Dahua IR Intelligent Speed Dome Installation operation manual

Page 1
IR Intelligent Speed Dome Installation Manual
Version 1.1.1
Page 2
i
1 INTELLIGENT SPEED DOME INSTALLATION .................................................. 1
1.1 Installation Environments ..................................................................................................................... 1
1.2 Check installation space and installation location intension ........................................................... 1
1.3 About cable ............................................................................................................................................. 1
1.4 Please keep all package material well for future use ....................................................................... 2
2 SETUP BEFORE INSTALLATION ...................................................................... 3
2.1 Check Accessories ................................................................................................................................ 3
2.2 Open Device ........................................................................................................................................... 3
2.3 Dial Switch Setup (Analog Speed Dome) .......................................................................................... 3
2.3.1 Initial Setup ........................................................................................................................................ 4
2.3.2 Dial Switch Setup for Intelligent Speed Dome .............................................................................. 4
2.3.3 Baud Rate and Parity Setup ............................................................................................................ 5
2.3.4 Speed Dome Address Setup ........................................................................................................... 5
2.3.5 Terminal Matching Resistance Setup ............................................................................................ 6
2.4 Dial Switch Setup (HDCVI Intelligent Speed Dome) ........................................................................ 7
2.4.1 Initial Setup ........................................................................................................................................ 7
2.4.2 Dial Switch Setup for Intelligent Speed Dome .............................................................................. 7
2.4.3 Baud Rate and HD/SD Video Format Setup ................................................................................. 8
2.4.4 Speed Dome Address Setup ........................................................................................................... 9
2.4.5 Terminal Matching Resistance Setup ............................................................................................ 9
2.5 RESET and SD Card Installation (Network Speed Dome) ............................................................ 11
2.6 Cable Connection ................................................................................................................................ 12
Page 3
ii
3 INSTALLATION................................................................................................. 14
3.1 Component Installation ....................................................................................................................... 14
3.2 Wall Mount Installation Steps ............................................................................................................ 14
3.2.1 Installation Environments ............................................................................................................... 14
3.2.2 Installation Steps ............................................................................................................................. 14
4 APPENDIX LIGHTENING PROTECTION AND SURGE PROTECTION ........ 17
5 APPENDIX ABOUT RS485 BUS ................................................................... 18
5.1 RS485 Bus Main Feature ................................................................................................................... 18
5.2 RS485 Bus Transmission Distance .................................................................................................. 18
5.3 The Problem in Practical Use ............................................................................................................ 18
5.4 RS485 Bus FAQ .................................................................................................................................. 19
6 APPENDIX THE 24V AC WIRE GAUGE AND TRANSMISSION DISTANCE
RELATIONSHIP SHEET .......................................................................................... 20
7 APPENDIX 12V DC WIRE GAUGE AND TRANSMISSION DISTANCE
RELATIONSHIP SHEET .......................................................................................... 21
8 APPENDIX V WIRE GAUGE REFERENCE SHEET ........................................ 22
Page 4
iii
Welcome
Thank you for purchasing our speed dome!
Please read the following safeguards and warnings carefully before you install or use the product!
Page 5
iv
Important Safeguards and Warnings Safety Measures
1. Qualified Engineer Needed
The installation engineer or maintenance engineer shall have corresponding CCTV system
installation certificate or maintenance qualification certificate.
The installation engineer or maintenance engineer shall have qualification certificate for work
at height.
The installation engineer or maintenance engineer shall have the basic knowledge and
operation technique for low-voltage cable layout and low-voltage electronic cable connection.
Please read the installation manual carefully and keep it well for future reference,
We are not liable for any problems caused by unauthorized modifications or attempted repair.
2. Lifting Appliance Requirement
Please select the proper speed dome installation mode and use the lifting appliances at the
safety environment.
The lifting appliances shall have the enough capacity to reach the installation height.
The lifting appliances shall have safe performance.
