dafi IPX4, IPX5 Operating Instructions Manual

Page 1
ELECTRIC INSTANTANEOUS DAFI WATER HEATER
OPERATING INSTRUCTIONS
IPX4
IPX5
Page 2
1. General information
Flow water heaters with bare DAFI heating elements are heaters in which
water is heated during its ow through the heater’s heating block, in which
bare (not insulated) heating elements (heating strands made of resistance
wire) are washed by the owing water and work only during the consumption of water (the power supplies for the heating strands is switched on by a ow connector during the water ow through the heating block). Owing to very small thermal inertia of the heating element, the hot water ows out of the heater immediately after opening the hot water valve. The water ow heaters with bare DAFI heating elements are heaters with very high energy efciency of about 98% and energy effectiveness - E<
0.125 kWh/K). In order to heat 1 l of water up to the temperature of 40 – 45oC, DAFI heaters consume only about 0.033 kWh of electricity. As a comparison, for instance, energy efciency of accumulation water heaters with the capacity of 30 l amounts to about 80% and with the capacity above 30 l - about 83%. The DAFI heater is provided with the hygiene certicate of the National In­stitute of Hygiene, “CE” certicate of compliance which gives the title to identify the product with the safety mark “B”, “CB Test Certykat” issued by Polskie Centrum Badań i Certykacji S.A. (Polish Centre for Research and Certication) in Warsaw. The DAFI heater is provided with the Protection Certicate issued by the Patent Ofce of the Republic of Poland No. 53535/95.
2. DAFI heater characteristics
The DAFI heater is intended for heating the tap water. It is mounted at water draw-off points of wash basins, kitchen sinks, showers, etc. It may be xed to one or several hot water draw-off points. The heater is particularly useful in buildings and facilities which are not equipped with the gas installation. We recommend the installation of DAFI heaters at each water draw-off point in order to avoid the water and electricity losses. Owing to very small thermal inertial of the heating element, the heated water is obtained immediately after opening the hot water valve. The DAFI heaters are manufactured with the following powers: 3 700W; 4 500W; 5 500W; 7 300W for the voltage of 230V and 7 500W; 9 000W; 11 000W for the voltage of 400V. The electricity is drawn only at the moment of water ow, therefore its use is smaller than in storage water heaters. The heating power determines the quantity and temperature of the heated water. By regulating the intensity of the water stream owing through the heater, it is possible to decrease or increase the water temperature.
Before proceeding with the assembly, it is necessary to beco-
me familiar with the instructions!
Page 3
c
o
l
d
w
a
t
e
r
h
o
t
w
a
t
e
r
The temperature of hot water owing
out of the heater is adjusted
by closing or opening of the
hot water valve slowly.
Equipment of the heater:
The set to be installed together with the tap: Heater, tap, spout with aerator (g. 1a), installation wrench, junction box (availa­ble as an additional element), operating instruc­tions, list of service centres, guarantee card.
Set for the installation with the service connec­tion: Heater, shut-off valve, ½” connection, (g. 1b), installation wrench, junction box, (available as an additional element), operating instructions, list of service centres, guarantee card.
Set for installation with the three-way tap. Heater, 2 M 18x2/ ½” reducing nipples, installation wrench, shut-off valve (available as an additional element), junction box (available as an additional element), operating instructions, list of service centres and guarantee card. For heaters with the power of 3700 W, an aerator and M 22x1/M 24x1 aera­tor reducer is supplied.
g 1
a)
b)
3. Construction of the water heater
The DAFI heater consists of the heating block placed on the water unit. The water unit is made of the base which is provided with short stub pipes for supply of cold water and discharge of hot water. Inside the heater, there is the heating block provided with water channels with the heating element (heating strand) and elements used for supplying electricity. The whole devi­ce is enclosed in an enclosure.
4. Operating principle
After opening the hot water valve, the owing water causes the ow con­nector to be switched on (power is supplied to the heating element) and the owing water directed to the tap is heated. Water temperature depends on the pressure and temperature of the water owing into the heater. The closure of the hot water valve causes the ow connector to be switched off (the power supply to the heating element is interrupted). The temperature of the water owing into the heater can be adjusted only by closing and opening of the hot water valve slowly within the scope of outow of the hot water from the heater. The smaller water ow means the higher temperature.
