Danfoss Termix BTD RO MIX Operating Manual

OperatingGuide
TermixBTDROMIX
1.0TableofContents
1.0TableofContents.............................................1
2.0Functionaldescription......................................2
3.0Safetynotes.....................................................3
3.1SafetyNotes–general............................................3
4.0Mounting........................................................4
4.2Start-up..............................................................6
4.3Electricalconnections.............................................7
5.0Design.............................................................8
5.1Design...............................................................8
6.0Controls..........................................................10
6.1Heatingcircuit......................................................10
6.2DHWtemperaturecontrol........................................13
6.3Other.................................................................14
6.4Maintenance........................................................16
7.0Troubleshooting..............................................17
7.1Troubleshootingingeneral......................................17
7.2TroubleshootingDHW............................................17
7.3TroubleshootingHE...............................................18
7.4Disposal.............................................................19
8.0Declaration......................................................23
8.1Declarationofconformity........................................23
DanfossDistrictEnergy
VI.HE.F2.02/LUK40661
DEN-GT
1
OperatingGuideTermixBTDROMIX
2.0Functionaldescription
Districtheatingsubstationfordirectheatingwithtankfor domestichotwaterpreparationandwiththermostaticor electroniccontrol.Designedforoor-mounting.Connections atthetopofthestation.
Application
TheTermixBTDROMIXsubstationisacompletesolutionforhot waterandheatingsystemwithdifferentialpressurecontroland mixingloop.TheTermixBTDROMIXisapplicableforsingle-family housesorapartments.
Districtheating(DH)
Thesubstationisprefabricatedwithadifferentialpressure controller,ttingpieceandsensorpocketsforinsertionofa heatmeteraswellasstrainerandballvalves.Furthermorethe substationisdeliveredwithamixingloopincludingpump,controls andnon-returnvalve.
Heating(HE)
Theheatingcircuitisdesignedfordirectgenerationofheat.The differentialpressurecontrolsetstheoptimaloperationconditions forradiatorthermostaticvalvesinordertoenableindividual temperaturecontrolineachroom.Themixingloopcreatesa suitabletemperaturelevele.g.foroorheating.
Domestichotwater(DHW)
Thedomestichotwatercircuitconsistsofahotwatertankwithcoil andaself-actingthermostaticcontrolvalveorelectroniccontroller . Thehotwatertankandcoilareenamelledandthetankcontainsa magnesiumanode.
2
DEN-GT
VI.HE.F2.02/LUK40661
DanfossDistrictEnergy
OperatingGuideTermixBTDROMIX
3.0Safetynotes
3.1SafetyNotes–general
Thefollowinginstructionsrefertothestandarddesignof substation.Specialversionsofsubstationsareavailableon request.
Thisoperatingmanualshouldbereadcarefullybeforeinstallation andstart-upofthesubstation.Themanufactureracceptsno liabilityfordamageorfaultsthatresultfromnon-compliancewith theoperatingmanual.Pleasereadandfollowalltheinstructions carefullytopreventaccidents,injuryanddamagetoproperty. Assembly,start-upandmaintenanceworkmustbeperformedby qualiedandauthorizedpersonnelonly. Pleasecomplywiththeinstructionsissuedbythesystem manufacturerorsystemoperator.
Corrosionprotection
Allpipesandcomponentsaremadeofstainlesssteelandbrass. Themaximumchloridecompoundsoftheowmediumshouldnot behigherthan150mg/l. Theriskofequipmentcorrosionincreasesconsiderablyifthe recommendedlevelofpermissiblechloridecompoundsis exceeded.
Energysource
Thesubstationisdesignedfordistrictheatingastheprimary sourceofenergy.However,alsootherenergysourcescanbeused wheretheoperatingconditionsallowitandalwaysarecomparable todistrictheating.
Application
Thesubstationisdesignedtobeconnectedtothehouse installationinafrost-freeroom,wherethetemperaturedoesnot exceed50°Candthehumiditydoesnotexceed60%.Donotcover orwallupthesubstationorinanyotherwayblocktheentrance tothestation.
Choiceofmaterial
Choiceofmaterialsalwaysincompliancewithlocallegislation.
Safetyvalve(s)
Werecommendmountingofsafetyvalve(s),however,alwaysin compliancewithlocalregulations.
Connection
Thesubstationmustbeequippedwithfeaturesthatensurethat thesubstationcanbeseparatedfromallenergysources(also powersupply).