The precaution measures include two types: Warning and Note.
Warning: It is to alert you there is an optional risk of death or series injury!  Note: It is to alert you there is an optional risk of damage or property loss!
Warning
1. All installation and operation here should conform to your local electrical safety codes.
2. The power shall conform to the requirement in the SELV (Safety Extra Low Voltage) and the rated voltage conformed to Limited Power Source according to the IEC60950-1. (Power supply requirement is subject to the device label). We assume no liability or responsibility for all the fires or electrical shock caused by improper handling or installation.
3. Be sure to use all the accessories (such as power adapter) recommended by manufacturer.
4. Do not connect several speed domes to one power adapter. It may result in overheat or fire if it exceeds the rated load.
5. Before you connect the cable, install or uninstall, or begin the daily maintenance work, please turn off the power and unplug the power cable.
6. Please make sure the produce is secure firmly on the wall or the ceiling.
Page 6
v
7. Please turn off the power and unplug the power cable, If there is any smoke, disgusting smell, or noise. Please contact your local retailer or customer service centre for help.
8. All the examination and repair work should be done by the qualified service engineers. We are not liable for any problems caused by unauthorized modifications or attempted repair.
Note
1. Safety Transportation
Heavy stress, violent vibration or water splash are not allowed during transportation, storage
and installation.
This series product must use split type package during the transportation.
We are not liable for any damage or problem resulting from the integrated package during
the transportation.
2. When device is malfunction
Shut down the device and disconnect the power cable immediately if there is smoke, abnormal smell or abnormal function. Please contact your local retailer ASAP.
3. Do not try to dismantle or modify the device
There is risk of personal injury or device damage resulting from opening the shell.  Please contact your local retailer if there is internal setup or maintenance requirement.
We are not liable for any problems caused by unauthorized modifications or attempted repair.
4. Do not allow other object falling into the device
Please make sure there is no metal or inflammable, explosive substance in the speed dome.  The above mentioned objects in the device may result in fire, short-circuit or damage.  Please shut down the device and disconnect the power cable if there is water or liquid falling
into the camera. Please contact your local retailer ASAP.
Please pay attention to the camera. Avoid the sea water or rain to erode the camera.
5. Handle carefully
Do not allow this series product fall down to the ground. Avoid heavy vibration.
6. Installation Environment Requirement
This series speed dome should be installed in a cool, dry place away from direct sunlight,
inflammable, explosive substances and etc.
This series product shall be away from the strong electromagnetism radiant, please keep it
away from wireless power, TV transmitter, transformer and etc.
7. Daily Maintenance
Page 7
vi
Please use the soft cloth to clean dust on the shell, or you can use soft cloth with cleaning
liquid to clean the shell and then use soft cloth to make it dry.
Do not use gasoline, dope thinner or other chemical material to clean the shell. It may result
in shell transfiguration or paint flake.
Do not allow the plastic or rubber material to touch the shell for a long time. It may result in
paint flake.
Page 8
1
International Model
Max Transmission Distance (Ft\M)
RG59/U
750Ft (229M)
RG6/U
1,000Ft (305M)
RG11/U
1,500Ft (457M)
International Mode
Max Transmission Distance(Ft\M)
SYV-75-3 720P25fps\30fps)500M/1640Ft
720P50fps\60fps)300M/984Ft
1080P25fps\30fps):300M/984Ft
1 INTELLIGENT SPEED DOME INSTALLATION
1.1 Installation Environments
Basic Requirement
All installation and operation here should conform to your local electrical safety codes.  Before installation, please open the package and check all the components are included.
Please make sure the speed dome installation environment and installation mode can meet your requirement. If there is special requirement, please contact your local retailer for more information.
We assume no liability or responsibility for all the fires or electrical shock caused by
improper handling or installation.