Page 4
5. Principles of heater operation
The properly installed DAFI heater used as intended is completely safe in use. Before the installation of the heater and before putting it into operation, it is absolutely necessary to observe the following conditions:
- the heater cannot be mounted in rooms, where temperature falls below 1°C.
- do not leave the damaged or disassembled heater connected to power supply.
- use the electrical wires with minimum section which corresponds to the rated current of the heater (see also section 6.2 of the instructions),
- observe unconditionally the sequence of connections,
- before connecting the heater to the power source, you must check whether the heater is deaerated (see section 7.1 h of the instructions),
- it is prohibited to use a damaged or faulty device,
- it is prohibited to install the heater in shower enclosures. Any use of the DAFI heater which is contrary to its purpose causes the manufacturer to not accept the responsibility for the produced damage. The manufacturer does not accept responsibility for the damage and effects re­sulting from unauthorised modications and repairs of the heater.
6. Sequence for connection of the device to the water supply system and the wiring system.
In the rst place, the DAFI water heater must be connected to the water system. Only after deaeration of the water supply system and the heater, the device may be connected to the wiring system.
6.1 Connection to the water supply system
The DAFI heaters are low-pressure devices and may operate in water supply ne­tworks with the pressure of not less than 100 000 Pa and not more than 600 000 Pa. This may be the municipal water supply system or the local one with a pressure booster, in the case of single-family buildings.
In the case of uctuations of water pressure caused, among other things, by using automatic ushing valves nearby the heater and in the case of pressure increase above 600 000 Pa, install the pressure reducer.
WARNING - Do not switch on the heater if it is likely that the water in
the heater is frozen.
6.2 Connection to the wiring system The heater with the power greater than 3.7 kW must be connected on a permanent basis to the wiring system provided with the earthing
terminal.
Page 5
The heater must be earthed.
The connection to the wiring system must be ensured by an electrician provided with an appropriate licence. The heater must be connected to the wiring system performed only in the TN-S or TN-C-S network system (according to 0), with copper wires and cross-section corre­sponding to the rated current of the heater. The wiring system must be equipped with the switch, that allows the voltage at all poles from the power source to be disconnected The overload protection of the electrical network during the installa­tion of the DAFI electrical ow water heater must be selected in ac­cordance with the rated current of the heater, given in the table with parameters.
Note! If the power cord is damaged, it should be replaced by an appropria­te cord available at the manufacturer or at the network of authorised service centres. Each percent of voltage drop below the rated voltage value decreases
the heating efciency by about 2%, and therefore, it decreases the
water heating effect.
7. Installation and operation
The DAFI water heater may be installed with its own tap, with the connection and reducing nipples. In the case of installation with the connection and nipples, it is recommended to install the DAFI shut-off valve at the water inlet to the heater. If the valve is included in the set, it may be purchased in the retail network. NOTE! The heater cannot be mounted in rooms, where temperature falls below 1°C.
7.1 Installation of the heater with its own tap
a) For the purpose of installation, use only the installation wrench included as part of the equipment. Before proceeding with the installation, close the main water valve and clean the threads. Seal the G ½” thread of the tap body with the locknut screwed on it, using the teon tape (g. 2), and then screw it into the tting protruding from the wall, in order to have the two stub pipes for xing the heating unit directed vertically upwards. b) while screwing the tap, maintain particular caution so as not to strip the thread. Do not screw in the tap while holding the knobs with both hands The correct method of screwing in the tap is shown in g. 3. c) The Distance between the face of the nut and the tting should be 1-4 mm. After establishing the position and distance of the tap, lock the nut by tightening it in the direction of the tting protruding from the wall (g. 4). d) Screw the spout to the tap, screw the xing nut onto the right stub pipe of the tap (M 18x2), check whether both tap valves are turned off, turn on the
Page 6
main water shut-off valve, turn on the cold water valve of the heater tap, letting the necessary water quantity move through it in order to remove pollution and air, which are present in the water system. d) Place the ltering sieve in the left stub pipe of the tap (g. 6.)f) The heater is mounted on two stub pipes (on top of the M 18x2 tap), and the spout or sprinkling set is moun­ted on the bottom end (g. 7). g) Tighten the nuts of the heater uniformly to the tap, avo­iding the tilting of the heater (g. 8). NOTE! h) After connecting the heater to the water supply system, deaerate the heater by opening the hot water tap valve (g. 9) until the moment of gaining certainty that there is no air in the water system. i) Switch on the power supply ONLY after the prior de­aeration of the heater as per section 7.1 h (g. 10) There is a possibility to install the DAFI water heater on the existing wall bathroom tap or kitchen faucet. In lieu of the spout, the following items can be screw into the tap: a) an elbow with M 22 x 1.5 and G ½” female threads to which the DAFI heater tap is screwed in (g. 11a). b) reducer (shower connector) with the M 22 x 1.5 female thread and G 1/2’’ male thread, to which the G1/2” elbow and then the DAFI heater tap are screwed in (g. 11b). Further installation operations are the same as in the case of installation of the heater at the end of the water supply pipe running out of the wall.