Emergency
Incaseofdangeroraccidents-re,leaksorotherdangerous circumstances-interruptallenergysourcestothestationif possible,andseekexperthelp. Incaseofdiscolouredorbad-smellingdomestichotwater,closeall shut-offvalvesonthesubstation,informtheoperatingpersonnel andcallforexperthelpimmediately.
Storage
Anystorageofthesubstationwhichmaybenecessarypriorto installationshouldbeinconditionswhicharedryandheated.
Authorizedpersonnelonly
Assembly,start-upandmaintenanceworkmustbeperformedby qualiedandauthorizedpersonnelonly.
Pleaseobserveinstructionscarefully
Toavoidinjurytopersonsanddamagetothedevice,itisabsolutely necessarytoreadandobservetheseinstructionscarefully.
Warningofhighpressureandtemperature
Beawareoftheinstallation’ spermissiblesystempressureand temperature.
Themaximumtemperatureoftheowmediuminthesubstationis 120°C.
Themaximumoperatingpressureofthesubstationis10bar .PN16 versionsareavailableonenquiry.
Theriskofpersonsbeinginjuredandequipmentdamagedincreases considerablyiftherecommendedpermissibleoperatingparameters areexceeded.
Thesubstationinstallationmustbeequippedwithsafetyvalves, however,alwaysinaccordancewithlocalregulations.
Warningofhotsurface
Thesubstationhasgothotsurfaces,whichcancauseskinburns. Pleasebeextremelycautiousincloseproximitytothesubstation.
Powerfailurecanresultinthemotorvalvesbeingstuckinopen position.Thesurfacesofthesubstationcangethot,whichcancause skinburns.Theballvalvesondistrictheatingsupplyandreturnshould beclosed.
Warningoftransportdamage
Beforesubstationinstallation,pleasemakesurethatthesubstation hasnotbeendamagedduringtransport.
IMPORTANT-Tighteningofconnections
Duetovibrationsduringtransportallangeconnections,screwjoints andelectricalclampandscrewconnectionsmustbecheckedand tightenedbeforewaterisaddedtothesystem.Afterwaterhasbeen addedtothesystemandthesystemhasbeenputintooperation, re-tightenALLconnections.
DanfossDistrictEnergy
VI.HE.F2.02/LUK40661
DEN-GT
3
OperatingGuideTermixBTDROMIX
4.0Mounting
4.1Mounting
Installationmustbeincompliancewithlocalstandardsand regulations. Districtheating(DH)-Inthefollowingsections,DHreferstothe heatsourcewhichsuppliesthesubstations.Avarietyofenergy sources,suchasoil,gasorsolarpower,couldbeusedasthe primarysupplytoDanfosssubstations.Forthesakeofsimplicity, DHcanbetakentomeantheprimarysupply.
Connections:
1.DHWcirculation(HWC)
2.Domestichotwater(DHW)
3.Domesticcoldwater(DCW)
4.Heating(HE)return
5.Heating(HE)supply
6.Districtheating(DH)return
7.Districtheating(DH)supply
Connectionsizes:
Allconnections:
G¾”(int.thread)
Dimensions(mm):
Withcover: H1570xW540xD640(typeBTD-MIX1) H1870xW540xD640(typeBTD-MIX2)
Weight(approx.):90-130kg
Authorizedpersonnelonly
Assembly,start-upandmaintenanceworkmustbeperformedby qualiedandauthorizedpersonnelonly.
Thepipeplacementcandeviatefromtheshowndrawing.Pleasenote themarkingsonthestation.
4
DEN-GT
VI.HE.F2.02/LUK40661
DanfossDistrictEnergy
OperatingGuideTermixBTDROMIX
4.1.1Installation
Mounting:
Adequatespace
Pleaseallowadequatespacearoundthesubstationformounting andmaintenancepurposes.
Orientation
Thestationmustbemountedsothatcomponents,keyholes andlabelsareplacedcorrectly.Ifyouwishtomountthestation differentlypleasecontactyoursupplier.
Drillings
Wheresubstationsaretobewall-mounted,drillingsareprovided inthebackmountingplate.Floormountedunitshavesupport.
Labelling
Eachconnectiononthesubstationislabelled.
Beforeinstallation:
Cleanandrinse
Priortoinstallation,allsubstationpipesandconnectionsshouldbe cleanedandrinsed.
Tightening
Duetovibrationduringtransport,allsubstationconnectionsmust becheckedandtightenedbeforeinstallation.
Unusedconnections
Unusedconnectionsandshut-offvalvesmustbesealedwitha plug.Shouldtheplugsrequireremoval,thismustonlybedoneby anauthorizedservicetechnician.
