Da-Lite Cambridge Conference Cabinet User Manual

INSTRUCTION BOOK FOR
Cabinet
Tools Required Hardware Provided
Electric Drill
Masonry Bit 5⁄16" (if mounting in solid masonry or concrete)
Screw Driver, #2 Flat Tip (if using toggle bolts) or #2 Phillips (if mounting in solid masonry or concrete)
Height of Wall
Cabinet
Determine
Measurement To
Bottom Of
Wall Cabinet
Floor
two will be mounted to wall)
12 Toggle Bolts, 4 3⁄ 16"
12 Lead Shields, #1014 x 1 1⁄2"
12 Phillips Flat Head Wood Screws, #10 x 2"
Adjustment
Knobs On
Four Corners
5"
Back Of Cabinet
Wall
"V" Bar Mounted To The Back Of
The Wall
Cabinet At The
Factory
"V" Bar
Mounted
To Wall
41"
(29" for
24" x 36"
Only)
Installation Instructions
Determine the height of the top of the cabinet from the loor. Next use the above diagram to determine the placement of the top wall mounted “V” bar.
Hold a loose “V” bar to the wall at the height determined above (MAKE SURE IT IS LEVEL), and mark the locations for the screw holes.
To mount the “V” bar on solid concrete or masonry wall, drill 5⁄ 16" holes and insert the lead shields. Fasten the “V” bar to the wall using the #10 x 2" wood screws. If you are mounting to a hollow wall, drill 1⁄ 2" holes and insert the toggle bolts. Then fasten the “V” bar to the wall with the toggle bolts.
Measure from the bottom of the mounted “V” bar and mark the wall 41" (29" for 24" x 36" cabinets) down with a horizontal line. This will be the height of the bottom of the lower wall-mounted “V” bar. Using the appropriate steps above mount the lower “ V” bar.
Now set the cabinet in place on the wall with the “V” bars of the cabinet nestled into the “V” bars on the wall. At one or more
corners of the cabinet, turn the adjusting set screws in or out as necessary until the doors come into proper alignment. Open and close the doors to conirm proper operation.
For Deluxe Cabinets Only:
To extend the easel, grasp the center of the panel along the lower edge, and pull outward. When the panel reaches its fully extended position, it will lock automatically. To return the panel to the cabinet, press the small lever found along the right edge of the panel. The panel will automatically close. The telescoping easel is ready to receive paper pad chart clamps. This allows the user to use a paper pad lip chart on this panel and to lip used pages over the back of the easel. It is also possible to use multiple lip charts stacked by using accessory grip quick chart clamp 28" gold Da-Lite part number 72053.
To use the projection screen swing the projection screen bar (located at the top, center of the cabinet) out. Open the cabinet door covering the screen (at the bottom of the cabinet), pull the screen up and slip it over the screen bar. The screen bar has multiple notches to allow for keystone elimination.
2
Loading...
+ 2 hidden pages