7.2 Installation of the heater with the connection
In case of installation of the heater with the connection, use only the DAFI heater with the degree of protection against wa­ter penetration - IPX4 (g. 12). In this system, the connection should be preceded by the DAFI shut-off valve (g. 13). In order to install the heater with the connection, the connecting element, which is mounted on the pipe that supplies water is used instead of the tap with the spout. Before the installation of the heater, install the shut-off valve on the pipe and let the necessary water through it in order to remove the contaminants and the air, which are present in the water system. Install the connection and x the DAFI water heater to it. During this activity, it is important to supply the cold water into the stub pipe of the heater in accordance with the marking (arrows) at
g 2
g 3
g 4
g 5
g 6
g 7
g 8
Page 7
the back of the heater (g. 13). Then, open the shut-off va­lve upstream the heater and the hot water valve on the tap
and let out the quantity of water that is necessary to deaerate
the heater. The installation of the DAFI heater in this system enables its installation next to the shower enclosure or under the wash basin or sink with the three-way faucet. It also ma­kes the supply of the heated water to several receipt points possible. The heater with the connector may operate in any position.
It is required to close the shut-off valve before the disassem­bly of the heater or before each operational break longer than 12 hours
7.3 Installation of the heater to the three-way faucet
Use only the DAFI heater with the protection degree of IPX 4 for this type of installation. The DAFI shut-off valve must be installed directly at the inlet of water to the heater. Before the installation of the heater, while turning on the DAFI shut-off valve, let the necessary water ow through it in order to remove the contamination and air which are present inside the water system. Con­nect the DAFI heater, using the reducing nipples and hoses for the shut-off valve and the tap. Then, open the valve that shuts off the water supply to the heater and the hot water valve on the tap and let out the wa­ter quantity that is necessary to deaerate the heater.
8. Operation NOTE!
Before connecting the heater to the wiring system, deaerate the heater (see section 7.1.h, 7.2 and 7.3). If the air ows out instead of water during the use, close the water supply immediately and disconnect the power supply for the heater. Power supply may be switched on again after the heater is deaerated. Do not switch on the heater, if it is likely that the water in the heater is frozen (as mentioned above in warning from section 6.1).
The contamination of the aerator may cause:
- reduction or total disappearance of water outow,
- excessive heating of water or such decrease in the water outow which prevents the heater from being switched on.
g 10
g 11
a
b
g 12
cold
water
hot
water
g 13
g 9
Page 8
It is recommended to clean the aerator of the limescale regularly in order to unblock it.
The cleaning of the aerator is very simple - it consists in “pushing out” the limescale by pushing in the rubber inset of the aerator (g. 14). In order to extend the life of the heater, there is a ltering sieve placed in the left stub pipe of the tap. An excessive increase in the water temperature, a signicant decrease in the water outow or lack of outow may mean the necessity to clean the ltering sieve or to replace it.
It is recommended to install the DAFI mechanical water lter upstre­am the DAFI heater
9. Instructions regarding connection to the wiring grid by means of the DAFI junction box (available as the additional equipment)
The heaters with the power of 3,7 kW, in accordance with the change intro­duced into EN 60335-2-35/A1:2007, may be connected to power supply, using the non-disconnectable power cable with a socket. Other heaters should be connected on a permanent basis to the wiring system. For such a connection, we can use the DAFI junction box (g. 15, g. 16, g. 17 and g. 18).
a) Insert the body of the junction box (1) into the standard ushed box for the auxiliary electrical equipment (2) in accordance with the markings on the box (3), then push it so that the body seal (4) could press against the wall on its whole circumference and x it by means of expansion bolts and screws (5) (a
section without a seal at the bottom of the body (6)
must remain unsealed, it serves the purpose of di­scharging the possibly collecting moisture) (g. 15.).
