & Soil Moisture/Temperature Station Installation Manual
For Wireless Vantage Pro2
and Vantage Pro2 Plus
The Wireless Leaf & Soil Moisture/Temperature Station (referred to in this document as the Leaf/Soil Station) can be used with any Wireless Vantage Pro2 weather station to measure leaf wetness, soil moisture, or temperature.
The following Vantag e Pro2 console station configurations can be used with the Leaf/Soil Station:
Station Type in
Console
Configuration
LEAF/SOIL Station 2 4 4 LEAF Station 2 - 2 SOIL Station - 4 4
Number of Leaf
Wetness Sensors
Number of Soil
Moisture Sensors
Number of
Temp Probes
• Only one Leaf/Soil Station can be installed as a Leaf/Soil Station per Vantage Pro2 Weather Station.
• Two stations can be installed if one is configured as a Leaf Station and the other station is configured as a Soil Station in the Vantage Pro2 console.
• Configured as a Leaf Station, the Station supports two leaf wetness sensors and two temperature probes.
• Configured as a Soil Station, it supports up to four soil moisture sensors and tem­perature probes.
Note: In any station using soil moisture sensors, the correspo nding temperatu re probe, if in stalled , will be
used for temperature compensation of the soil moisture sensor.
Tools for Setup
In addition to the components shown, you will need some or all of the following materials:
• Adjustable wrench or 7/16" wrench
• Medium Phillips Screwdriver
• Ballpoint pen or paper clip (small pointed object of some kind)
• Drill and 3/16" (5 mm) drill bit (if mounting on a vertical surface)
• Stepped Sensor Installation Tool for Soil Moisture and Temperature Sensors (rec­ommended, see page 16)
1
Components
The Leaf/Soil Station includes the following components and hardware:
Shelter
U-Bolts
1/4" Flat Washers
1/4" Lock Washers
1/4" Hex Nuts
8" Cable Ties
Leaf/Soil Station Components
Optional Sensors
The following optional sensors are available for the Leaf/Soil Station:
#8 x 3/4" Machine
#8 Flat Washers
#8 Hex Nuts
Leaf Wetness Sensor
with 40' (12.2 m) of cable
Optional Leaf Wetness Sensor (#6420)
U-Bolts
1/4" Flat
Washers
1/4" Hex Nuts
#8 Lock Washers
#8 Wood Screws
1/4" x 1-1/2"
Lag Screws
3-Volt Lithium
Battery
Screws
Soil Moisture Sensor
with 15' (4.6 m) of cable
Temperature Probe
with 15' (4.6 m) of cable
Optional Soil Moisture Sensor (#6440) and Optional Temperature Sensor (#6470)
2
Installation Steps
For ease of installation and use of your Leaf/Soil Station, please follow steps in the order presented.
• Preparing the station, page 3
• Setting the transmitter ID, page 5
• Choosing a location to mount the station, page 8
• Mounting the station, page 9
• Rules for using the sensors, page 10
• Installing leaf wetness sensors, page 11
• Installing soil moisture and temperature sensors, page 13
• Using soil moisture readings, page 17
If you encounter difficulties or have questions about your station, the following additional information may be helpful:
• Troubleshooting the sensors, page 18
• Extending Sensor Cables, page 18
• Contacting Davis Technical Support, page 19
• Specifications, page 19
• FCC W arning, page 20
Preparing the Leaf/Soil Station
The following illustrations show the location of the transmitter ID DIP switches, the battery mounting location, the modular connectors used by the leaf wetness sensors, and the terminal blocks used to connect the soil moisture sensors and temperature probes.
3
Installing the Battery
es
p
SENSOR INTERFACE MODULE
p
1. Insert the 3-volt lithium battery into the battery holder, matching the “+” sign on the battery with the “+” sign next to the battery mounting brackets.
2. Note the location of the DIP switches. You will work with them during the next installation step.
Rubber
Grommets
3-Volt Lithium Battery
-
+
SENSOR INTERFACE MODULE
Temperature Moisture
1 2 3 4 1 2 3 4
DIP Switch
Test LED
Cable Clam Screw
Cable Clamp
Cable Clam Mount
Temperature
Probe Cable
Leaf Wetness Sensor Cable
Soil Moisture Sensor Cable
Temporarily Connecting a Sensor for Testing
Temporarily connect at least one of the following sensors.