1.2 Check installation space and installation location intension
Please make sure the installation environment has enough space to install the speed dome and its corresponding bracket. Please make sure the ceiling, wall and the bracket can support the speed dome and its corresponding installation component. It shall sustain the 8X weight of the speed dome.
1.3 About cable
Please select the cable according to your transmission distance. The minimum video coaxial-cable requirement is:
75 ohm.  Full cable with copper conductor
95% knitted copper shield RS485 communication cable, refer to appendix 2
Note: The above can be applied to analog speed dome and network speed dome
Note: The above can be applied to HDCVI speed dome Please refer to Appendix 2 for RS485 communication cable information. Select eclectic wire according to your transmission distance:
For 24V AC series product, please refer to Appendix 3.  For 12V DC series product, please refer to Appendix 4.
Page 9
2
1.4 Please keep all package material well for future use
Please keep speed dome package material well in case you need to send it back to your local retailer or manufacturer for maintenance work. Non-original package material may result in device damage during the transportation.
Page 10
3
2 SETUP BEFORE INSTALLATION
2.1 Check Accessories
Before the installation, please check the accessories one by one according to the packing list. Please make sure all the components listed are included.
2.2 Open Device
Remove the package and then take out the device. Please remove the protection paste from the speed dome. See Figure 2-1.
Figure 2-1
2.3 Dial Switch Setup (Analog Speed Dome)
Open the rear cover you can see there are two dial switches on the PTZ for you to set address, baud rate and etc. See Figure 2-2.
Page 11
4
2.3.1 Initial Setup
Address: 1  Parity: None  Baud rate: 9600
Figure 2-2
120Ω resistance: OFF
2.3.2 Dial Switch Setup for Intelligent Speed Dome
Before you control speed dome, please set the speed dome address, baud rate, parity. Otherwise, you cannot control the device! See Figure 2-3.
Note:
Open speed dome rear cover, you can see the dial switch buttons on the PTZ main board. You can follow the steps listed below to set the speed dome address, baud rate, and parity.
Please note you need to restart the device to activate the new setup!
There are two dial switch buttons on the PTZ of intelligent speed dome. You can use them to set speed dome address, baud rate, and parity respectively. It is 1 when you set the button as ON. For address dial switch, 1 is the lowest bit and the 8 is the highest bit. For baud rate and parity setup, 1 is the lowest bit and the 4 is the highest bit. See Figure 2-3.
Please note the intelligent speed dome self-adapt PELCO-D. PELCO-P and industrial standard protocol, the control protocol doesn’t have to be set via dial.
Page 12
5
1 2 Baud Rate
OFF
OFF
9600bps
ON
OFF
4800bps
OFF
ON
2400bps
ON
ON
1200bps
3 4 Parity
OFF
OFF
NONE
ON
OFF
EVEN
OFF
ON
ODD
ON
ON
NONE
Figure 2-3
2.3.3 Baud Rate and Parity Setup
For the dial switch button 1-4. 1 and 2 is to set baud rate. 3 and 4 is to set parity. Please refer to the following figure for detailed information. See Figure 2-4.
Figure 2-4
Please refer to the baud rate sheet for detailed information.
Please refer to the parity setup sheet for detailed information.
2.3.4 Speed Dome Address Setup
The address interface is shown as in Figure 2-5.
Page 13
6
Address
1 2 3 4 5 6 7 8 1
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
1
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
2
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
3
ON
ON
OFF
OFF
OFF
OFF
OFF
OFF
4
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
5
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
6
OFF
ON
ON
OFF
OFF
OFF
OFF
OFF
7
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
8
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
……
…………………………………………………………………
254
OFF
ON
ON
ON
ON
ON
ON
ON
255
ON
ON
ON
ON
ON
ON
ON
ON
1-2
2-3
120Ω
ON
OFF
Figure 2-5
The encode mode adopts binary system. 1 to 8 is valid bit. The highest address bit is 255. You can refer to the following sheet for more information.