b) Connect the heater wire (7) with the wires of the system (8) using the terminal block (9), x the wire by means of the wire contact (10) and screws (11), push in the terminal block with the connected and xed wire into the socket (12) in the body of the box (g. 18). Please pay particular attention to the pro­per connection of the earthing wire and to provision of the proper electrical connection by strong and solid tighte­ning of the terminals.
c) Place the box cover (13) Slide the cover onto the box from the bottom, along the heater wire until the bottom hitches (14) of the cover are slid in under the body of the box, then press the cover strongly to the body making sure that the dowels in the cover (15) are slid into openings (16) in the body of the box (g. 17).
d) In order to remove the cover, slide in the slot head screwdriver (17) into the side gap between the boxy of the box (1) and the cover (13), and turn it by 90o. (g.18) NOTE: In the case of failure to purchase
g 14
g 15
Page 9
the original junction box manufactured by our company, it is possible to use a different commer­cially available junction box.
DECLARATIONS OF COMPLIANCE FOR THE HEATERS ARE AVAILABLE AT THE FOLLO­WING WEBSITE ADDRESS:
www.DAFI-heaters.com/pl/ in the “certicates” tag
10. Guarantee
The guarantee period lasts 24 months, commen­cing from the date of sale of the heater. The de­fects revealed during the term of the guarantee will be removed free-of-charge within 14 days of the date of delivery of the heater to the authorised service centre, or the manufacturer (the list of se­rvice centres is provided in the packaging). The purchaser is obliged to deliver the DAFI heater to the service centre together with the warranty card. The lack of the guarantee card or the damage to the seal causes the loss of the guarantee. The observance of the principles given in these operating instructions ensures proper operation of the DAFI heater. NOTE! In accordance with the International Safety Standards, heating equipment should be subject to periodical surveys every 30 months. The average life of the DAFI water heater, if it is operated in accordance with the operating instructions and recommendations of the manufacturer is about 7-8 years.
11. Causes of anomalies in the operation of the heater.
- when the water is heated by the heater insufciently: a) check the voltage of the power supply network and rectify the possible causes of voltage drop,
- when the water is heated by the heater excessively: a) clean the aerator (photograph 16), b) clean the ltering sieve in the left stub pipe of the tap, c) check the patency of the water supply system upstream the heater,
- when the heater does not function: a) check the power supply and possibly check the fuses, b) check whether the water pressure in the water supply network is not too low, which is revealed by the poor water ow through the heater,
g 16
g 17
g 18
Page 10
Information for the user on the
removal of the waste electrical equipment
In pursuance of the Waste Electrical and Electronic Equip-
ment Act of 29 July 2005 (Journal of Laws dated 20 Septem-
ber 2005, No. 180, item 1495)
The symbol placed on the equipment or the packaging indicates
that the waste equipment may not be treated like general household
waste and that upon ending the operation period, it must be brought
to one of the electrical and electronic equipment selection points or-
ganised by the public administration.
1) it is prohibited to mix the waste equipment with other waste;
2) the mixing of the waste equipment with other waste carries a risk
for the environment which consists in the increased amount of litter in
the environment, as the plastics used in the process of manufacturing
the product are materials which are not subject to decomposition, the
equipment does not contain any other hazardous components;
3) heating mass - about 1 kg;
At the same time, it is announced that in accordance with the regula-
tions of the aforementioned act, the system for collection of the wa-
ste equipment is being organised, at the present stage, it is possible
to dispose of the equipment at selected service centres - articles 27
and 28 of the Act.
A household fulls an important role in contributing to the reuse and
recycling of the waste equipment; at this stage the attitudes which
inuence the safeguarding of the common good which is the clean
natural environment are shaped. Households are also some of the
largest users of small equipment and its rational management at this
stage inuences the recycling of secondary raw materials.
- the cause of breaks in the operation of the heater is: a) excessively low or decreasing water pressure in the water supply network. The repairs of the device must be performed in the authorised service centre exclusively.
