7
2-2-1) Periodic Maintenance and Service
Schedule
A. In order to effectively maintain the excellent performance
and fully utilize the features of this apperatus and to
lengthen the life of mechanism and tapes, we strongly
urge you to perform the periodic maintenance and
inspection as described below.
• Following should be done after the substition of parts of
deck or correction of deck failure.
B. Cleaning of the DRUM TOTAL ASS`Y
- Slowly turnning DRUM TOTAL ASS`Y, wipe the drum
surface with clean cloth soaked in alchol. (Don’t connect
the power when turnning the UPPER DRUM)
- Don’t wipe the Head-Tip vertically with cleaning cloths.
C. Tape transporting section cleaning
- Clean the tape transporting section with clean cloth
soaked in alchol.
D. Driving section cleaning
- Clean the driving section with clean cloth soaked in
alchol.
E. Everyday inspection
- Perform the maintenance and inspection periodically
according to the number of use.
- Refer to the table 2.2.3.
2-2-2) Cleaning and Lubrication
A. Cleaning of Tape Transporting section and driving section
a. Cleaning of Tape Transporting section
- The following parts shoule be cleaned after every 500
hours of use.
• TENSION POLE • S SLANT POLE
• AC HEAD/AE HEAD • GUIDE POST
• VIDEOHEAD / DRUM • T GUIDE POST
• FE HEAD • T SLANT POLE
• CAPSTASN SHAFT • S GUIDE ROLLER
• T GUIDE ROLLER • PINCH ROLLER
- Because the above part contact with video tape, they
tend to be stained with dusts and foreign substances
which make the bad effect on the picture and sometimes lead to the tape damage.
- Be sure to check the remained alchol during cleaning
evaporated thoroughly before using a tape.
b. Cleaning of the driving section
• REEL TABLE
• CAPSTAN FLYWHEEL/PULLEY
• REEL PULLEY
B. Lubrication
• REEL GEAR POST : After the cleaning the parts with
alchol, lubricate them with one or twol drops of ool
• S/T REEL TABLE POST : After the cleaning the parts
with alchol, lubricate them with grease.
2-2 Periodic Maintenance and Service Schedule
2-2-3) Service Sechedule for each parts
Following parts should be checked according to the recommanded intervals
: Check and replace if necessary. : Replace
Period Service (Hours)
PART Name 1000 2000 3000 4000 5000
DRUM TOTAL ASS’Y
CAPSTAN MOTOR
L/C BRKT TOTAL ASS’Y
REEL BELT
IDLER PLATE TOTAL ASS’Y
REEL TABLE
T BRAKE ASS’Y
TENSION BAND ASS’Y
PINCH ROLLER ASS’Y
AC HEAD ASS’Y
FE HEAD
REEL BRKT TOTAL ASS’Y
NOTE:
Independant of the above service shedule, Cleaning and lubrication and replacement of the
belt sould be undertaken every 2 years.