2.3.5 Terminal Matching Resistance Setup
There is terminal resistance 120Ω on the main board. There are two modes: See Figure 2-6.
Figure 2-6
The factory default setup is shown as in Figure 2-7. Right now, the jumper (Connection board) is on the pin 2 and pin 3. The 120Ω resistance does not connect to the device.
Figure 2-7
If you want to connect the 120Ω resistance, please remove the jumper from the pin 2 and pin 3 and connect to pin 1 and pin 2. Now the 120Ω is connected to the circuit. See Figure 2-8.
Page 14
7
Figure 2-8
2.4 Dial Switch Setup (HDCVI Intelligent Speed Dome)
Open the rear cover you can see there are two dial switches on the PTZ for you to set address, baud rate and etc. See Figure 2-9.
Figure 2-9
Note:
HDCVI speed dome cant implement dial and other relevant RS485 settings if it only uses coaxial control.
2.4.1 Initial Setup
Address: 1  Baud rate: 9600  HD/SD video format setup: HD
120Ω resistance: OFF
2.4.2 Dial Switch Setup for Intelligent Speed Dome
Before you control speed dome, please set the speed dome address, baud rate and HD/SD video format. Otherwise, you cannot control the device! See Figure 2-10.
Note:
Page 15
8
1 2 Baud Rate
OFF
OFF
9600bps
ON
OFF
4800bps
OFF
ON
2400bps
Open speed dome rear cover, you can see the dial switch buttons on the PTZ main board. You can follow the steps listed below to set the speed dome address, baud rate, and HD/SD video format.
Please note you need to restart the device to activate the new setup!
There are two dial switch buttons on the PTZ of intelligent speed dome. You can use them to set speed dome address, baud rate, and HD/SD video format respectively. It is 1 when you set the button as ON. For address dial switch, 1 is the lowest bit and the 8 is the highest bit. For baud rate and HD/SD video format setup, 1 is the lowest bit and the 4 is the highest bit. See Figure 2-3.
Please note the intelligent speed dome can self-adapt PELCO-D. PELCO-P and industrial standard protocol, the control protocol doesn’t have to be set via dial.
Figure 2-10
2.4.3 Baud Rate and HD/SD Video Format Setup
For the dial switch button 1-4. 1 and 2 is to set baud rate. 3 and 4 is to set HD/SD video format. Please refer to the following figure for detailed information. See Figure 2-11.
Figure 2-11
Please refer to the baud rate sheet for detailed information.
Page 16
9
ON
ON
1200bps
3 4 HD/SD video format
OFF
OFF
HD
ON
OFF
SD
OFF
ON
Self-adapt
ON
ON
HD
Address
1 2 3 4 5 6 7
8
1
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
1
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
2
OFF
ON
OFF
OFF
OFF
OFF
OFF
OFF
3
ON
ON
OFF
OFF
OFF
OFF
OFF
OFF
4
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
5
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
6
OFF
ON
ON
OFF
OFF
OFF
OFF
OFF
7
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
8
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
……
…………………………………………………………………
254
OFF
ON
ON
ON
ON
ON
ON
ON
255
ON
ON
ON
ON
ON
ON
ON
ON
1-2
2-3
120Ω
ON
OFF
Please refer to the HD/SD video format setup sheet for detailed information.
2.4.4 Speed Dome Address Setup
The address interface is shown as in Figure 2-12.
Figure 2-12
The encode mode adopts binary system. 1 to 8 is valid bit. The highest address bit is 255. You can refer to the following sheet for more information.
2.4.5 Terminal Matching Resistance Setup
There is terminal resistance 120Ω on the main board. There are two modes: See Figure 2-13.
The factory default setup is shown as in Figure 2-14. Right now, the jumper (Connection board) is on the pin 2 and pin 3. The 120Ω resistance does not connect to the device.