Note: You must have at least one sensor installed in the Leaf/Soil station in order to test wireless com-
munications.
Leaf Wetness Sensor Connection
• Connect the leaf wetness sensor cable to the LEAF 1 or LEAF 2 receptacle by plugging it in the proper receptacle.
Soil Moisture Sensor Connection
T emporarily connect a soil moisture probe to the SOIL 1 terminal block connector using the following instruc­tions.
1. Use a pen or small screwdriver to open the connector “jaws” as shown in the illustration at the top of the next page.
2. While the jaws are open, insert the temperature probe leads, then let the connec-
Connecting a Leaf Wetness
Sensor
tor jaws close in on the lead by removing the pen or small screwdriver.
Note: The soil moisture sensor must be moist to be used for this test. A completely dry sensor will not
register on the console.
4
Soil Temperature Sensor Connection
Temporarily connect a temperature probe to the TEMP 1 terminal block connector.
1. Use a pen or smal l screwdriver to open the connector “jaws” as shown in the illustration to the right.
2. While the jaws are open, insert the temperature probe leads, then let the connector jaws close in on the lead by removing the pen or small screw­driver.
Connecting a Soil Moisture or
Temperature Sensor
Setting the Transmitter ID
Each wireless transmitting station must be set to one of eight transmitter IDs. DIP switches #1, 2 and 3 on the Sensor Interface Module (SIM) allow you to control the ID — the “channel” the station will transmit on. (DIP switch #4 is used for trans­mission testing, not for transmitter ID.)
Note: A transmitter and receiver communicate with each other only when both are set to the same ID.
The factory default transmitter ID is ‘1’. Looking at the table below, you can see that means the DIP switches are in the OFF position when each transmitting station leaves the factory . This is true for all Davis wireless equipment.
1. Verify the transmitter ID used by your ISS, as well as all other transmitter IDs already used by your Vantage Pro2 Weather Station.
2. Configure the Leaf/Soil Station to a transmitter ID not already in use.
3. Use a ballpoint pen or paper clip to toggle DIP switches #1, 2, and 3. The settings for transmitter IDs 1 – 8 are shown in the table below:
ID Code Switch 1 Switch 2 Switch 3
(default) OFF OFF OFF
#1 #2 OFF OFF ON #3 OFF ON OFF #4 OFF ON ON #5 ON OFF OFF #6 ON OFF ON #7 ON ON OFF #8 ON ON ON
5
.
Battery Holder
ON
1234
DIP Switches
Transmitter DIP Switches in Top-right Corner of SIM
Setting Console/Receiver(s) to Same ID
1. Put your console into Setup Mode — press and hold DONE and press the down arrow (-).
The console displays the words: “RECEIVING FROM...” and “STATION
NO.” followed by the transmitter IDs that your console detects. One of these should be the ID number you just set on the Leaf/Soil Station transmitter. It can take up to two minutes to show all transmitter IDs received.
If you don’t see the station on the console screen, make sure the console is
within 10' of the transmitter, and verify that you set the DIP switches cor­rectly. Wait a few seconds and if you still don’t see it, go to “Troubleshooting Communication Problems” on the next page.
2. Press DONE to move to “Screen 2: Selecting Transmitters.”
Setup Mode – Screen 2 is where you will set the console to recognize signals
on that ID as coming from a Leaf/Soil Station.
3. Press the left (<) or right (>) arrows to scroll through transmitter IDs.
When you see the ID you chose for the Leaf/Soil Station, press the up (+) or
down (-) arrows to activate reception of that ID code. Make sure the screen shows “ON (ISS)”.
4. Press GRAPH several times to change the station type in the console from ON (ISS) to ON (LEAF), ON (SOIL), or ON (LEAF/SOIL).
Configure it as a LEAF Station if you are only using it for leaf wetness and
temperature.
Configure it as a SOIL station if you are only using it for soil moisture and
temperature.
Configure it as a LEAF/SOIL station if you are using it for both leaf wetness
and soil moisture.
5. To exit Setup Mode, press and hold DONE.
Note: See the Vantage Pro2 User’s Manual & Setup Guide: “Setup Mode – Screen 2: Selecting Trans-
6
mitters” for more information.
Loading...
+ 14 hidden pages