Installation:
Strainer
Ifastrainerissuppliedwiththestationitmustbettedaccording toschematicdiagram.Pleasenotethatthestrainermaybe suppliedloose.
Connections
Internalinstallationanddistrictheatingpipesconnectionsmustbe madeusingthreaded,angedorweldedconnections.
DanfossDistrictEnergy
VI.HE.F2.02/LUK40661
DEN-GT
5
OperatingGuideTermixBTDROMIX
4.2Start-up
Start-up,Heatingwithmixingloop
Start-up:
1:Pumpspeed
Setthepumptohighestspeedbeforestart-up.
2:Startpump
Startthepumpandheatthroughthesystem.
3:Openshut-offvalves
Theshut-offvalvesshouldthenbeopenedandtheunitobserved asitentersservice.Visualcheckingshouldconrmtemperatures, pressures,acceptablethermalexpansionandabsenceofleakage. Ifthesystemoperatesinaccordancewithdesign,itcanbeput toregularuse.
4:Ventsystem
Switchoffthepumpandventtheinstallationaftertheradiators havebeenwarmedup.
5:Adjustpumpspeed
Setthepumptothelowestspeedconsistentwithcomfortand electricityconsumption. Normallythechange-overswitchissetinthemidposition(default). Howeverforsystemswithunderoorheatingorsinglepipeloop systems,itmaybenecessarytoturnthechange-overswitch upwards. Higherpumpspeedsareonlyusediftheheatingrequirement increases.
Re-thightenconnections
Afterwaterhasbeenaddedtothesystemandthesystemhasbeen putintooperation,re-tightenALLconnections.
Pump
Thepumpmustbeswitchedoffduringsystemll.
Underoorheating:
Pumpstopfunction
Ifthesubstationisusedinconnectionwithunderoorheating,the circulationpumpmustbeconnectedtothepumpstopfunctionin theunderoorheatingcontroller .Thepumpmustbestoppedif allunderoorheatingcircuitsareclosed.
Warranty
Ifthisisnotpossible,thenowmustbecontinuedthroughthe by-pass.Failingthis,thepumpwillbeatriskofseizureandany remainingwarrantywillbewithdrawn.
Summeroperation:
Switchoffpump
Insummerthecirculationpumpmustbeswitchedoffandthe shut-offvalvetoHEsupplyclosed.
Runningpumpbi-weekly
Itisrecommendedtostartupthecirculationpump(for2minutes) onceamonthduringsummer;theshut-offvalveoftheHEsupply mustbeshut.
Electroniccontroller
Mostelectroniccontrollerswillstartupthepumpautomatically (pleasenotemanufacturer´sinstructions).
6
DEN-GT
VI.HE.F2.02/LUK40661
DanfossDistrictEnergy
OperatingGuideTermixBTDROMIX
4.3Electricalconnections
Beforemakingelectricalconnections,pleasenotethe following:
Safetynotes
Pleasereadtherelevantpartsofthesafetynotes.
230V
Thesubstationmustbeconnectedto230VACandearth.
Potentialbonding
Potentialbondingshouldbecarriedoutaccording to60364-4-41:2007andIEC60364-5-54:2011. Bondingpointonthemountingplatebelowrightcornermarked withearthsymbol.
Disconnection
Thesubstationmustbeelectricallyconnectedsothatitcanbe disconnectedforrepairs.
Outdoortemperaturesensor
Outdoorsensorsshouldbemountedsoastoavoidexposureto directsunlight.Theyshouldnotbeplacedclosetodoors,windows orventilationoutlets.
Theoutdoorsensormustbeconnectedtothestationonthe terminalblockundertheelectroniccontrol.
Authorizedelectrician
Electricalconnectionsmustbemadebyanauthorizedelectricianonly.
Localstandards
Electricalconnectionsmustbemadeinaccordancewithcurrent regulationsandlocalstandards.
DanfossDistrictEnergy
VI.HE.F2.02/LUK40661
DEN-GT
7
OperatingGuideTermixBTDROMIX
5.0Design
5.1Design
Yoursubstationmightlookdifferentthanthesubstationshown.
Designdescription
E
Hotwatertankwithcoil
10
Circulatorpump
27
Actuator,HE
1A
Ballvalve,DVGW
14
Sensorpocket,energymeter
41
Fittingpiece,energymeter
7
Thermostaticvalve,DHW
20
Filling/drainvalve
43
Ballvalveclosed
9
Strainer
22
Testconnection
50
Diff.pressurecontrollerwithowlimiter
8
DEN-GT
VI.HE.F2.02/LUK40661
DanfossDistrictEnergy