Figure 2-13
Page 17
10
Figure 2-14
If you want to connect the 120Ω resistance, please remove the jumper from the pin 2 and pin 3 and connect to pin 1 and pin 2. Now the 120Ω is connected to the circuit. See Figure 2-15.
Figure 2-15
Page 18
11
2.5 RESET and SD Card Installation (Network Speed Dome)
Open the rear cover, there is a RESER button shown as in Figure 2-16. The RESET button is to restore system settings. The Micro-SD card installed on the driver is to storage data.
Figure 2-16
Micro-SD card should be installed on the module (see Figure 2-17), which is used for data storage.
Page 19
12
Figure 2-17
Note: Please contact the technical support of our company if you have any questions.
2.6 Cable Connection
Please connect the power cable, video output cable, audio cable, RS485 control cable, alarm input/output pin, network cable, high-frequency cable, fiber cable according to your actual requirements. Please use insulation tape to seal the cable connection ports to do proper waterproof work.
Note
Page 20
13
The video port is covered the heat shrink tube of high shrinking ratio. After the video connection, please heat the tube to make sure the video port is damp proof and water proof.
Page 21
14
3 INSTALLATION
The intelligent speed dome adopts wall mount mode.
3.1 Component Installation
The wall mount bracket and IR speed dome is shown as in Figure 3-1.
Figure 3-1
3.2 Wall Mount Installation Steps
3.2.1 Installation Environments
The wall mount speed dome can be installed in the hard construction wall in the indoor or outdoor environments. Before the installation, please make sure:
The wall is thick enough to install the expansion bolt.  The ceiling can at least sustain the 8x weight of the speed dome, bracket and the
accessories.
3.2.2 Installation Steps
1) Dig a hole of 50mm diameter for cable exit in the installation wall.
2) In Figure 3-2, connect the adapter block to the internal thread of the wall mount bracket,
until it reaches the end and then fix the set screw. Pull the intelligent speed dome composite cable through the adapter block and pull it out of the other end of the wall mount bracket. Line up the hook at the top of the external enclosure to the inside hole of the adapter block and then push it to the end, and then secure the three screws of the adapter block firmly. Please note this step is very important. Please make sure the
screws are firm, otherwise, it may result in falling risk of the intelligent speed dome.
Page 22
15
Figure 3-2
3) Dig holes in the wall according to the installation holes at the bottom of the wall mount
bracket. Please make sure the cable exit of the bracket is facing the round hole of the wall. Insert expansion bolts (not provided) to the holes you just dug. Connect the composition cable and then pull it through the hole in the wall. Use four hex screws and flat washer to secure the bracket on the wall of the expansion bolts. See Figure 3-3.
Figure 3-3
Now the installation is complete. See Figure 3-4.
Page 23
16
Figure 3-4
Page 24
17
4 APPENDIX Ⅰ LIGHTENING PROTECTION AND SURGE
PROTECTION
This series speed dome adopts TVS lighting protection technology. It can effectively prevent damages from various pulse signals below 6000V, such as sudden lighting and surge. While maintaining your local electrical safety code, you still need to take necessary precaution measures when installing the speed dome in the outdoor environment.
The distance between the signal transmission cable and high-voltage device (or high-voltage
cable) shall be at least 50 meters.
Outdoor cable layout shall go under the penthouse if possible.  For vast land, please use sealing steel tube under the land to implement cable layout and
connects one point to the earth. Open floor cable layout is forbidden.
In area of strong thunderstorm hit or near high sensitive voltage (such as near high-voltage
transformer substation), you need to install additional high-power thunder protection device or lightning rod.
The thunder protection and earth of the outdoor device and cable shall be considered in the
building whole thunder protection and conform to your local national or industry standard.
System shall adopt equal-potential wiring. The earth device shall meet anti-jamming and at
the same time conforms to your local electrical safety code. The earth device shall not short circuit to N (neutral) line of high voltage power grid or mixed with other wires. When connect
the system to the earth alone, the earth resistance shall not be more than 4Ω and earth
cable cross-sectional area shall be below 25 mm². See Figure 4-1.
