Installation Guide
Installation of BasicGrip
1 Installation of BasicGrip
Fig. 1: Attach the perimeter insulation with tape on wall.¹
Fig. 3: Lay this BasicGrip panel in the left hand corner of the
room.
Fig. 2: Cut off overlaps on both ends of the first BasicGrip panel.
Fig. 4: Install the studded panels one over the other. Cut wall
side overlapping edges off. Cut the last panel to fit.
Fig. 5: It is possible to press studs home with feet. Fig. 6: When using liquid screed, seal off the foil strips of the
perimeter insulation with PE-string. On cement screed, the foil
is loosely placed on the studded panel.
Danfoss Heating Solutions VICTF302
1
Installation Guide Installation of BasicGrip
Fig. 7: The pipes can be laid by one person by using the pipe
dispensing wheel.
Fig. 8: Lay pipes in snail form, at first with double spacing in
order to maintain the calculated pipe distances.
Fig. 9: Lay pipes in snail form throughout the room. Fig. 10: Install expansion joint profile e.g. for door thresholds, as
shown, using the Basic movement gap strip.
¹ If additional insulation is 5 cm thick or more, attach the perimeter
insulation on the additional insulation.
Danfoss A/S
Heating Solutions
Haarupvaenget 11
8600 Silkeborg
Denmark
Phone:+45 7488 8000
Fax: +45 7488 8100
Email: heating.solutions@danfoss.com
www.heating.danfoss.com
Danfoss can accept no responsibility for possible errors in catalogues, brochures and other printed material. Danfoss reserves the right to alter its products without notice. This also applies to products
already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed. All trademarks in this material are property of the respective
companies. Danfoss and the Danfoss logotype are trademarks of Danfoss A/S. All rights reserved.
VICTF302 Produced by Danfoss Heating Solutions © 04/2011