Page 11
1. base
2. long contacts
3. housing
4. short contacts
5. connector nut
6. connection wire
7. connector
8. connector seal
9. heating element
10. membrane
tappet
11. membrane
12. membrane
cover
13. oring
14. ceramic pipe
1. contacts
2. base
3. housing
4. heating element
5. tap
6. spout
7. connection wire
NOTES ON INSTALLATION OF DAFI WATER HEATERS
DAFI energy saving water heaters can be installed above, or under your basin or sink. Shower installations are also possible, but never inside the shower cubicle. Installation of your water heater in the ceiling or behind the wall, or in a cupboard next to the shower should be considered.
DAFI water heater Installation Requirements:
1. DAFI water heaters must be installed as close to the point of use as possible to minimise pipeline heat loss.
2. Water pressure must not be less than 60kPa (0.6 bar) and not exceed 600kPa (6bar). If water pressure is too high, a pressure reducing valve must be installed.
3. Water quality e.g. mains supply, borehole, river etc. Should water quality be suspect, a filter must be installed.
4. Single phase or 3 phase power supply with own isolator switch must be available as close as possible to point of usage.
DAFI water heater Installation Procedure:
Installing the DAFI energy saving water heater is not complicated, but it needs to installed by a professional plumber and electrician for problem-free operation.
Water supply:
To be undertaken by a qualified Plumber
• Incoming water supply should be clean and without any suspended solids or organic materials.
The "static" incoming cold water supply pressure to be accurately measured to ascertain operating conditions.
The maximum operating pressure of all DAFI Heater models is 600 kPa (6 Bar).
A suitable Pressure Reducing Valve is to be installed before the heater unit, should this 600 kPa limit be exceeded.
• Heater manifold nut assembly must only to be tightened with the spanner supplied in each box.
All air to be vented from the heater unit prior to connecting the 240 volt or 400 volt 50 Hz power supply.
A cut-off valve should be installed on the water inlet line to the DAFI heater.
All heater units for under sink installation can be installed at any angle.
Recommendations:
• Installing a composite pipe from your DAFI water heater to the point of usage will further reduce heat loss and save more energy.
• For optimum performance enhancement Spray Nozzle provided should be attached to tap. For models 3.7 kW & 4.5 kW Spray Nozzle is highly recomended. Spray Nozzle spread water and rise pressure of hot water.
• Beware of over tightening , use plastic key provided. Do not use metal spanner!
• For performance see table FT - flow/temperature
Tips:
1.Each installation is indywidual. Performance of Dafi Heater depends on: voltage drop, temperature of cold water, pressure , type of taps, distance of instalation from point of use, etc. Selection of right power should be done by experienced and competent trade person.
2. Before you buy check if obtained flow corresponds to your demands.
Electric supply: To be undertaken by a qualified Electrician
1. Each heater unit is to be wired to the Distribution Board via the existing Earth Leakage System. Minimum 3 core cable sizes*
- 2.5mm² for 3.7 kW & 4.5kW (240V)
- 4 mm² or 2x2.5mm²(ring) for 5.5 kW & 7.3kW - (240V)
- 2.5mm² for 7.5kW these models is two phase no neutral -(400V)
- 4 mm² 9 kW & 11kW these models are two phase no neutral -(400V) *size of cable need to be confirmed with installation method and voltage drop
2. Models 7.5 kW - 11kW are non-domestic unles three phase supply system in property. Any combination of two phases no neutral (eg brown/black=400V).
3. A dedicated suitably sized breaker to be installed on the Distribution Board for each heater unit.
4. A suitable sized 2 pole electric isolator (not fuse spur) to be installed.
5. DAFI heater units are not to be connected to the electrical supply by standard BS 1363 wall plug.
SPECIFICATIONS
[kW] Rated power consumption
3.7 4.5 5.5 7.3 7.5 9 11
[~V]
Rated voltage
1/N/PE~ 240V 50Hz 2/PE~ 400V 50Hz
[A]
Rated current 16 19.6 24 31.7 18.75 22.5 25
[A1]
Automatic breaker
16 20 25 32 20 25 32
[B1]
Wa ter ciency measured in liters / the minimum temperature of owing water 15°C and pressure 200 000 Pa
40°C
1.9 2.4 2.9 4 4 4.7 5.8
45°C
1.7 2 2.5 3.3 3.3 4 5.1
≤ 1300 cm - 15°C
FT - ow/temperature
Page 12
Manufacturer: FORMASTER S.A 25-818 KIELCE,
Fabryczna 24 str., Poland
phone.: +48 41 3464810 ext 123 fax +48 41 3464870
www.formaster.com
Loading...