Figure 4-1
Page 25
18
Baud Rate
Max Distance
2400 BPS
1800M
4800 BPS
1200M
9600 BPS
800M
5 APPENDIX ABOUT RS485 BUS
5.1 RS485 Bus Main Feature
RS485 is semi duplex communication cable of impedance 120Ω. Its max load amount is 32 effective loads (including main control device and devices to be charged).
5.2 RS485 Bus Transmission Distance
When we take 0.56mm (24AWG) twisted-pair as communication cable, the max transmission distance (theoretically) are listed below (according to different baud rates).
In the following situations, the max transmission distance shall become shorter accordingly:
The communication cable is a little bit thin;  The surrounding environment has strong electromagnetic interference;  There are too much devices connected to the RS485 bus;
And vice versa, the max transmission distance shall become longer.
5.3 The Problem in Practical Use
In practical usage, we usually adopt star type connection. The terminal resistance shall connect to the furthest two devices (Such as device 1# and device 15# in Figure 5-1 ). But this connection way does not conform to RS485 Bus standard. When the distances between devices are too long, the signal reflection occurs and anti-jamming decreases, thus the signal reliability becomes very low. You can see speed dome is not under control or speed dome is running automatically and can not stop.
Figure 5-1
In this situation, we recommend RS485 distributor. This device can turn star type connection into the connection that conforms to RS485 bus industry standard, which can avoid the above mentioned problems and enhance communication reliability. See Figure 5-2.
Page 26
19
5.4 RS485 Bus FAQ
Phenomenon
Possible Reasons
Solution
Speed dome can run self­diagnosis but I can not control it.
Host address(baud rate) and
speed dome address(baud rate) are not match;
Positive and negative end of
RS485 Bus are misconnected;
Connection cable is loose RS485 Bus connection are cut
off;
Modify host or speed dome setup Switch RS485 positive end and
negative end
Fix connection cable firmly Replace RS485 Bus.
I can control the speed dome but is not smooth
RS485 Bus connection are not
good
One RS485 bus is off The distance between host and
speed dome is too far
Parallel connected too much
speed domes.
Connect RS 485 Bus again Replace RS485 Bus Add terminal matching resistance Add RS485 distributor.
Figure 5-2
Page 27
20
mm
Feetm w
0.8000
1.000
1.250
2.000 5
488.52148.90
763.31232.66
1192.67363.53
3053.25930.63
10
244.2674.45
381.66116.33
596.34181.76
1526.62465.31
15
162.8449.63
254.4477.55
397.56121.18
1017.75310.21
20
122.1337.23
190.8358.16
298.1790.88
763.31232.66
25
97.7029.78
152.6646.53
238.5372.71
610.65186.13
30
81.4224.82
127.2238.78
198.7860.59
508.87155.10
35
69.7921.27
109.0433.24
170.3851.93
436.18132.95
40
61.0618.61
95.4129.08
149.0845.44
381.66116.33
45
54.2816.54
84.8125.85
132.5240.39
339.25103.40
50
48.8514.89
76.3323.27
119.2736.35
305.3293.06
55
44.4113.54
69.3921.15
108.4233.05
277.5784.60
60
40.7112.41
63.6119.39
99.3930.29
254.4477.55
65
37.5811.45
58.7217.90
91.7427.96
234.8771.59
70
34.8910.64
54.5216.62
85.1925.97
218.0966.47
75
32.579.93
50.8915.51
79.5124.24
203.5562.04
80
30.539.31
47.7114.54
74.5422.72
190.8358.16
85
28.748.76
44.9013.69
70.1621.38
179.6054.74
90
27.148.27
42.4112.93
66.2620.20
169.6251.70
95
25.717.84
40.1712.25
62.7719.13
160.7048.98
100
24.437.45
38.1711.63
59.6318.18
152.6646.53
6 APPENDIX THE 24V AC WIRE GAUGE AND
TRANSMISSION DISTANCE RELATIONSHIP SHEET
It is the recommended transmission distance when the cable diameter is fixed and the 24V AC power consumption is below 10%. For the AC device, the max permission voltage power consumption is 10%. For example, when a device of rated power 20W installed from the transformer 141 inches (42m), then the min cable diameter is 0.8000mm.
