Da-Lite Large Advantage Deluxe Electrol User Manual

INSTRUCTION BOOK FOR
Large Advantage®
Deluxe Electrol
®
Important Safety Instructions
When using your video equipment, basic safety precautions should always be followed, including the following:
2. Close supervision is necessary when any appliance is used by or near children. Do not leave appliance unattended while in use.
3. Do not operate appliance with a damaged cord or if the appliance has been dropped or damaged – until it has been examined by a qualiied serviceman.
4. Position the cord so that it will not be tripped over, pulled, or contact hot surfaces.
5. If an extension cord is necessary, a cord with a current rating at least equal to that of the appliance should be used. Cords rated for less amperage than the appliance may overheat.
Save These Instructions
6. To reduce the risk of electric shock, do not immerse this appliance in water or other liquids.
7. To reduce the risk of electric shock, do not disassemble this appliance. Contact an authorized service dealer when repair work is required. Incorrect reassembly can cause electric shock when the appliance is used subsequently.
8. The use of an accessory attachment not recommended by the manufacturer may cause a risk of ire, electric shock, or injury to persons.
2
Tools Required for Installation
#2 Phillips Screwdriver 3/4“ Open Wrench
or Socket Driver
Pre-Installation
1. Carefully unpack case from shipping crate.
2. Set aside the Installation Kit. Items inside will be used during installation.
3. Make sure to recheck measurement of case for proper installation clearance.
4. Remove any protective foam from case.
Ironing Board
5. If necessary. adjust hanger brackets with a 3/4" open wrench or socket driver.
Ironing Board
The Large Advantage Electrol includes an ironing board to latten
the fabric (long strip attached). The ironing board is part of the screen case. Do not remove. Contact Da-Lite if the ironing board is in need of adjustment. (Figure 1).
Figure 1
3
Case Installation
The case has a self-trimming lange around the bottom. Ceiling tiles or drywall may be placed on top of this lange to provide a inished
appearance.
1. The case provides multiple attachment points for bolts, cables, or threaded rod. Page 5 shows threaded rod installed. The variable position-mounting bracket may be located anywhere along the length of the case. It is recommended to keep the brackets spaced evenly enough to distribute the weight of the screen. One mounting bracket is required for every 4' of case length.
2. Tighten bolts until trim lange is lush with ceiling.
NOTE: For proper operation, screen assembly must be level
after installation.
3. Remove 2 screws to open junction box. Install electrical connections that apply to your unit. Make sure to review the wiring diagram for proper hook up. Replace junction box cover and secure with 2 screws.
NOTE:
Motor Operator Projection Screen Models LADT, LADDT, LAD and LADD must be installed in accordance with the requirements of the Local Building Codes, the Canadian Electrical Code (CEC), CAN/CSA C22.1 and the National Electric Code (NEC), NFPA 70. An appropriate disconnect device shall be provided as part of the building installation.
If your case was ordered in advance of the screen and roller
assembly, your installation is now complete. Continue to step 4 if your Large Advantage Deluxe Electrol was ordered as a complete unit.
4. Carefully remove paper and tape from roller assembly
Caution! Do not use a knife or sharp object to cut tape;
you will damage the screen. Pull orange string.
ATTENTION! Ne coupez pas le ruban adhésif sur la toile
avec un couteau ou un outil tranchant. Tirez sur le cordon orange.
5. Test installation by running screen up and down a few times. Be prepared to stop screen should any objects obstruct the movement of the screen. To prevent damage to the motor, the standard duty cycle is 1 minute on and 3 minutes of.
4
Loading...
+ 8 hidden pages