Installation Guide
BasicRail Wall Heating in Wet Systems
1 Installation of BasicRail Wall Heating in Wet Systems
Fig. 1: Inspection of the pipe wall. Remove unevenness and
create a flat surface.
Fig. 3: Attach the rails in three places with hollow wall
anchor-/nailed dowels and screws.
Fig. 2: Start by laying the rails vertically with a spacing of
maximum 1 m.
Fig. 4: In accordance with the laying procedure push composite
pipe into the rails from bottom to top, starting with the supply
line below.
Fig. 5: In doing so do not exceed the maximum pipe bend
length of 20 cm.
Danfoss Heating Solutions VIGHA202
Fig. 6: Drill at least 8 holes for wall dowels (70 mm) per m² and
attach bottom section of dowel.
1
Installation Guide
BasicRail Wall Heating in Wet Systems
Fig. 7: Attach wall heating metalgrid from top to bottom,
lightly tensioned with 10 cm overlap, using the dowel upper
section.
Fig. 9: Spray on the plaster in a single 35 mm layer from the top
to bottom according to the manufacturer’s instructions.
Fig. 8: After setting up the wall heating system a pressure test
to at least 6 bar according to the test report is required.
Fig. 10: The applied layer of plaster can be smoothed or
matted as required.
Danfoss A/S
Heating Solutions
Haarupvaenget 11
8600 Silkeborg
Denmark
Phone:+45 7488 8000
Fax: +45 7488 8100
Email: heating.solutions@danfoss.com
www.heating.danfoss.com
Danfoss can accept no responsibility for possible errors in catalogues, brochures and other printed material. Danfoss reserves the right to alter its products without notice. This also applies to products
already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed. All trademarks in this material are property of the respective
companies. Danfoss and the Danfoss logotype are trademarks of Danfoss A/S. All rights reserved.
VIGHA202 Produced by Danfoss Heating Solutions © 11/2010