Page 28
21
mm
Feetm w
0.8000
1.000
1.250
2.000 5
122.1337.23
190.8358.16
298.1790.88
763.31232.66
10
61.0618.61
95.4129.08
149.0845.44
381.66116.33
15
40.7112.41
63.6119.39
99.3930.29
254.4477.55
20
30.539.31
47.7114.54
74.5422.72
190.8358.16
25
24.437.45
38.1711.63
59.6318.18
152.6646.53
30
20.356.20
31.809.69
49.6915.15
127.2238.78
35
17.455.32
27.268.31
42.6012.98
109.0433.24
40
15.274.65
23.857.27
37.2711.36
95.4129.08
45
13.574.14
21.206.46
33.1310.10
84.8128.85
50
12.213.72
19.085.82
29.829.09
76.3323.27
55
11.103.38
17.355.29
27.118.26
69.3921.15
60
10.183.10
15.904.85
24.857.57
63.6119.39
65
9.392.86
14.684.47
22.946.99
58.7217.90
70
8.722.66
13.634.15
21.306.49
54.5216.62
75
8.142.48
12.723.88
19.886.06
50.8915.51
80
7.632.33
11.933.64
18.645.68
47.7114.54
85
7.182.19
11.233.42
17.545.35
44.9013.69
90
6.782.07
10.603.23
16.565.05
42.4112.93
95
6.431.96
10.043.06
15.694.78
40.1712.25
100
6.111.86
9.542.91
14.914.54
38.1711.63
7 APPENDIX Ⅳ12V DC WIRE GAUGE AND
TRANSMISSION DISTANCE RELATIONSHIP SHEET
The recommended max transmission distance is under the following environments: The wire diameter is fixed and the DC 12V power voltage loss rate is below 10%. For the device of DC power supplying, the max allowed voltage loss rate is 10%. All the wires listed in the following
sheet are copper wire. (Copper wire resistance )
Page 29
22
Metric bare wire
diameter mm
AWG
SWG
Bare wire cross
section
mm2)
0.050
43
47
0.00196
0.060
42
46
0.00283
0.070
41
45
0.00385
0.080
40
44
0.00503
0.090
39
43
0.00636
0.100
38
42
0.00785
0.110
37
41
0.00950
0.130
36
39
0.01327
0.140
35
/
0.01539
0.160
34
37
0.02011
0.180
33
/
0.02545
0.200
32
35
0.03142
0.230
31
/
0.04115
0.250
30
33
0.04909
0.290
29
31
0.06605
0.330
28
30
0.08553
0.350
27
29
0.09621
0.400
26
28
0.1257
0.450
25
/
0.1602
0.560
24
24
0.2463
0.600
23
23
0.2827
0.710
22
22
0.3958
0.750
21
/
0.4417
0.800
20
21
0.5027
0.900
19
20
0.6362
1.000
18
19
0.7854
1.250
16
18
1.2266
1.500
15
/
1.7663
2.000
12
14
3.1420
2.500 / /
4.9080
3.000 / /
7.0683
8 APPENDIX V WIRE GAUGE REFERENCE SHEET
Note
This manual is for reference only. Slight difference may be found in the user
interface.
All the designs and software here are subject to change without prior written
notice.
All trademarks and registered trademarks are the properties of their respective
owners.
Page 30
23
If there is any uncertainty or controversy, please refer to the final explanation of us. Please visit our website or contact your local service engineer for more